Repair Building 503A, Fort Shafter, Oahu, Hawaii
Solicitation number
W9128A-20-R-0017
Issued by

About this file

This solicitation announcement seeks proposals for a repair project at Building 503A located at Fort Shafter, Hawaii. The project scope includes renovations to convert the 7-story building into a 100-person company operations facility on the first floor and 84-person barracks on floors 2 through 7. Renovations will reconfigure utility spaces, repair barracks modules, and replace interior finishes. The total project value is estimated between $25-50 million.

The solicitation will use a lowest price technically acceptable source selection process to award a firm fixed-price construction contract. The evaluation factors are experience, past performance, technical approach, and price. The performance period is 780 calendar days. Offerors must register in the System for Award Management and place subcontracts with small businesses to the maximum extent practicable. Proposals are due no later than the date specified in an amendment to this solicitation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AM-0003 27 Aug 2020

6. ISSUED BY CODE W9128A 7. ADMINISTERED BY (If other than Item 6) CODE

CEPOH – CONTRACTING DIVISION HAWAII

USACE, HONOLULU DISTRICT See Item 6

BLDG 252 (CECT-POH)

FT SHAFTER, HI 96858-5440

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

W9128A20R0017 X

9B. DATED (SEE ITEM 11)

X 07-Aug-2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Repair Building 503A, Fort Shafter, Oahu, Hawaii

See Continuation Page

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W9128A20R0017

Am-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE Page 2 of 2

1. CHANGES TO SPECIFICATIONS. Attached hereto are the revised pages / paragraphs to the solicitation.

Revised pages replace like-numbered pages. The revision mark “(Am-0003)” is shown on each revised page.

A. REVISED SECTIONS. The following are sections were revised and changes are in bold or strikethroughed and blue colored font.

Section 00 10 00, Payments – item d

Section 00 22 16, 4.1.1(c), 4.1.2(d), 6.1.1(h), 7.1.1, 7.1.7, 7.1.10, Attachment A

B. ADDITIONS TO SECTION: The following sections were added to a section:

Section 00 60 00, Appendix B, Requests for Information #1 to 32.

C. ADDITIONS TO SPECIFICATIONS: The following specifictions were revised. Changes are in bold.

Section 27 10 00, paragraph 2.3.1.1

Replace the following section in its entirety:

Section 14 21 23

D. REVISED DRAWINGS: The following drawings were revised:

Sheet Date Mark

G-002 25 Aug 2020 3

G-003 25 Aug 2020 3

SD103 25 Aug 2020 3

SD104 25 Aug 2020 3

S-103 25 Aug 2020 3

S-104 25 Aug 2020 3

AD103 25 Aug 2020 3

AD104 25 Aug 2020 3

A-422 25 Aug 2020 3

A-423 25 Aug 2020 3

A-506 25 Aug 2020 3

A-601 25 Aug 2020 3

A-604 25 Aug 2020 3

AF603 25 Aug 2020 3

T-602 25 Aug 2020 3

2. The proposal due date remains unchanged. See SF 1442, Block 13.

Section 00 10 00

(Am-0003)

PAYMENT(S)

Compensation for all work to be performed under this contract will be made under the payment items(s) listed herein. The principal features of the work to be included under the payment item(s) are noted. Work required by the drawings and specifications and not particularly mentioned shall be included in and be paid for under the contract price for the item to which the work pertains. Price(s) and payment(s) for the item(s) shall cover all work, complete and finished in accordance with the specifications, schedules, and drawings, and shall be full compensation for all work in connection therewith, including quality control and cost of performance-and payment-bond premiums as specified in the CONTRACT CLAUSES. Price(s) and payment(s) shall constitute full and final compensation for furnishing all materials, equipment, management, supervision, labor, transportation, fuel, power, water, and all incidental items necessary to complete the work, except as otherwise specified to be furnished by the Government. For the purpose of

CONTRACT CLAUSE entitled “PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS”, the term

