Am_0003-Drawings.pdf

PDF 579 KB Posted

Attached to
Renovation of the Wing Command Post 90, MW Building 250, F. E. Warren AFB, WY
Solicitation number
W9128F-19-B-0008
Issued by

About this file

This document package includes construction drawings and specifications for the renovation of the Wing Command Post 90 located in Building 250 at F.E. Warren Air Force Base in Wyoming. The project involves renovating approximately two-thirds of the basement, totaling 11,468 square feet, and includes demolishing the existing concrete floor slab and interior partitions, installing a new lowered concrete slab, constructing new walls, restrooms, finishes and associated mechanical and electrical systems. Bids for the project are due on or about October 20, 2019. The solicitation closes on the same date, and is a 100% small business set-aside. The construction cost is estimated between $1,000,000 and $5,000,000. The contractor must commence work within 10 days of notice to proceed and complete the project within 365 calendar days. Performance and payment bonds are required.

View the file

Other files

File Type Posted
19B0008 (OF 1419A) Page 3.pdf PDF
19B0008 (OF 1419A) Page 2.pdf PDF
19B0008 (OF 1419).pdf PDF
Am_0004.pdf PDF
BIM File Instructions.pdf PDF
Am_0003.pdf PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
W9128F19B0008-Drawings.PDF PDF
W9128F19B0008-Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

EF

UP

UP

UP

UP UP

UP

DN

UP UP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19

AA

BB

CC

DD

EE

FF

GG

HH

JJ

KK

LL

MM

NN

B A-300

A A-300

TRAINING

B21

OFFICE

B21A

GUARD

SHACK

B02

ENTRAPMENT

AREA

B01

EA CELL

B04

UPS

B11

MAIN COMM

B13

STORAGE

B12

KITCHENETTE

B10

STORAGE

B08

EOC CHIEF

B07

COMM

B09

OFFICE

COMPUTER

ELECTRICAL

CORRIDOR

MECHANICAL

MECH-2

TOILETBREAK

OFFICE

STORAGE

UNISEX

B06

MECHANICAL

MECH-1

STAIRS

ST-1

FITNESS

B20

CP CHIEF

OFFICE

B22

SUPERINTENDENT

& C2 OPS

OFFICE

B23

NCOIC CP

OPS

B18

WOMEN

B19

JANITOR

B16

STORAGE

B15

CORRIDOR

COR-1

STAIRS

ST-2

CRISIS

ACTION

TEAM

B24

CMDR

OFFICE

B25

STAIRS

ST-3

'-9

'-0

'-0

'-0

'-0

'-0

'-0

'-0

'-0

'-0

'-0

'-9

5'

-6

12'-9" 12'-0" 12'-9" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 11'-10 1/2" 11'-10 1/2" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 18'-9" 18'-9"

218'-9"

MEN

B17

AREA NOT IN CONTRACT

VESTIBULE

B05A

STEP DN

CORRIDOR

COR-2RAMP

RAMPD

N

GLOBAL

ASNT.

ANTENNA

EQUIP. RM.

B03

AREA NOT IN

CONTRACT EXCEPT

AS INDICATED ON

DRAWING AD-100

CONFERENCE

ROOM

B05

OPEN OFFICE

B00

AREA NOT

IN CONTRACT

NOTES:

1. FURNITURE IS NOT IN CONTRACT (NIC)

2. MONITORS ARE NOT IN CONTRACT (NIC) US Army Corps of Engineers ® Omaha District

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

M W

B U

IL

D

IN

G

FE

W

AR

R

EN

A

FB

, W

YO

M

IN

G

G H

LN

9-

A-100

N

EW

B A S

EM

EN

T F L

O O

R P

LA

N

C

O M

PO

S I

TE

R

EN

O

VA

TE

W

IN

G

C O

M M

AN

D

P O

ST

0, O M

A H A

D

IS

T R

IC

T O

M

AH

A, N

EB

R

AS

KA

K.

J

AR

VI

S/ T

.W

IE

R D

A

K.

J

AR

VI

S/ T

.W

IE

R D

A

T.

W

IE

R

D A

B.

G

O R

U P

/1

6/

W

F-

-B

-0

FE

_R

EN

O

0_ C

EN

TR

AL

_V

.R

VT

W R

N -B

-7

0 20'10'5'

PLAN NORTH

3/32" = 1'-0"A-100

1 NEW BASEMENT FLOOR PLAN - COMPOSITE

GENERAL NOTES (SHEETS A-100 THRU A-103):

1. INTERIOR DIMENSIONS ARE TO FACE OF EXT. WALLS,

FACE OF STEEL STUDS, OR TO COLUMN CENTER

LINES.

2. DOOR OPENINGS SHALL BE LOCATED 4" AWAY FROM

ADJACENT PERPENDICULAR WALLS, UNLESS NOTED

OTHERWISE (U.N.O.).

