This document summarizes a solicitation for repair work on Building 503A at Fort Shafter in Oahu, Hawaii. The U.S. Army Corps of Engineers, Honolulu District is seeking proposals for a firm fixed-price construction contract to repair Building 503A, a 7-story non-historic building constructed around 1990. Work will include reconfiguring utility systems, renovating barracks modules and common areas, replacing interior finishes, and redesigning administrative spaces. The performance period is 780 calendar days with a project magnitude between $25-50 million. An organized site visit will be held on August 14, 2020. Proposals will be evaluated on experience, past performance, technical approach, and price using lowest price technically acceptable procedures. The contract award is intended for the best value offeror. The solicitation number is W9128A-20-R-0017 and the NAICS code is 236220.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

W

W

D

D

MTR

A B C D E F G

2.1

H

J

K

L

M

N

P

Q

STAIR #2-2

--2

ELEC

MECH ROOM

UNISEX TOILET

CQ

EXT CORRIDOR

EXT CORRIDOR

LOBBY

LAUNDRY

STAIR #1-2

--2

F C

V

FLOOR CONTROL

VALVE ASSEMBLY

PROVIDE COMPLETE AUTOMATIC FIRE

SPRINKLER PROTECTION WITHIN THIS

BOUNDARY

WET STANDPIPE

WET STANDPIPE

TELCOMM

2116" RISER DN

6" RISER DN

PROVIDE SEISMIC SEPARATION

ASSEMBLY FOR PIPING

CROSSING THE BUILDING

EXPANSION JOINT IN

ACCORDANCE WITH NFPA 13

SPRINKLER MAIN PIPING SHALL BE

INSTALLED IN SOFFITS, SEE

ARCHITECTURAL DRAWINGS FOR

LOCATIONS

LIGHT HAZARD

ORDINARY HAZARD

FIRE SPRINKLER HAZARD LEGEND

A B

ROOM B

B

ROOM A

A

CLO A

A

KITCHEN-1

--1

AC

201E

EXT CORRIDOR

CLO B

B

H

J

K

L

M

BEDROOM

CLO A

BATH

LIV/DIN/KIT

AC

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX102

BLDG503A

S E

C O

N D

F L O

O R

P L A

N

F I R

E S

P R

IN

K

L E

R

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

PLAN NORTH

1/8" = 1'-0"D1

SECOND FLOOR PLAN - FIRE SPRINKLER

1/4" = 1'-0"A1

TYPICAL LIVING UNIT - FIRE SPRINKLER

1/4" = 1'-0"A4

TYPICAL LIVING UNIT (SECOND TO SEVENTH) - FIRE SPRINKLER

02' 4' 8'1'3'4'

SCALE: 1/4"=1'-0"

SEE DETAIL A4/FX102 FOR TYPICAL LIVING UNIT

W

D

D

A B C D E F G

2.1

H

J

K

L

M

N

P

Q

STAIR #2-3

--3

ELEC

MECH ROOM

STORAGE

JAN

LAUNDRY

STAIR #1-3

--3

PROVIDE COMPLETE AUTOMATIC FIRE

SPRINKLER PROTECTION WITHIN THIS

BOUNDARY

NEW WET

STANDPIPE

NEW WET

STANDPIPE

F C

V

FLOOR CONTROL

VALVE ASSEMBLY

TELCOMM

PROVIDE SEISMIC SEPARATION

ASSEMBLY FOR PIPING

CROSSING THE BUILDING

EXPANSION JOINT IN

ACCORDANCE WITH NFPA 13

SPRINKLER MAIN PIPING SHALL BE

INSTALLED IN SOFFITS, SEE

ARCHITECTURAL DRAWINGS FOR

LOCATIONS

LIGHT HAZARD

ORDINARY HAZARD

FIRE SPRINKLER HAZARD LEGEND

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX103

BLDG503A

T H

IR

D

F L O

O R

P L A

N

S

IM

IL

A

R

F O

U R

T H

A N

D F

IF

T

H

F

IR

E

S P

R

IN

K L E

R

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

02' 4' 8'1'3'4'

SCALE: 1/4"=1'-0"

PLAN NORTH

1/8" = 1'-0"D1

THIRD FLOOR PLAN (SIMILAR @ FOURTH AND FIFTH) - FIRE SPRINKLER

W

D

D

DN

UP

A B C D E F G

2.1

H

J

K

L

M

N

P

Q

STAIR #2-4

--4

ELEC

MECH ROOM

STORAGE

JAN

LAUNDRY

STAIR #1-4

--4

PROVIDE COMPLETE AUTOMATIC FIRE

SPRINKLER PROTECTION WITHIN THIS

BOUNDARY

NEW WET STANDPIPE

NEW WET STANDPIPE

F C

V

FLOOR CONTROL

VALVE ASSEMBLY

TELCOMM

PROVIDE SEISMIC SEPARATION

ASSEMBLY FOR PIPING

CROSSING THE BUILDING

EXPANSION JOINT IN

ACCORDANCE WITH NFPA 13

SPRINKLER MAIN PIPING SHALL BE

INSTALLED IN SOFFITS, SEE

ARCHITECTURAL DRAWINGS FOR

LOCATIONS

LIGHT HAZARD

ORDINARY HAZARD

FIRE SPRINKLER HAZARD LEGEND

H

J

K

M

MACHINE RM

PROVIDE COMPLETE AUTOMATIC FIRE

SPRINKLER PROTECTION WITHIN THIS

BOUNDARY

H

J

K

M

STORAGE

PROVIDE COMPLETE AUTOMATIC FIRE

SPRINKLER PROTECTION WITHIN THIS

BOUNDARY

EC

V

ELEVATOR MACHINE

ROOM CONTROL

VALVE ASSEMBLY

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX104

BLDG503A

S

IX

T H

F L O

O R

P L A

N

S

IM

IL

A

R

S E

V E

N T

H

F

IR

E

S P

R

IN

K L E

R

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

02' 4' 8'1'3'4'