“designated billing office” and “designated payment office” are as follows:

a. Billing Office

U.S. Army Corps of Engineers, Honolulu District

Fort Shafter Area Office, Bldg 230

Fort Shafter, HI 96858-5440

b. Payment Office

USACE Finance Center

Attn: CEFC-FP

5722 Integrity Drive

Millington, TN 38054-5005

Item numbers mentioned herein after correspond to the item numbers in the PROPOSAL

SCHEDULE.

a. CLIN 0001, Building Repair will be paid for at the contract price, complete and ready for use, including abatement, demolition, blast windows, arms vaults, structural, architectural, mechanical work, electrical work, fire alarm systems, communication, testing, cleanup, and all incidental items necessary to complete the work.

b. CLIN 0002, Concrete Spall Repair, will be paid for at the contract price, complete and ready for use, including removal work, concrete patching, cleanup, and all incidental items necessary to complete the work. Any quantity in excess of the contract amount will be paid at the unit price. Any quantity less than the contract amount will be credited to the Government at the unit price.

c. CLIN 0003, Concrete Crack Repair with Epoxy Injection, will be paid for at the contract price, complete in place and ready for use, including installation of epoxy resin, cleanup, and all incidental items necessary to complete the work. Any quantity in excess of the contract amount will be paid at the unit price. Any quantity less than the contract amount will be credited to the Government at the unit price.

d. CLIN 0004, Contractor Manpower Reporting. The contractor shall report ALL contractor labor hours

(including subcontractor labor hours) required for performance of services provided under this contract for

“FY20 Repair Building 503A, Ft Shafter, HI” via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://beta.SAM.gov.

https://SAM.gov. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of https://sam.gov/

Section 00 10 00

(Am-0003) contract/task order performance. Contractors may direct questions to the help desk at help desk at:

https://beta.SAM.gov. https://SAM.gov to review user manuals and gain an understanding about the data fields that will be included in the reporting structure that is hosted at https://beta.SAM.gov.

https://SAM.gov. If the contractor does not separately price this requirement, they shall enter zero ($0).

e. CLIN 0005, Option 1, Rooftop Equipment Demolition, will be paid for at the contract price, complete in place and ready for use, including cleanup, and all incidental items necessary to complete the work.

--End of Section--

Section 00 22 16 – Page 6

Any pages that exceed this page limitation will not be considered.

c. Narrative Description Criteria

In addition to Attachment A, the Offeror shall provide a narrative description of each contract included in its proposal within the page limitation per paragraph 3.4.2. Each narrative shall contain a clear explanation of how the contract is similar in size, scope, and complexity to that outlined in the solicitation. At a minimum, each Offeror shall clearly demonstrate how the Offeror’s experience meets the following:

Renovation or new construction of multi-story barracks type and/or multi-unit housing type projects.

d. Joint Ventures

If the Offeror is a Joint Venture (JV) and the JV does not have experience working as a JV, each of the parties in the JV may submit experience on behalf of the Offeror. All references herein to “the Offeror” include all proposed joint venture parties. Submitted contracts by parties in a joint-venture or from the joint-venture itself will be considered and evaluated if the party or the joint-venture itself was the prime contractor. Information provided as to potential sub-contractors (not included in the joint venture) will not be considered or evaluated.

The JV shall submit a minimum of two (2) and no more than five (5) relevant contracts. The submitted contracts could have been performed by either of the JV parties.

4.1.2 Relevant Contracts

In order to be considered relevant, a contract (including a task order issued under an IDIQ-type contract) must be similar in size, scope, and complexity to the work required by the solicitation and meet the following criteria:

a. Each submitted contract was substantially complete within six (6) ten (10) years before the date this solicitation was issued. “Substantially complete” means a contract administrator or equivalent determined that the terms of contract were fulfilled to the extent that the constructed product could be occupied or used for its intended purposes. Evidence provided by the owner/contracting agency or CPARS documentation must be included in the proposal to demonstrate the date the contract was substantially complete.