3. WALL TYPES CAN BE FOUND ON SHEET A-500.

4. ALL CHANGES IN FLOORING MATERIALS OCCUR AT

THE CENTERLINE OF DOORS IN THE CLOSED

POSITION, U.N.O.

AREA "A"

AREA "B"AREA "C"

KEYPLAN- BASEMENT FLOOR

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G

EN

ER

AL

R

EV

IS

IO

N

S D e c

, 2

UP

15 16 17 19

H

J

K

L

M

N

STORAGE

B08

EOC CHIEF

B07

UNISEX

B06

STAIRS

ST-1

B0

B0

B0

'-9

'-0

'-0

'-0

'-0

2A

2C

AREA "B"

AREA "A"

AREA "B"

AREA "A"

2A

A-112

VESTIBULE

B05A

STEP DN

AL

IG

N

CENTER

WALL ON

COLUMN

ALIGN

FEC

AL

IG

N

22 25

S-301

S-301

OPEN OFFICE

B00

RAISED ACCESS FLOOR (RAF)

NOTES:

1. FURNITURE IS NOT IN CONTRACT (NIC)

2. MONITORS ARE NOT IN CONTRACT (NIC)

US Army Corps of Engineers ® Omaha District

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

M W

B U

IL

D

IN

G

FE

W

AR

R

EN

A

FB

, W

YO

M

IN

G

G H

LN

9-

A-101

N

EW

B

AS

EM

EN

T

FL

O O

R P

LA

N

AR

EA

'A

R

EN

O

VA

TE

W

IN

G

C O

M M

AN

D

P O

ST

0, O M

A H A

D

IS

T R

IC

T O

M

AH

A, N

EB

R

AS

KA

K.

J

AR

VI

S

K.

J

AR

VI

S

T.

W

IE

R

D A

B.

G

O R

U P

/1

6/

W

F-

-B

-0

FE

_R

EN

O

0_ C

EN

TR

AL

_V

.R

VT

W R

N -B

-7

3/16" = 1'-0"A-101

1 NEW BASEMENT FLOOR PLAN - AREA "A"

AREA "A"

KEYPLAN- BASEMENT FLOOR

KEYNOTES - AREA PLANS

MARK DESCRIPTION

2 ALIGN NEW WALL WITH EXISTING WALL

4 NOT USED.

5 BUILD NEW LANDING & STEP FOR NEW DOOR OPENING

0 4' 8' 12'

PLAN NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G en er al R ev is io ns

D e c

, 2

GENERAL NOTES (SHEETS A-100 THRU A-103):

1. INTERIOR DIMENSIONS ARE TO FACE OF EXT. WALLS,

FACE OF STEEL STUDS, OR TO COLUMN CENTER

LINES.

2. DOOR OPENINGS SHALL BE LOCATED 4" AWAY FROM

ADJACENT PERPENDICULAR WALLS, UNLESS NOTED

OTHERWISE (U.N.O.).

3. WALL TYPES CAN BE FOUND ON SHEET A-500.

4. ALL CHANGES IN FLOORING MATERIALS OCCUR AT

THE CENTERLINE OF DOORS IN THE CLOSED

POSITION, U.N.O.

LEGEND

R

EV

IS

ED

A N

D R

ED

R

AW

N

R

EF

UP

DNDN

UP

UP

DN

UP

DN

10 11 12 13 14 15 16 17 19

A

B

C

D

E

F

G

B A-300

TRAINING

B21 OFFICE

B21A

GUARD

SHACK

B02ENTRAPMENT

AREA

B01

EA CELL

B04

UPS

B11

MAIN COMM

B13

STORAGE

B12

KITCHENETTE

B10

COMM

B09

MECHANICAL

MECH-1

FITNESS

B20

CP CHIEF

OFFICE

B22

SUPERINTENDENT

& C2 OPS

OFFICE

B23

NCOIC CP

OPS

B18

WOMEN

B19

JANITOR

B16

STORAGE

B15

CORRIDOR

COR-1

STAIRS

ST-2

B0

B0

B2

B2

B2

B1

B1

B1

B1

B2

B1

B24

ST-2A

ST-2B

M

O N

IT

O

R S

R

AM

P

U

P

CLEAR

. 5'-0"

'-0

'-0

'-0

'-0

'-0

'-9

6' -6

/8

4' -4

/8

'-6

5'

-9

16'-2 1/2" 13'-0" 30'-0"

11'-10 1/2" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 18'-9" 18'-9"

MEN

B17

2 2C

AREA "B"

AREA "A"

AREA "B"

AREA "A"

AR

EA

"C

AR

EA

"B

AR

EA

"C

AR

EA

"B

A-501

A-501

A-501

A-501

A-510

W1

11 1

1A 1A

1A

1A

1A

A-111

A-104 1

'-9

4A

TYP.

