GP_Service_Switchgear_and_Transformer_Replacement_BCOE_photo_attachments.pdf

PDF 10 MB Posted

Attached to
Station Service Upgrade and Transformer Replacement Federal contract opportunity
Solicitation number
W9128F-16-Q-0130
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Additional pictures

View the file

Other files for this federal contract opportunity

Other files attached to Station Service Upgrade and Transformer Replacement, newest first.
File Type Posted
SF30_AMD002.pdf PDF
Gavins_Reference_Dwgs_Amendment.pdf PDF
PPQ.pdf PDF
Q A.pdf PDF
AK-1-25_cubicle_(3).JPG JPG image
AK-1-25_cubicle_(3).JPG JPG image
IMG_1856.jpg JPG image
IMG_1855.jpg JPG image
IMG_1863.jpg JPG image
AK-1-25_cubicle_(1).JPG JPG image
AK-1-25_cubicle_(2).JPG JPG image
IMG_1862.jpg JPG image
IMG_1861.jpg JPG image
AK-1-50_Nameplate.JPG JPG image
16-Q-0130.pdf PDF
SS_Upgrade_specs.pdf PDF
W9128F-16-Q-0130.pdf PDF
Gavins_Point_Station_Service_Upgrades_Contract_Drawings.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX TO PHOTOGRAPHS

1. El. 1179.5 Looking up through hatch

2. EL. 1179.5 - Looking toward doorway way to switchgear gallery. Note HVAC height limitations will limit ability to move transformer to switchgear gallery fully assembled

3. EL. 1179.5 - Looking through doorway to switchgear gallery toward erection bay. Note height limitations for moving transformer fully assembled into position

4. El. 1179.5 - Switchgear Gallery looking toward erection bay. Cable trays containing feeder cables on right

5. EL. 1179.5 - Control cable trays behind 480 V switchgear

6. El. 1161 – Typical conduits underneath 480 VAC switchgear used for routing the feeder cables to the cable trays located on upstream wall of EL. 1179.5

7. EL. 1179.5 – Typical conduit penetrations into the bottom of the 480 volt switchgear for feeder cables to exit to floor below.

8. Nameplate existing Main and Tie breakers

9. Nameplate existing Feeder breakers

10. El. 1179.5 - Existing transformers and 480 V switchgear line-up

11. El. 1179.5 - 13.8 KV transition section. Transformer is to the left.

12. El 1179.5 - Typical 480 V bus transition from transformer to 480 volt switchgear. Rear view of the 480 volt switchgear. Transformer to left

Note: These photographs are being provided for information only. The Contractor is responsible for verifying all equipment, routing and limitations in the field.

El. 1179.5 Looking up through hatch

EL. 1179.5 - Looking toward doorway way to switchgear gallery. Note HVAC height limitations will limit ability to move transformer to switchgear gallery fully assembled

EL. 1179.5 - Looking through doorway to switchgear gallery toward erection bay. Note height limitations for moving transformer fully assembled into position

El. 1179.5 - Switchgear Gallery looking toward erection bay. Cable trays containing feeder cables on right

EL. 1179.5 - Control cable trays behind 480 V switchgear

El. 1161 – Typical conduits underneath 480 VAC switchgear used for routing the feeder cables to the cable trays located on upstream wall of EL. 1179.5

EL. 1179.5 – Typical conduit penetrations into the bottom of the 480 volt switchgear for feeder cables to exit to floor below.

Nameplate existing Main and Tie breakers

Nameplate existing Feeder breakers

El. 1179.5 - Existing transformers and 480 V switchgear line-up

El. 1179.5 - 13.8 KV transition section. Transformer is to the left.

El 1179.5 - Typical 480 V bus transition from transformer to 480 volt switchgear. Rear view of the 480 volt switchgear. Transformer to left