Documentation in regard to substantial completion does not count against the page limitations in paragraph

3.4.2.

b. For each submitted contract, the Offeror (or the party in the JV, in the case of an Offeror JV, per paragraph

4.1.1.d.) was the prime contractor.

c. For each submitted contract, the final contract amount (after any modifications) was $25,000,000 or greater.

d. A minimum of one of the otherwise relevant contract (new construction or renovation) was performed at a remote location (Hawaii or site similar to Hawaii). Offeror must describe how a project that was performed at a location other than Hawaii was similar to Hawaii.

e. The Offeror must submit at least two (2) and no more than five (5) relevant contracts. The Offeror must submit at least one renovation contract that meets paragraph 4.1.2 items a through c. The remaining contracts submitted may be either new construction or renovation, but must meet paragraph 4.1.2 items a through c.

Section 00 22 16 – Page 10

b. Describe how it will manage the major elements of work and sequencing, including but not limited to demolition, grading/site work, site utilities, paving, concrete, roofing, painting, carpentry, casework, plumbing, HVAC, electrical distribution, lighting, telecom, fire protection, and elevator.

c. Describe how it will mobilize to prepare for and execute this project.

d. Describe the authorities and delegations of authorities.

e. Explain how it will address logistical, personnel, material sourcing, and transportation challenges of executing this project.

f. Proposed approach to successful quality control.

g. How it will meet the solicitation/contract QC System Manager qualifications.

h. How it will meet the solicitation/contract QC Representative qualifications.

The maximum number of pages for this factor shall not exceed eight (8) pages. Any pages that exceed this limitation will not be considered.

6.1.2 Evaluation Criteria

The Government will evaluate to determine whether if the Offeror’s proposal complies with the submission requirements in paragraph 6.1.1. The Government will then assign an adjectival rating in accordance with paragraph 6.1.3.

6.1.3 The Government will use the following as the basis of evaluation:

Factor 3, Technical Approach

Adjectival Rating Description

Acceptable The proposal has demonstrated an adequate approach and understanding of the requirements.

Unacceptable The proposal has not demonstrated an adequate approach and understanding of the requirements.

7.0 VOLUME 2: PRICE PROPOSAL

7.1 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME 2)

7.1.1 Price Proposal. Submit the Price Proposal in read-only PDF format. The only documents that can be scanned are the items identified in paragraphs 7.1.2 and 7.1.3. SF1442, acknowledgement of amendments, and a letter from the surety for bonding capability. Sections of the proposal shall be bookmarked (linked to the index) in logical order.

a. Offerors shall submit the price proposal via DoD SAFE (refer to Section 00 73 00, Appendix A). The

PDF file for the price proposal shall be titled, “W9128A20R0017_COMPANY NAME_PRICE

PROPOSAL”.

b. Offerors shall submit one (1) hard copy of the original price proposal within seven (7) calendar days after the proposal due date.

7.1.2 Size Restrictions and Page Limits. The following are established for each factor:

Factor 4 – Section 00 10 00 Proposal Schedule: No page limit

Section 00 22 16 – Page 11

Proposal material shall be submitted in PDF format. Do not use a font size smaller than 10 pitch, an unusual font style such as script, or condensed print for any submission. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches.

7.1.3 Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents, as indicated in the following chart below.

TAB CONTENTS OF THE PRICE PROPOSAL – Volume 2

1 Coversheet

2 The SF1442 and Acknowledgement of Amendments

3 Section 00 10 00, Proposal Schedule

4 Bonding Capability

Copy of Representations and Certifications completed electronically via the System for

Award Management (SAM.gov).

6 JV Agreement or Articles of Organization for LLC, if applicable.

7 Subcontracting Plan (only required for Large Business Concerns)

HUBZONE CONTRACTORS. This RFP includes Contract Clause 52.219-4 regarding a 10% evaluation preference for HUBZone small business concerns. HUBZone small business concerns electing to waive their evaluation preference shall submit a copy of clause 52.219-4 indicating such. HUBZONE small business concerns not waiving the evaluation preference shall submit a copy of their SBA certification letter under this tab.

Supplemental Price Breakdown. If deemed necessary to evaluate elements of the price proposal, the

Government will request a breakdown of elements of the price in a sealed envelope marked “Price Breakdown

Information”, in Excel format. The Government will provide details on where and how to send the breakdown. This information will not be needed sooner than three (3) working days after proposal submission due date. This information may be required for the initial proposal, and if requested, for any revised proposals.