UP

CORRIDOR

COR-2

M

EC

H -1

A-510

1 RAMP 1

UP 10"+

D N

SENSITIVE

EQUIPMENT IN

THIS AREA TO

BE LEFT

UNDISTURBED

EXIST'G

KITCHEN

EQUIP'T

4'-0"

5' -9

B1 32C

ALIGN

3' -6

B0 4A

NEW CONC. SLAB,

SEE STRUCT.

B09

B1

AL

IG

N

STEP DN

FEC

FEC

FE

C

B03

W3

GLOBAL

ASNT.

ANTENNA

EQUIP. RM.

B03

B0 4B

EX

IS

TI

N

G C

O U

N

TE

R

TO

P

2A

2C 1 3

2 2 2C

2C

2C

2C

2C

2C

A-700

CONFERENCE

ROOM

B05

OPEN OFFICE

B00

B05

W3

B1

RAISED ACCESS FLOOR (RAF)

US Army Corps of Engineers ® Omaha District

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

M W

B U

IL

D

IN

G

FE

W

AR

R

EN

A

FB

, W

YO

M

IN

G

G H

LN

9-

A-102

N

EW

B

AS

EM

EN

T

FL

O O

R P

LA

N

AR

EA

'B

R

EN

O

VA

TE

W

IN

G

C O

M M

AN

D

P O

ST

0, O M

A H A

D

IS

T R

IC

T O

M

AH

A, N

EB

R

AS

KA

K.

J

AR

VI

S/ T

.W

IE

R D

A

K.

J

AR

VI

S/ T

.W

IE

R D

A

T.

W

IE

R

D A

B.

G

O R

U P

/1

6/

W

F-

-B

-0

FE

_R

EN

O

0_ C

EN

TR

AL

_V

.R

VT

W R

N -B

-7

3/16" = 1'-0"A-102

1 NEW BASEMENT FLOOR PLAN - AREA "B"

AREA "B"

KEYPLAN - BASEMENT FLOOR

0 4' 8' 12'

PLAN NORTH

KEYNOTES - AREA PLANS

MARK DESCRIPTION

2 ALIGN NEW WALL WITH EXISTING WALL

4 NOT USED.

5 BUILD NEW LANDING & STEP FOR NEW DOOR OPENING

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G en er al R ev is io ns

D e c

, 2

9GENERAL NOTES (SHEETS A-100 THRU A-103):

1. INTERIOR DIMENSIONS ARE TO FACE OF EXT. WALLS,

FACE OF STEEL STUDS, OR TO COLUMN CENTER

LINES.

2. DOOR OPENINGS SHALL BE LOCATED 4" AWAY FROM

ADJACENT PERPENDICULAR WALLS, UNLESS NOTED

OTHERWISE (U.N.O.).

3. WALL TYPES CAN BE FOUND ON SHEET A-500.

4. ALL CHANGES IN FLOORING MATERIALS OCCUR AT

THE CENTERLINE OF DOORS IN THE CLOSED

POSITION, U.N.O.

LEGEND

R

EV

IS

ED

A N

D R

ED

R

AW

UP

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A A-300

OFFICE

COMPUTER

ELECTRICAL

CORRIDOR

MECHANICAL

MECH-2

CRISIS

ACTION

TEAM

B24

CMDR

OFFICE

B25

STAIRS

ST-3

B26

B24

ST-3

10 VIDEO MONITORS, N.I.C.

12'-9" 12'-0" 12'-9" 12'-0" 12'-0" 12'-0" 12'-0" 12'-0" 11'-10 1/2"

AR

EA

"C

AR

EA

"B

AR

EA

"C

AR

EA

"B

A-501

W2

AREA NOT IN CONTRACT

AREA NOT IN CONTRACT

A-104

1 1

A-501

FE

C

109'-4 1/2"

'-0

'-0

'-0

'-0

'-9

'-9

RAISED ACCESS FLOOR (RAF)

US Army Corps of Engineers ® Omaha District

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

M W

B U

IL

D

IN

G

FE

W

AR

R

EN

A

FB

, W

YO

M

IN

G

G H

LN

9-

A-103

N

EW

B

AS

EM

EN

T

FL

O O

R P

LA

N

AR

EA

'C

R

EN

O

VA

TE

W

IN

G

C O

M M

AN

D

P O

ST

0, O M

A H A

D

IS

T R

IC

T O

M

AH

A, N

EB

R

AS

KA

K.

J

AR

VI

S/ T

.W

IE

R D

A

K.

J

AR

VI

S/ T

.W

IE

R D

A

T.

W

IE

R

D A

B.

