Am_0008.pdf
PDF 45 KB Posted
- Attached to
- Maintenance Hangar -Fort Carson, CO Federal contract opportunity
- Solicitation number
- W9128F-16-R-0067
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F-16-R-0067_Amend_0009.pdf | ||
| Am_0007-Drawings.pdf | ||
| Am_0007.pdf | ||
| Am_0006-Drawings.pdf | ||
| Am_0006.pdf | ||
| Am_0005.pdf | ||
| Am_0005-Drawings.pdf | ||
| Am_0004.pdf | ||
| Am_0004-Drawings.pdf | ||
| Am_0003-Drawings.pdf | ||
| FCX7_CADD_Files.zip | ZIP file | |
| Am_0003.pdf | ||
| Am_0002-Drawings.pdf | ||
| Am_0002.pdf | ||
| FY15_Attack_Pre-award_Site_Visit_Sign-In_Sheet_(07JUN16).pdf | ||
| Am_0001-Vol3_Drawings.pdf | ||
| Am_0001.pdf | ||
| Am_0001-Vol1_Drawings.pdf | ||
| FCX7_Advertisement_Vol._1.PDF | ||
| FCX7_Advertisement_Vol._3.pdf | ||
| FCX7_Advertisement_Vol._2.pdf | ||
| FCX7_Advertisement_Vol._1.PDF.7z | 7Z file | |
| Specs_W9128F-16-R-0067.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Amendment No. 0008 22-JUL-2016
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-16-R-0067
23-MAY-2016
4th ID CAB, ATTK BN MAINTENANCE HANGAR
PN 77305, FORT CARSON, COLORADO
See attached documentation for content of the amendment revisions
Date for receipt of Proposals is 28 JUL 2016 at 1400 hours
Government Point of Contact: Denise Cramer (402) 995-2057
28-JUL-2016
Am #0008 - 2 (Continuation SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F 16 R 0067 :all amendments may cause rejec- :
:tion of the offer. See FAR : Date of Issue: 23 MAY 2016 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:
28 JUL 2016
Amendment No. 0008
22 JUL 2016
SUBJECT: Amendment No. 0008 to Request for Proposal Solicitation Package for Construction of 4th ID CAB, ATTK BN MAINTENANCE HANGAR, PN 77305, FORT CARSON, COLORADO
Solicitation No. W9128F 16 R 0067
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 22 00 00, paragraph 2.4, in the second to last sentence, change “127scfm” to “127 acfm”.
(2) Section 22 15 14.00, paragraph 2.4, delete the following sentence, “Air dryer shall maintain a 50 degree F dew point at 120 degree F air inlet temperature from air compressor.”
(3) Section 22 15 14.00, add the following paragraph:
“2.8 Compressed Air Hose Reel and Hose Hose reel shall be constructed of steel and supported by a heavy duty steel base. The base on reel shall be have manufacturers standard baked on powder coating. The reel shall accommodate and be provided with 100 feet of 3/8-inch I.D. reinforced rubber compressed air hose with brass end fittings. Compressed air hose shall be rated for an operating pressure of 250 psig at 70 degrees F. The reel shall be provided with a spring operated return mechanism and shall be supported by permanently sealed ball bearings.”
b. Drawings (Not Reissued). The following drawings are revised as indicated below with latest revision date of 22 JUL 2016. These drawings are not reissued with this amendment.
(1) Sheet M-001, add to GENERAL NOTES:
“S. EXPANSION ANCHORS FOR OVERHEAD HANGING ITEMS SHALL BE TESTED
AND PREQUALIFIED IN ACCORDANCE WITH ACI 355.2 FOR CRACKED CONCRETE
CONDITIONS.
Am #0008 - 3 (Continuation SF 30)
T. ALL DUCTLESS SPLIT SYSTEM EVAPORATORS AND AIR HANDLING UNIT
COOLING COILS SHALL BE PROVIDED WITH A CONDENSATE DRAIN LINE. THE
DRAIN LINES SHALL BE ROUTED AS SHOWN ON THE MECHANICAL OR PLUMBING
PLANS. WHERE NOT SHOWN OR ADDRESSED BY NOTE, THE DRAIN LINES SHALL
BE ROUTED TO THE NEAREST MECHANICAL ROOM FLOOR DRAIN.
U. WHERE FLOOR DRAINS ARE SHOWN TO BE INSTALLED IN NEAR PROXIMITY
TO FLOOR MOUNTED AIR HANDLING UNITS, THE FLOOR DRAIN SHALL BE
LOCATED APPROXIMATELY 12 INCHES FROM THE AIR HANDLING UNIT
HOUSEKEEPING PAD.”
(2) Sheet P-001, add to GENERAL NOTES:
“V. EXPANSION ANCHORS FOR OVERHEAD HANGING ITEMS SHALL BE TESTED
AND PREQUALIFIED IN ACCORDANCE WITH ACI 355.2 FOR CRACKED CONCRETE
CONDITIONS.
W. ALL DUCTLESS SPLIT SYSTEM EVAPORATORS AND AIR HANDLING UNIT
COOLING COILS SHALL BE PROVIDED WITH A CONDENSATE DRAIN LINE. THE
DRAIN LINES SHALL BE ROUTED AS SHOWN ON THE MECHANICAL OR PLUMBING
PLANS. WHERE NOT SHOWN OR ADDRESSED BY NOTE, THE DRAIN LINES SHALL
BE ROUTED TO THE NEAREST MECHANICAL ROOM FLOOR DRAIN.
X. WHERE FLOOR DRAINS ARE SHOWN TO BE INSTALLED IN NEAR PROXIMITY
TO FLOOR MOUNTED AIR HANDLING UNITS, THE FLOOR DRAIN SHALL BE
LOCATED APPROXIMATELY 12 INCHES FROM THE AIR HANDLING UNIT
HOUSEKEEPING PAD.”
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.
a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 10 00-1 of Standard Form 1442.
3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 28 JUL 2016.
Attachments:
None.
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
22 JUL 2016
jlb/2099
| StandardForm30 |
| Am_0008_Narrative |
File details come from the government source that posted it. Updated .