This information is not an opportunity for an Offeror to revise its non-price or price proposal.

7.1.4 Volume 2, TAB 1: Proposal Cover Sheet. The proposal cover sheet is required by FAR 52.215-1(2)(c)(i)-9v) and must be submitted by all Offerors. This provision, titled “Instruction to Offerors – Competitive

Acquisition” and the format for the proposal coversheet as indicated below:

PROPOSAL COVER SHEET

1. Solicitation Number

2. The name, address, and telephone and facsimile numbers of the Offeror (and electronic address if available).

4. 3. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation.

5. 4. Name, title, and signature of the person who is authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

Section 00 22 16 – Page 12

7.1.5 Volume 2, TAB 2: The SF 1442, Solicitation, Offer, and Award is to be completed by all Offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR

4.102. All amendments must be acknowledged by all Offerors in accordance with the instructions on the

Standard Form 30, Amendment of Solicitation.

7.1.6 Volume 2, TAB 3: The Proposal Schedule is to be completed in its entirety by all Offerors. See Section 00 10

00 with attached notes, for further instructions.

7.1.7 Volume 2, TAB 4: Offerors shall provide a scanned copy of an original letter from the Offeror’s surety(ies) which indicates the Offeror has bonding capability for an amount that equals or exceeds the Offeror’s price proposal. Failure to provide bonding capability equal to or exceeding the Offeror’s proposed price will make the Offeror ineligible for award.

7.1.8 Volume 2, TAB 5: All Offerors must have electronically completed the annual Representations and

Certifications on the System for Award Management (SAM) Website at www.sam.gov or respond with the completed Representations / Certifications found in the solicitation. The Offerors are responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that it is kept current, accurate and complete. Additionally, the Offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in the solicitation.

If the Offeror is a Joint Venture (JV) and it does not have the SAM Representations and Certifications as a JV, all participants of the JV must separately complete the SAM Representations and Certification.

7.1.9 Volume 2, TAB 6: Joint Venture Agreement (if applicable): If the Offeror is a Joint Venture (JV), include a copy of the finalized / approved JV Agreement. JV Agreements must clearly indicate the percentages of the

JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorities between the JV parties. If the Offeror is a Limited Liability Company, include a copy of the

Articles of Organization / Incorporation.

In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

Note: If the Offeror is not required to submit any information under a listed Tab (such as a JV Agreement) in accordance with the instructions below, the tab can be omitted.

7.1.10 Volume 2, TAB 7: Subcontracting Plan (only required from Large Business Concerns)

If the Offeror is a large business concern, the Offeror shall submit a subcontracting plan in accordance with

FAR 52.219-9 (See Section 00 22 16, Appendix A for a sample) NO LATER THAN five (5) calendar days after a notification request from the Contracting Officer or the Contract Specialist. The Offeror may e-mail its small business subcontracting plan to Dayna Matsumura (dayna.n.matsumura@usace.army.mil) and Kent

Tamai (kent.a.tamai@usace.army.mil).

The plan shall include a description of the types of services the firm proposes to subcontract with small business (SB), small disadvantaged business (SDB) (to include historically black colleges and universities/minority institutions (HBCU/MI)), woman-owned small business (WOSB), HUBZone business, veteran-owned small business (VOSB) and service-disabled veteran-owned small business (SDVOSB), along with the proposed percentages of their participation, to demonstrate a plan to meet the subcontracting goals that will apply to these contracts. The Offeror shall provide specific information on proposed subcontracted effort for this project.

The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:

mailto:dayna.n.matsumura@usace.army.mil mailto:kent.a.tamai@usace.army.mil

Section 00 22 16 – Attachment A – Page 1

Attachment A

EXPERIENCE INFORMATION

(To be completed by Contractor)

If the Offeror is in a Joint Venture, identify which contractor in the Joint Venture Completed the contract.