G

O R

U P

/1

6/

W

F-

-B

-0

FE

_R

EN

O

0_ C

EN

TR

AL

_V

.R

VT

W R

N -B

-7

3/16" = 1'-0"A-103

1 NEW BASEMENT FLOOR PLAN - AREA "C"

AREA "C"

KEYPLAN - BASEMENT FLOOR

0 4' 8' 12'

PLAN NORTH

KEYNOTES - AREA PLANS

MARK DESCRIPTION

2 ALIGN NEW WALL WITH EXISTING WALL

4 NOT USED.

5 BUILD NEW LANDING & STEP FOR NEW DOOR OPENING

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G en er al R ev is io ns

D e c

, 2

LEGEND

GENERAL NOTES (SHEETS A-100 THRU A-103):

1. INTERIOR DIMENSIONS ARE TO FACE OF EXT. WALLS,

FACE OF STEEL STUDS, OR TO COLUMN CENTER

LINES.

2. DOOR OPENINGS SHALL BE LOCATED 4" AWAY FROM

ADJACENT PERPENDICULAR WALLS, UNLESS NOTED

OTHERWISE (U.N.O.).

3. WALL TYPES CAN BE FOUND ON SHEET A-500.

4. ALL CHANGES IN FLOORING MATERIALS OCCUR AT

THE CENTERLINE OF DOORS IN THE CLOSED

POSITION, U.N.O.

R

EV

IS

ED

A N

D R

ED

R

AW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19

AA

BB

CC

DD

EE

FF

GG

HH

JJ

KK

LL

MM

NN

B04

B07 B06

B08

B01

B02

B09

B11

B13

B12

B10

MECH-1B

A-300

A A-300

STAIRS

ST-1

B20

B22B23 B21 B21A

B18

B19

B16 B15

COR-1

STAIRS

ST-2B24

B25

STAIRS

ST-3

B17

B05A

COR-2

3'-8" +/-

G W

B

SO

FF

IT

'-6 " A

FF

SLOPE DECORATIVE

PANELS UP AT VIDEO

MONITORS

SOFFIT FOR

MECH

GRILLE

B03

SLOPE DECORATIVE

PANELS UP AT VIDEO

MONITORS

97' - 5 1/2"

B00

B05

SD

GWB CEILING

RECESSED CAN LIGHTING FIXTURE

SMOKE DETECTOR (REFER TO FA DWGS)

EXIT SIGN LOCATION (REFER TO FA DWGS)

1' X 1' DOWNLIGHT

2' x 4' DOWNLIGHT

1' X 8' PENDANT

PROJECTION SCREEN (SURFACE MOUNT)

DIFFUSER

RETURN

ROOM NUMBERB00

2X2 ACT CEILING TILE

NOTES:

1. FURNITURE IS NOT IN CONTRACT (NIC)

2. MONITORS ARE NOT IN CONTRACT (NIC)

US Army Corps of Engineers ® Omaha District

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

M W

B U

IL

D

IN

G

FE

W

AR

R

EN

A

FB

, W

YO

M

IN

G

G H

LN

9-

A-130

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

R

EN

O

VA

TE

W

IN

G

C O

M M

AN

D

P O

ST

0, O M

A H A

D

IS

T R

IC

T O

M

AH

A, N

EB

R

AS

KA

K.

J

AR

VI

S/ T

.W

IE

R D

A

K.

J

AR

VI

S/ T

.W

IE

R D

A

T.

W

IE

R

D A

B.

G

O R

U P

/1

6/

W

F-

-B

-0

FE

_R

EN

O

0_ C

EN

TR

AL

_V

.R

VT

W R

N -B

-7

3/32" = 1'-0"A-130

1 REFLECTED CEILING PLAN

KEY NOTES - REFELECTED CEILING PLAN

MARK DESCRIPTION

1 NO WORK TO CEILING IN THIS AREA

2 WORK IN THIS AREA LIMITED TO REMOVAL AND

REPLACEMENT OF EXISTING ACT CEILING TO

ROUTE NEW DUCTS, PIPING, AND UTILITIES.

CEILING LEGEND:

0 20'10'5'

PLAN NORTH

AREA "A"

AREA "B"AREA "C"

KEYPLAN- BASEMENT FLOOR

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G en er al R ev is io ns

D e c

, 2

R

EV

IS

ED

A

N D

R

ED

R

AW

2-1/2" STL STUDS @ 16" O.C. W/ 5/8"

GWB--SEE SPEC. SECTION 09 29 00

FOR TYPE OF GWB AT VARIOUS

LOCATIONS

1SCALE: NTS

FURRING

FINISH IF INDICATED IN ROOM FINISH

SCHEDULE OR INTERIOR

ELEVATIONS

1"

EXIST'G STONE/MASONRY WALL

WHERE OCCURS

2" RIGID INSULATION

GLUED TO BACK OF STUDS

1" AIRSPACE

1A2-1/2" STL STUD @ 16" O.C.

