Q A.pdf

PDF 106 KB Posted

Attached to
Station Service Upgrade and Transformer Replacement Federal contract opportunity
Solicitation number
W9128F-16-Q-0130
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Question and answers from site visit

View the file

Other files for this federal contract opportunity

Other files attached to Station Service Upgrade and Transformer Replacement, newest first.
File Type Posted
SF30_AMD002.pdf PDF
PPQ.pdf PDF
Gavins_Reference_Dwgs_Amendment.pdf PDF
GP_Service_Switchgear_and_Transformer_Replacement_BCOE_photo_attachments.pdf PDF
AK-1-25_cubicle_(3).JPG JPG image
AK-1-25_cubicle_(3).JPG JPG image
IMG_1856.jpg JPG image
IMG_1855.jpg JPG image
IMG_1863.jpg JPG image
AK-1-25_cubicle_(1).JPG JPG image
AK-1-25_cubicle_(2).JPG JPG image
IMG_1862.jpg JPG image
IMG_1861.jpg JPG image
AK-1-50_Nameplate.JPG JPG image
16-Q-0130.pdf PDF
SS_Upgrade_specs.pdf PDF
W9128F-16-Q-0130.pdf PDF
Gavins_Point_Station_Service_Upgrades_Contract_Drawings.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gavins Point 480 V Switchgear and Breaker Install

Solicitation Number W9128F-16-Q-0130

Contractor Questions and Responses

1. Q: Is it a supply and install of S.S. XFMR?

A: Sections 01 11 00.00 26 specifies the supply and install as does 26 12 16.00 26

2. Q: Why are we requesting a 73 KA bus bracing?

A: Based on fault analysis

3. Q: What are the individual S.S. breaker trip settings?

A: Shown on drawings

4. Q: What is the A floor access?

A: Not sure which floor is A floor, but both contract drawings and as built reference drawings indicate access both by hatch and stairways

5. Q: What are the cable lengths on optional line items?

A: Lengths indicated in Section 26 23 10.10 26 paragraph 3.5

6. Q: What is the option on seismic testing?

A: See Section 13 48 00.00 26 paragraph 1.4.4 for general requirements

7. Q: Is there a spec on cable testing on what is GO / NO GO?

A: It is an option to be exercised at determined by Government based on test values

8. Q: What are the cable lengths?

A: Not part of scope except for optional items. Cable length for Diesel generator HRG is shown on note on drawings

9. Q: Can we get relevant photos?

A: Photos have been added to the solicitation on the FBO site

10. Q: Can we get an extension on bid?

A: The response date is 27 October 2016

11. Q: Per Section 10.1 Experience -Submission Requirements, “The offeror shall submit up to three

(3) examples of substation transformer removal and installation, low voltage power circuit breaker retro fill and low voltage switchgear bus re-bracing projects which best illustrate the experience of the contractor on projects of similar function and scope.” However in section 11.1 Past Performance - Submission Requirements, ” The Offeror shall submit at a minimum description of five (5) supply and installation contracts for substation transformer removal and installation, low voltage power circuit breaker retro fill and low voltage switchgear bus re-bracing projects performed as a prime contractor in recent years.”

Since we are submitting three (3) project per section 10.1, shouldn’t the same projects be provided for section 11.1?

If this is the case are three (3) Past Performance Information (i.e. PPQ’s) acceptable for this section?

A: Experience is stating that you’ve done this work, past performance is relevancy to the proposed work and how well you’ve done it. They are two different things, however, the 3 projects you submit for Experience can also be used for Past Performance.

12. Q: Is the Corps able to provide a single line that illustrates the 13.8kV switchgear systems so that we may quote the optional bus bracing studies:

1.3.7 Item 0008

1.3.8 Item 0009

1.3.9 Item 0010

A: Relevant reference drawing has been uploaded to FBO site.