1. Contractor: Name:

Address:

DUNS:

CAGE Code:

2. Contract /Task Order(TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Award Amount:

4. Contract/TO /PO Status: Period of Performance:

Original Completion Date: Percent Complete: ______%

Actual Completion Date (with time extensions):

Award Date:

Final Contract Price: Percent of work performed by Prime:

Contract Title and Location (city, state):

Type of Contract (Design-Build, Design-Bid-Build, Work Plan Construct, Firm Fixed-Price, Cost Plus, etc.):

Contract Description (narrative description) -- to include the role of the contractor on the contract and specific responsibilities of the contractor in performance of the effort:

Type / scope of work performed by the Offeror:

Type / scope of work performed by Subcontractors:

Quality Awards, Letters of Appreciation, etc.

7. Project Owner or Project Manager for the Client – provide:

Name:

Address:

Telephone Number and E-mail:

Repair Building 503A

Fort Shafter, Oahu, Hawaii

W9128A-20-R-0017

RFI # Inquiry ID # Question Government Response

1 8757215 Please provide the last day questions can be submitted via ProjNet as the date is blank on page 1 of Section 00 73 00 Appendix B See Am-0001, Section 00 73 00, Appendix B.

2 8761743 Will there be an FF&E package, and if so will it be shown in an amendment or as a separate bid package?

FF&E is not part of the contract.

3 8763660

Section 00 21 16 page 4 states that the site visit is scheduled for 8/14 @

9:30AM at Building 503A. Please provide information regarding obtaining a pass base for any companies that do not already hold base access.

Site visit was held.

4 8769446 Detail C9/A-506 calls out "Concrete Infill with Reinforcement, See

Structural Drawings." Please provide structural details for infill as none are provided.

See Am-0003, Sheet A-423, Detail E1 instead of structural drawings.

5 8769449 Detail E9/A-604 calls out "New Built Up Concrete Window Sill." Please provide structural details for new sill as none are provided.

See Am-0003, Sheet A-604, detail A7, D7, and E9

6 8769452 Paragraph 4.1.2.a. of Section 00 22 16 requires submitted projects to be substantially complete within six (6) years. Can this submission requirement be extended to seven (7) years?

See Am-0002, Section 00 22 16, para 4.1.2.a.

7 8769454

Paragraph 4.1.1.c. of Section 00 22 16 lists "renovation of multi-story barracks/multi-unit housing type projects" as the sole criteria to prove similarity in scope and complexity of work. The Government's submission requirements for project experience are overly restrictive. The contractor project experience can be showcased in projects incorporating new construction as well as renovation work. If the Government's goal is to obtain the best overall value to the Government in terms of price and quality housing construction, will the Government consider extending the references requirement for relevant construction experience as noted below to allow bid participation by all qualified contractors, increasing the number of competitive bid offers, and ensuring full and open competition in compliance with 41 U.S.C. Section 253(a)(1)(A)? It is requested that the criteria be modified to provide the following: Renovation of multi-story multi-unit concrete building (minimum 1 contract) and Construction or renovation of barracks/multi-unit housing type project (minimum 1 contract).

See Am-0003, Section 00 22 16, para 4.1.1.c

Section 00 60 00, Attachment B - Page 1

W9128A-20-R-0017

RFI # Inquiry ID # Question Government Response

8 8775212 Section 52.216-1 Type of Contract (APR 1984) of the solicitation indicates that the Government contemplates award of a Fixed-Fixed-Price contract resulting from this solicitation. Please confirm that the Government contemplates award of a Firm-Fixed Price Contract.

See Am-0002, Section 00 21 16, provision 52.216-1.

9 8775214 Solicitation Standard Form 1442-101 item 12 A states that Performance and Payment Bonds are not required. Section 00 72 00, S-28.8

Performance and Payment Bonds (OCT 1995) indicates that performance and payment bonds must be submitted within (14) calendar days after the date of contract award. Please confirm that Performance and Payment

Bonds are required to be submitted within (14) calendar days after the date of contract award.

Confirmed. See Section 00 7200, S-28.8, Performance and Payment

Bonds

10 8775215

Specification Section 10 26 00, paragraph 2.2.1 states that resilient corner guards must extend from floor to ceiling. Drawing Sheet AF603 notes that

Corner Guard (CG-1) are to be 48" high surface mounted. Please advise if there are any locations that require 48" high surface mounted corner guards in lieu of specified full height corner guards.