W/5/8" GWB - WITHOUT

RIGID INSULATION

4" STEEL STUDS @ 16" O.C.

5/8" GWB--SEE SPEC. SECTION 09 29 00

FOR TYPE OF GWB AT VARIOUS

LOCATIONS

2SCALE: NTS

STEEL STUD PARTITION

2ASTC 45, WITH 6" STEEL

STUDS IN LIEU OF 4" STUDS

TILE IF INDICATED IN ROOM FINISH

SCHEDULE OR INTERIOR ELEVATIONS

2BSTC 45, WITH 8" STEEL

STUDS IN LIEU OF 4" STUDS

2CWITH 4" STEEL STUDS AND

NO INSULATION

STC 45 MINIMUM

3" MINERAL FIBER BATTS AT STC RATED PARTITIONS

4" 20 GA. STEEL STUDS @ 16"

O.C. W/ GUSSETS @ EA. STUD

5/8" GLASS MAT GWB

3SCALE: NTS

PLUMBING CHASE

TILE AS INDICATED ON

INTERIOR ELEVATIONS

3" MINERAL FIBER SOUND

BATTS ON ONE SIDE

PE

R

P

LA

N S

OPT. 1--1/2" GWB X 12" HIGH

GUSSET ATTACHED TO EA.

STUD W/ 3 DRYWALL SCREWS

OPT. 2--STUD TRACK GUSSET

W/ 2 SCREWS PER STUD

5/8" GLASS MAT GWB

NOTE: GUSSETS TO BE

SPACED 48" O.C. MAX.

VERTICALLY

STEEL OR WOOD STUDS @ 16"

O.C. TO MATCH EXISTING

5/8" GWB (TYPE "X" AT F.R. WALLS)

4SCALE: NTS

STUD WALL INFILL

USED TO INFILL DOOR OPENING IN EXISTING WALL

M

AT

C H

EX

IS

TI

N

G

4A1- HR FIRE RATED WALL

1"

COMPRESSIBLE INSULATION

GWB CUT TO CONTOUR OF

THE STEEL DECK, BUT

ALLOW FOR 1" DEFLECTION

DEEP LEG DEFLECTION

TRACK FASTENED TO DECK

STUD TOP TRACK, SET INTO

DEFLECTION TRACK

SOUND BATT. INSULATION

STEEL DECK

ACOUSTICAL

SEALANT

GWB AS INDICATED -

DO NOT FASTEN TO

DEFLECTION TRACK

TOP OF WALL PERPENDICULAR TO STEEL DECK FLUTES

TOP OF WALL PARALLEL TO STEEL DECK FLUTES - SIM. TO DETAIL B/A-411. SPAN FLUTES WITH

20 GA. SHEET METAL AS NEEDED TO ANCHOR STUD WALL

ACOUSTICAL SEALANT AT

GAP

COMPRESSIBLE INSUL.

GWB CUT TO CONTOUR OF

THE STEEL DECK, BUT

ALLOW FOR 1" DEFLECTION

DEEP LEG DEFLECTION

TRACK FASTENED TO DECK

TOP OF WALL PERPENDICULAR TO STEEL DECK FLUTES

1"

3"

ALLOW FOR 1" FOR

DEFLECTION

STUD TOP TRACK, SET

INTO DEFLECTION

TRACK

STL DECK OR

STRUCTURAL

MEMBER ABOVE

DEEP LEG

DEFLECTION TRACK,

FASTENED TO

STRUCT. MEMBER

GWB AS INDICATED -

DO NOT FASTEN TO

DEFLECTION TRACK

STL STUD

1"

UNDERSIDE OF

STRUCTURE

METAL STUD BRACING,

ALTERNATE DIRECTION

@ 8'-0" O.C., MATCH WALL

STUD SIZE, TYP.

STEEL STUD FRAMING,

SIZE VARIES, SEE

PARTITION TYPES

6" STEEL STUDS @ 16" O.C.

5/8" GWB--SEE SPEC. SECTION 09 29 00

FOR TYPE OF GWB AT VARIOUS

LOCATIONS

5SCALE: NTS

BULLET-RESISTANT PARTITION

STC 45 MINIMUM

3" MINERAL FIBER BATTS AT STC RATED PARTITIONS

BULLET-RESISTANT FIBERGLASS MAT'L

OUTER STRIP OF

GWB ATTACHED TO

DEFLECTION TRACK

GWB SEAM

AS REQ'D

STEEL STUDS

THIS DETAIL APPLIES TO ALL SOUND RATED WALLS THAT EXTEND UP

TO FLOOR DECKS. DETAIL IS SIMILAR FOR BEAMS.

CUT GWB TIGHT

TO JOIST CHORDS.

