This document contains questions and answers regarding a federal solicitation to supply a high resistance grounding system for Fort Peck Dam in Montana. The U.S. Army Corps of Engineers, Omaha District is seeking to replace aging low impedance reactors and breakers with a modern high resistance grounding system for all five generating units. Bidders have the option to demonstrate seismic qualifications through either shake table testing or calculations, and calculations must use an Ip value of 1.5. Surge protection is not shown on outline drawings but bidders may provide new enclosures. Interested parties can find the solicitation on www.fbo.gov using number W9128F20Q0025. The delivery location is the Fort Peck Dam Powerhouse. Registration in the System for Award Management database is required to access solicitation documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USACE, Omaha District, Ft Peck HRG Contractor Questions Project: Ft Peck High Resistance Ground Supply
Solicitation: W9128F20Q0025
Disclaimer: Official government requirements are outlined in the final solicitation specifications.
Question: Question: Is shake table method required or is the calculation method allowed for meeting seismic qualifications. Is a Ip=1.5 required when performing calculations?
Answer: Seismic qualifications of equipment supplied may be performed using either method (shake table or calculations). When performing calculations, an Ip = 1.5 is required as listed in the specifications.
Question: In reference to Section 26 11 15.00 26, 2.10 Surge Protection, it is not mentioned with the HRG assembly and it is our intention to have it supplied as a separate unit in its own enclosure.
However, to my knowledge, the outline drawing does not show this anywhere and I want to make sure this has been accounted for and is acceptable. There is also the issue of connecting the two of them, so please take into consideration that USACE is the contractor and these units will be shipped separately and not cabled together.
The estimated enclosure footprints will be around 6'w x 3'd for the high resistance assembly and 4'w x 2'd for the surge protector assembly.
Answer: Surge protection is not shown in the outline drawing as it is located in a different part of the facility. The Project has existing cabinets and it is at the Bidder's discretion to provide new surge protection cabinets.