See Am-0003, Sheet AF603. Revision to the Corner Guard CG-1 Height from floor to the ceiling and to match what on the specs Section 10 26

00, paragraph 2.2.1. and in the interior drawings.

See Am-0003, Sheet AF603 revised ACT-1 size from 24" x 48" x 5/8" to

24" x 24" x 5/8" to match the drawings and the specs section 09 51 00 "

Acoustical Ceilings", paragraph 2.2.1.6.

11 8778546 Section 14 21 23 paragraph 2.10 calls for new car and counterweight guide rails. There is no provision for new counterweight or platform. Please confirm that the existing counterweight and platforms are to be removed and re-installed after new rails are installed.

See Am-0003, Sheet AD101, notes, and

Am-0003, Section 14 21 23.

12 8778568 Section 07 27 26 paragraph 1.9.2 requires the use of a fluid-applied air barrier installer certified by ABAA. Per the ABAA website, there are zero (0) qualified contractors in the state of Hawaii. Please delete this requirement as it excludes local participation on the project.

The provision will remain as it is a government standard requirements specified in specifications.

13 8778604 The Proposal Schedule lists CLIN 002 Concrete Spall and Void Repair and

CLIN 003 Concrete Crack Repair with Epoxy Injection as bid items.

Drawing S-011 provides typical details for a portion of this work. In order to generate a valid price proposal, a schedule of anticipated repairs – size and location – is required. Please provide a schedule of repairs. Reference project W9128A-20-R-0016 drawings S-510, S-511 and S-601 for level of information required.

Sufficient information is provided for Contractors to provide a price

Section 00 60 00, Attachment B - Page 2

W9128A-20-R-0017

RFI # Inquiry ID # Question Government Response

14 8783208 Sheet T-602 specifies Copper Riser Cable to be 25 Pair Category 6 OSP.

Please advise if it is acceptable to utilize regular Copper Riser ILO of

Category 6.

Contractor shall provide riser (backbone) cabling in accordance with specifications section 27 10 00, Building Telecommunications Cabling

System, paragraph 2.3.1, Backbone Cabling.

15 8783211 The spec calls for new main and counterweight rails. There is no provision for new counterweight or platform. Are we to remove these items and re-install after new rails are installed?

See Am-0003, Sheet AD101, notes, and

Am-0003, Section 14 21 23.

See inquiry number 8778546.

16 8784605 Laundry typ up to 714 has door listed as Type B HM with a louver sized as

2' x 5'4"; however, Type B door does not have a louver shown. Should this door be a Type E?

See Am-0003, Sheet A-601, "door schedule".

17 8784610 Laundry 214, has a door listed as a Type B HM door with a 2'x5'4" Louver, however, Type B doors are a single flush door. Should this door be a Type

E?

See Am-0003, Sheet A-601, "door schedule".

See inquiry number 8784610.

18 8784765

Section 10 44 16 calls for new bracket mounted fire extinguishers. None are shown on the drawings. Please confirm this section is to be deleted.

There is one Fire Extinguisher (FE) located and shown on sheet plan C5

Machine Room on sheet A-109.

19 8784767

A2 & E9/A-422 call out concrete infill in Elevator Machine Room. This work is not shown on the structural drawings. Please provide structural details.

See Am-0003, Sheet A-506 referring to structural drawings on Sheet E1/S-

008 for reinforcement of elevator machine room concrete in fill.

20 8785077 Para. 3.4 provides instructions for the Technical Proposal, but Para. 3.4.1.a states "Offerors shall submit the price proposal via DoD SAFE (refer to

Section 00 73 00, Appendix A)." Please revise to be clear.

See Am-0002, Section 00 22 16, para 3.4.1

21 8785081

With regard to the Technical Proposal, both Para. 3.3.2 and 3.4.2 state "Do not use a font size smaller than 10 pitch, an unusual font style such as script, or condensed print for any submission." Kindly consider allowing smaller legible font for any figures and/or charts an Offeror chooses to include as part of its Factor 3 - Technical Approach narrative response.

See Section 00 22 16, para 3.4.2.