SOUND CAULK GAPS

TR

AC

K D

EF

LE

C

TI

O N

STEEL DECK

FILL STUD CAVITY

AROUND JOIST W/

SOUND INSULATION

STEEL BAR JOIST

ACOUSTICAL SEALANT

SPRAY FIREPROOFING

WHERE OCCURS

US Army Corps of Engineers ® Omaha District

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

M W

B U

IL

D

IN

G

FE

W

AR

R

EN

A

FB

, W

YO

M

IN

G

G H

LN

9-

A-500

W

AL

L

TY

P E S

R

EN

O

VA

TE

W

IN

G

C O

M M

AN

D

P O

ST

0, O M

A H A

D

IS

T R

IC

T O

M

AH

A, N

EB

R

AS

KA

K.

J

AR

VI

S/ T

.W

IE

R D

A

K.

J

AR

VI

S/ T

.W

IE

R D

A

T.

W

IE

R

D A

B.

G

O R

U P

/1

6/

W

F-

-B

-0

FE

_R

EN

O

0_ C

EN

TR

AL

_V

.R

VT

W R

N -B

-7

3" = 1'-0"A-500

7 TYP. STC RATED WALL HEAD

3" = 1'-0"A-500

8 TYP. NON-RATED WALL HEAD

1" = 1'-0"A-500

9 ALT. NON-RATED WALL BRACE

0 3" 6" 9" 12"0 1' 2' 1 1/2" = 1'-0"A-500

10 JOIST PENETRATION

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G

EN

ER

AL

R

EV

IS

IO

N

S D e c

, 2

TYPE P

5-PANEL

4" +/-

REQUIRED

AS 4" +/-

4"

R

EQ

U

IR

ED

AS

2"

REQUIRED

AS 2"

1/

2"

R

EQ

U

IR

ED

AS

TYPE F

FLUSH

TYPE 1 TYPE 2

LOUVER

WHERE

INDICATED

PEEP HOLE

WHERE

INDICATED

DECORATIVE

FLUTED WOOD

CASING, MATCH

EXIST'G

BLANK-FACE

RAISED

MEDALLION

W/ BEVELED

EDGES

MATCH EXIST'G

ROOM FINISH SCHEDULE LEGEND:

ACT ACOUSTICAL CEILING TILE

AF ATHLETIC FLOOR

CONC CONCRETE WITH SEALER

CPT CARPET, TILE

CW CARPET, WALK OFF

DWP DECORATIVE WOOD PANEL

EXP EXPOSED STRUCTURE

GWB GYPSUM WALL BOARD

LVT LUXURY VINYL TILE

P PAINT

PT PORCELAIN TILE

PWC PROTECTIVE WALLCOVERING

RAF RAISED ACCESS FLOOR

RB RESILIENT BASE

WD WOOD BASE

TYPE W1 TYPE W2 TYPE W3

3'-0"

3' -0

3'-0"

3' -0

3' -4

3' -4

F.F.

4'-6"

4' -0

3'

-2

/2

FIELD VERIFY

US Army Corps of Engineers ® Omaha District

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

M W

B U

IL

D

IN

G

FE

W

AR

R

EN

A

FB

, W

YO

M

IN

G

G H

LN

9-

A-600

D O

O R

S C

H E D

U

LE

W

IN

D

O W

S C

H E D

U

LE

A N D

R O

O M

F

IN

IS

H

S C

H E D

U

LE

R

EN

O

VA

TE

W

IN

G

C O

M M

AN

D

P O

ST

0, O M

A H A

D

IS

T R

IC

T O

M

AH

A, N

EB

R

AS

KA

K.

J

AR

VI

S/ T

.W

IE

R D

A

K.

J

AR

VI

S/ T

.W

IE

R D

A

T.

W

IE

R

D A

B.

G

O R

U P

/1

6/

W

F-

-B

-0

FE

_R

EN

O

0_ C

EN

TR

AL

_V

.R

VT

W R

N -B

-7

ROOM FINISH SCHEDULE

RM. NO. ROOM NAME

FLOOR FLOOR WALL WALL CEILING CEILING

NOTESMATERIAL BASE MATERIAL FINISH

MATERIA

L HEIGHT

B00 OPEN OFFICE RAF/CPT RB GWB P ACT/DWP 8' - 0" 8, EAST WALL, CEILING

B01 ENTRAPMENT AREA CW RB GWB P ACT 8' - 0"

B02 GUARD SHACK LVT RB GWB P ACT 8' - 0"

B03 GLOBAL ASNT. ANTENNA EQUIP. RM. RAF/CPT RB GWB P ACT 8' - 0"

B04 EA CELL - - - - ACT 9' - 0"+/- MATCH EXIST'G CLG HT.