Section 00 60 00, Attachment B - Page 3

W9128A-20-R-0017

RFI # Inquiry ID # Question Government Response

22 8785084 Note 6 of the Proposal Schedule states that "If the Offeror is other than a small business concern, the Offeror shall submit a subcontracting plan with the proposal, in accordance with FAR 52.219-9...During proposal evaluation the Contracting Officer will request an electronic format of the offeror's subcontracting plan, of what was submitted with the proposal."

However, Para. 7.1.10 of Section 00 22 16 states that "If the Offeror is a large business concern, the Offeror shall submit a subcontracting plan in accordance with FAR 52.219-9 (See Section 00 22 16, Appendix A for a sample) NO LATER THAN five (5) days after a notification request from the Contracting Officer or the Contract Specialist." Please clarify that the requirement under Para. 7.1.10 governs and if so as the submittal requirement is upon notification, please clarify if Large Business offerors must include a tab/narrative for Volume 2, Tab 7 as part of their Price

Proposal.

Large Business offerors must include a tab/narrative for Volume 2, Tab 7 as part of its Price Proposal.

23 8787407 Para. 7.1.10 of Section 00 22 16 states that "If the Offeror is a large business concern, the Offeror shall submit a subcontracting plan in accordance with FAR 52.219-9 (See Section 00 22 16, Appendix A for a sample) NO LATER THAN five (5) days after a notification request from the Contracting Officer or the Contract Specialist." Please clarify if it is five

(5) calendar or working days.

See Am-0003, Section 00 22 16, para 7.1.10.

24 8787432 Section 01 91 00.15 10 paragraph 1.7.2.d requires submission of the

Technical Commissioning Specialist's certification of qualifications no later than 30 calendar days after Notice to Proceed. Can this requirement be changed to 30 days after approval of the Commissioning Firm or Lead

Commissioning Specialist? 30 days after NTP is not sufficient time to obtain the required documentation.

The requirement will remain unchanged.

Section 00 60 00, Attachment B - Page 4

W9128A-20-R-0017

RFI # Inquiry ID # Question Government Response

25 8787642

1. B502 (T-1201) and B503A (T-602)– Plans show OSP Copper Cat-6

Backbone (25 Pair or 100 Pair), whereas the Section 27 Specifications call for Category 3.

Which is it; Cat 3 or Cat 6.

2. Building 503A – Riser Diagram T-602:

a. 1st Floor Diagram shows incoming OSP Copper by Others terminating on 110 Block. What is the Pair count of that Incoming OSP Copper so we can determine what size 110 Block we will need to terminate after the PET.

b. From the 1st Floor and up through the 7th Floor, it appears that there will be (6) 25 Pair OSP ??? Copper Backbone or Riser ??? Copper Backbone cables with (1) each terminating on a 25 Pair 110 Block on each floor.

Each floor will have (2) 25 Pair 110 Blocks and (1) 24 Pair Patch Panel

(110) Voice. Or, is the design such that each 25 Pair Cable home runs to the 1st Floor?

c. For the (6) 12 Strand OSP Fiber Optic Cables running to the upper floors, does each run go all the way back to and terminate on the FOC

Backbone on the 1st Floor? Or does each of the 12 Strand FO cables daisy chain through the FOC BBs on each floor?

d. Answers to these questions will enable us to determine the terminating types and quantities of material required.

1. See Am-0003, Section 27 10 00, to provide Category 6 Riser Rated

Backbone cable.

2a. Provide 200 Pair 110 Block after the PET.

2b. See Am-0003, Sheet T-602. 25-pair copper to be terminated in each

TR (FLR 2-7). Cables shall be ran back directly to 1st floor.

2c. See Am-0003, Sheet T-602. Each 12-strand FO cable(FL 2-7) to terminate on 1st floor.FO cable to be riser rated cable not OSP rated.

26 8787650

Within Attachment A, Experience Information, Offerors are to include a

"Contract Description-- to include the role of the contractor on the contract and specific responsibilities of the contractor in performance of the effort". Para. 4.1.1.c of Section 00 22 16 states "In addition to Attachment A, the Offeror shall provide a narrative description of each contract included in its proposal within the page limitation per paragraph 3.4.2. Each narrative shall contain a clear explanation of how the contract is similar in size, scope, and complexity to that outlined in the solicitation. At a minimum, each Offeror shall clearly demonstrate how the Offeror's experience meets the following: Renovation or new construction of multi-story barracks/multi-unit housing type projects." Is not the contract description the same as the narrative description? Please clarify to be clear as Offeror must be concise in their descriptions to meet the 2-page limitation for Attachment A.