B05 CONFERENCE ROOM RAF/CPT RB GWB P ACT 8' - 0"

B05A VESTIBULE - - - P - - 1

B06 UNISEX RAF/LVT PT PT PT GWB 8' - 0" 3, 5

B07 EOC CHIEF RAF/CPT WD GWB P ACT 8' - 0"

B08 STORAGE RAF/CPT WD GWB P ACT 8' - 0"

B09 COMM LVT RB - P EXP -

B10 KITCHENETTE LVT RB GWB P ACT - 9

B11 UPS - - - P - - 1B, 2

B12 STORAGE LVT RB GWB P ACT 8' - 0"

B13 MAIN COMM CONC RB GWB/PLYWD P EXP - 10

B15 STORAGE LVT RB GWB P ACT 7' - 9"

B16 JANITOR LVT RB GWB P GWB 7' - 9" 4

B17 MEN PT PT PT PT GWB 7' - 9" 3, 5

B18 NCOIC CP OPS CPT WD GWB P ACT 7' - 9"

B19 WOMEN PT PT PT PT GWB 7' - 9" 3, 5

B20 FITNESS AF RB GWB P ACT 8' - 3"

B21 TRAINING CPT WD GWB P ACT 7' - 9"

B21A OFFICE CPT WD GWB P ACT 7' - 9"

B22 CP CHIEF OFFICE CPT WD GWB P ACT 7' - 9"

B23 SUPERINTENDENT & C2 OPS OFFICE CPT WD GWB P ACT 7' - 9"

B24 CRISIS ACTION TEAM RAF/CPT WD GWB P/DWP ACT/DWP 8' - 4" 8, SOUTH WALL, CEILING

B25 CMDR OFFICE RAF/CPT WD GWB P ACT 8' - 4"

COR-1 CORRIDOR LVT RB GWB P/PWC ACT 7' - 9" 6

COR-2 CORRIDOR LVT RB GWB P ACT 8'-6"/7'-9" 7

MECH-1 MECHANICAL - - - P - - 1

MECH-2 MECHANICAL - - - P - - 1A

DOOR SCHEDULE

DOOR LOCATION

DOOR

FIRE

RATING

STC

RATING

FRAME DETAILS

HARDWARE NOTESTYPE

SIZE

MAT'L FINISH TYPE MAT'L FINISH HEAD JAMB SILLWIDTH HEIGHT THICKNESS

B01 ENTRAPMENT AREA F 3' - 0" 7' - 0" 1 3/4" STEEL PAINT - 33 2 STEEL PAINT 1/A-700 2/A-700 3/A-700 1 PEEPHOLE IN DOOR B02 GUARD SHACK P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 2 REUSE EXIST'G DOOR CASING B03 GLOBAL ASNT ANT P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 2 STEEL STAIN 1/A-700 2/A-700 3/A-700 8

B04A EA CELL P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 33 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 12 REUSE EXIST'G DOOR CASING B04B EA CELL P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 33 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 12 B05 CONFERENCE ROOM P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 2 STEEL STAIN 1/A-700 2/A-700 3/A-700 6 B06 UNISEX F 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 7 REUSE EXIST'G DOOR CASING B07 EOC CHIEF P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 6 REUSE EXIST'G DOOR CASING B08 STORAGE P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 9 REUSE EXIST'G DOOR CASING

B09 COMM EXIST'G 3' - 0" 7' - 0" 1 3/4" WOOD - - EXIST'G WOOD - 4 NEW HARDWARE

B11 EXIST'G 3' - 0" 7' - 0" 1 3/4" -

B12 STORAGE EXIST'G 3' - 0" 7' - 0" 1 3/4" WOOD - - EXIST'G WOOD - 4 NEW HARDWARE B13 MAIN COMM F 3' - 0" 7' - 0" 1 3/4" STEEL PAINT - 2 STEEL PAINT 1/A-700 2/A-700 3/A-700 8 B15 STORAGE P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 9 B16 JANITOR P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 9 B17 MEN P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 10 B18 NCOIC CP OPS P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 6 B19 WOMEN P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 10 B20 FITNESS P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 6 LOUVER IN DOOR B21 TRAINING P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 33 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 6 B22 CP CHIEF OFFICE P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 6

B23 SUPERINTENDENT & C2 OPS

OFFICE

P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 1 WOOD STAIN 4/A-700 5/A-700 3/A-700 6

B24 CRISIS ACTION TEAM P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 33 2 STEEL PAINT 1/A-700 2/A-700 3/A-700 3 B26 COMMANDER OFFICE P 3' - 0" 7' - 0" 1 3/4" WOOD STAIN - 2 STEEL STAIN 1/A-700 2/A-700 3/A-700 6

MECH-1 MECHANICAL F 6' - 0" 7' - 0" 1 3/4" STEEL PAINT 3/4 HR 2 STEEL STAIN 1/A-700 2/A-700 3/A-700 11 ST-2A STAIRS F 3' - 0" 7' - 0" 1 3/4" STEEL PAINT 3/4 HR 33 2 STEEL PAINT 1/A-700 2/A-700 3/A-700 1 PEEPHOLE IN DOOR ST-2B STAIRS F 3' - 0" 7' - 0" 1 3/4" WOOD STAIN 3/4 HR 33 2 STEEL PAINT 1/A-700 2/A-700 3/A-700 5 ST-3 STAIRS F 3' - 0" 7' - 0" 1 3/4" WOOD STAIN 3/4 HR 33 2 STEEL PAINT 1/A-700 2/A-700 3/A-700 5

ROOM FINISH NOTES:

1. NO NEW FINISHES IN THIS ROOM. REPAINT

EXISTING WALLS AND CEILING.