See Am-0003, Section 00 22 16, Attachment A

Section 00 60 00, Attachment B - Page 5

W9128A-20-R-0017

RFI # Inquiry ID # Question Government Response

27 8787674

Amendment No. 0002 added Para. 4.1.2.e. However Para. 4.1.2.d was not addressed in that paragraph. Therefore, to be clear, please clarify if the following statement is correct; if not, please advise.

Offerors must submit at least two (2) and no more than five (5) relevant contracts, of which all of the following must be met:

i) The Offeror must submit at least one renovation contract that meets paragraph 4.1.2 items a through c.

ii) The Offeror must submit at least one relevant contract that was performed at a remote location (Hawaii or site similar to Hawaii) to meet paragraph 4.1.2 item d and that meets paragraph 4.1.2 items a through c.

iii) While the above-items can be met under at least one (1) relevant contract or separate contracts, the remaining contracts submitted may be either new construction or renovation, but must meet paragraph 4.1.2 items a through c.

See Am-0003, Section 00 22 16, para 4.1.2.d.

28 8787681 Factor 3 - Technical Approach. Para. 6.1.1.h requires Offerors to address

"How it will meet the solicitation/contract QC Representative qualifications."

Referring to RFP Section 01 45 04, Contractor Quality Control it does not specify QC Representative qualifications, only CQC System Manager qualifications under Para. 3.4.2. Please clarify the submission requirement.

See Am-0003, Section 00 22 16, para 6.1.1.h.

29 8787683 Amendment No. 0002 revised Para. 7.1.1 to state "The only documents that can be scanned are the items identified in paragraph 7.1.2." However, Para. 7.1.2 only refers to the Proposal Schedule. Please clarify the scanned requirement, particularly as Offerors are submitting electronic proposals, kindly allow scanning of the SF1442 and Section 00 45 00, Appendix A.

See Am-0003, Section 00 22 16, para 7.1.1.

30 8787684 Block 13B of the SF1442 notes that a bid guarantee is not required, nor is a bid guarantee stated within the RFP. A bonding capability letter was required by Para. 7.1.1 under Section 00 22 16, but that sentence was deleted. Please clarify that a bid bond nor a bonding capability letter from an Offeror's surety is indeed not required.

See Am-0003, Section 00 22 16, para 7.1.1, and para 7.1.7 regarding bonding capability.

Section 00 60 00, Attachment B - Page 6

W9128A-20-R-0017

RFI # Inquiry ID # Question Government Response

31 8787685

Amendment No. 0002 revised Para. 7.1.1 to state "The only documents that can be scanned are the items identified in paragraph 7.1.2." However, Para. 7.1.2 only refers to the Proposal Schedule. Please clarify the scanned requirement, particularly as Offerors are submitting electronic proposals, kindly allow scanning of any signed documents, such as the

SF1442; Section 00 45 00, Appendix A; and bonding capability letter.

See Am-0003, Section 00 22 16, para 7.1.1, and inquiry number 8787683.

32 8787712 The core area contains the following note "Remove Floor Tiles and Conc

Topping at 3rd and 6th Floor Only and Refinish Floor to Slope to New Floor

Drain, See Det Plan A6/A-404." No new topping slab work is required by structural drawings S-103 and S-104. Please provide structural design and details for new concrete topping work.

SeeSheet A-103 and A-104 referring to revised structural drawings sheets

SD103, SD104, S-103, and S-104 in Am-0003 for removal of concrete topping at the third and 6th floor only.

See Am-0003, Sheet A-506, detail A4 & A8 for new concrete topping.

Section 00 60 00, Attachment B - Page 7

sf30-Am-0003
Section 00 10 00, Proposal Schedule - Payments
Section 00 22 16
Section 00 60 00, Appendix B, RFIs