1A. NO NEW FINISHES IN THIS ROOM. REPAINT

EXISTING WALLS AND CEILING WHERE EXISTING

EQUIPMENT WAS REMOVED AND PRIOR TO NEW

EQUIPMENT INSTALLATION.

1B. NO NEW FINISHES IN THIS ROOM. REPAINT

EXISTING WALLS.

2. REPLACE CEILING TILES AND GRID TO MATCH

EXISTING IF DAMAGED WHEN INSTALLING NEW

DUCTWORK, SPRINKLER PIPING, ETC.

3. INSTALL PORCELAIN TILE FULL HEIGHT,

INCLUDING IN SHOWER AS NEEDED.

4. PROVIDE FRP ON WET WALLS.

5. PROVIDE QUARTZ MATERIAL ON

COUNTERTOPS.

6. NORTH & SOUTH WALL MAIN CORRIDOR,

WOOD CHAIR RAIL AT 42" WITH PAINT ABOVE AND

PROTECTIVE WALL COVERING BELOW.

7. FLOOR ELEV. CHANGES RESULTING IN

DIFFERING CEILING HT.

8. DECORATIVE WOOD PANEL, FULL HEIGHT. SEE

INTERIOR ELEVATION DRAWINGS.

9. EXISTING ACT CEILING. REMOVE AND

REINSTALL NEW DUCT AND DIFFUSER.

10. 3/4" FIRE-RATED PLYWOOD OVER GWB ON

WEST WALL TO 8'-0" AFF. PAINT ONLY GWB.

WINDOW SCHEDULE

MARK TYPE WIDTH HEIGHT MATERIAL FINISH

GLAZING

TYPE NOTES

W1 FIXED 3' - 0" 3' - 0" ST. STEEL ST. STEEL GL-2 BULLET-RESISTANT TRANSACTION WINDOW W/ SHELF

W2 FIXED 3' - 0" 3' - 0" HM PNT GL-1

W3 FIXED 4' - 6" 4' - 0" ST. STEEL PNT GL-1

WINDOW SCHEDULE NOTES:

1. SEE SHEET A-700 FOR WINDOW DETAILS.

GLAZING TYPES:

GL-1 SINGLE PANE CLEAR SAFETY GLASS

GL-2 BULLET-RESISTANT, ONE-WAY VISION

0 2' 4' 6'

4' 8'0 2'

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G

EN

ER

AL

R

EV

IS

IO

N

S D e c

, 2

FE98A-100
Sheets
A-100 - NEW BASEMENT FLOOR PLAN - COMPOSITE
A-500 - WALL TYPES
A-600 - DOOR SCHEDULE , WINDOW SCHEDULE AND ROOM FINISH SCHEDULE
FE98A-101
Sheets
A-101 - NEW BASEMENT FLOOR PLAN - AREA 'A'
A-102 - NEW BASEMENT FLOOR PLAN - AREA 'B'
A-103 - NEW BASEMENT FLOOR PLAN - AREA 'C'
FE98A-102
Sheets
A-101 - NEW BASEMENT FLOOR PLAN - AREA 'A'
A-102 - NEW BASEMENT FLOOR PLAN - AREA 'B'
A-103 - NEW BASEMENT FLOOR PLAN - AREA 'C'
FE98A-103
Sheets
A-101 - NEW BASEMENT FLOOR PLAN - AREA 'A'
A-102 - NEW BASEMENT FLOOR PLAN - AREA 'B'
A-103 - NEW BASEMENT FLOOR PLAN - AREA 'C'
FE98A-130
Sheets
A-130 - REFLECTED CEILING PLAN
FE98A-500
Sheets
A-100 - NEW BASEMENT FLOOR PLAN - COMPOSITE
A-500 - WALL TYPES
A-600 - DOOR SCHEDULE , WINDOW SCHEDULE AND ROOM FINISH SCHEDULE
FE98A-600
Sheets
A-100 - NEW BASEMENT FLOOR PLAN - COMPOSITE
A-500 - WALL TYPES
A-600 - DOOR SCHEDULE , WINDOW SCHEDULE AND ROOM FINISH SCHEDULE

File details come from the government source that posted it. Updated .