SCALE: 1/4"=1'-0"

PLAN NORTH

1/8" = 1'-0"D1

SIXTH FLOOR PLAN (SIMILAR @ SEVENTH) - FIRE SPRINKLER

1/8" = 1'-0"A1

ELEVATOR MACHINE ROOM - FIRE SPRINKLER

1/8" = 1'-0"1

ROOF PLAN - FIRE SPRINKLER

O U T

D R A

IN

A N

T E S T

PUSH

D R A

IN O

F F

TEST

O U T

D R A

IN

A N

T E S T

PUSH

D R A

IN O

F F

TEST

TEST

ELEVATOR

CAB

MACHINE ROOM

ELEVATOR

PIT

WF

P

TO ELEVATOR

POWER DISCONNECT

TO FIRE

ALARM

COUNTER WEIGHT

VS

2 INCH DRAIN UPRISER CLAMP

CONCRETE SLAB PIPE SLEEVE AROUND EACH PIPE.

SEAL PENETRATION W/ FIRE

STOPPING SEALANT

TO SPRINKLER

RISER

OS&Y CONTROL VALVE

W/ TAMPER SWITCH

2 INCH DRAIN

DOWN

24 IN. MIN. 6 IN. MIN.

WATER FLOW

ALARM

WATER PRESSURE

GAUGE

TEST AND DRAIN VALVE WITH INTEGRAL UP LISTED

PRESSURE RELIEF VALVE ABOVE THE RISER CHECK

VALVES. RELIEF VALVE SHALL BE FACTORY SET TO 175

PSI AND SHALL OPERATE TO THE OPEN POSITION

BETWEEN 90% AND 105% OF THE SET PRESSURE. RELIEF

VALVE SHALL RESEAT OR CLOSE AT A MINIMUM OF 80%

OF THE SET PRESSURE. PRESSURE RELIEF VALVES

SHALL DISCHARGE INTO THE DRAIN MANIFOLD

WFVS

TO SPRINKLER

RISER

OS&Y CONTROL VALVE

W/ TAMPER SWITCH

24 IN. MIN. 6 IN. MIN.

WATER FLOW

ALARM WITHOUT

ADJUSTABLE DELAY

WATER PRESSURE

GAUGE

TEST VALVE WITH SIGHT GLASS

WF

VS

DRAIN

FLOOR CONTROL VALVE

ELEVATOR CONTROL VALVE

PROVIDE 4-WAY SWAY

BRACING AT TOP OF RISER,

LOCATE BELOW FLEXIBLE

COUPLING IF BRACING TO

WALL

WATER MOTOR GONG

MOUNTED ON BUILDING

ALARM PRESSURE SWITCH

RETARD CHAMBER

PRESSURE GAUGES

2 IN. DRAIN TO TERMINATE

OUTSIDE 6 IN. ABOVE

CONCRETE SPLASH BLOCK

PS

FLEXIBLE COUPLING 24

INCHES WITHIN TOP

AND BOTTOM OF

RISER

DRAIN LINE

ALARM CHECK VALVE,

PADLOCK AND CHAIN

ISOLATION TEST VALVE

IN OPEN POSITION

OS&Y CONTROL VALVE IN

OPEN POSITION WITH

TAMPER SWITCH (TYPICAL)

VS

SMALL VALVE WITH

TAMPER SWITCH

FLEXIBLE COUPLING

MINIMUM TWO 3/4" STEEL TIE

RODS, BITUMASTIC COATED

SPLASH

BLOCK

CONCRETE THRUST BLOCK AT BASE

OF RISER 10.0 SF MINIMUM OF

BEARING SURFACE

UNDER GROUND WATER

SUPPLY, SEE CIVIL DRAWINGS

FOR CONTINUATION

VS

VS

DOUBLE CHECK VALVE

BACKFLOW ASSEMBLY

CONC SLAB

ALL THREAD

ROD (TYP) *

END OF BRANCH

LINE SURGE

RETAINER CLIP

EXPANSION BOLT (TYP)

ADJUSTABLE

RING HANGER

ROD COUPLING

ROD SIZE SHALL BE DETERMINED BY CALCULATIONS IN ACCORDANCE

WITH NFPA 13, PARAGRAPH 9.3.6.1(5) AND 9.3.6.1, WHERE L/R DOES

NOT EXCEED 400

"A

PROVIDE A SECOND

RESTRAINT IN THE

OPPOSITE DIRECTION

WHEN "A" = 29" OR

GREATER

CONC SLAB

SWAY BRACE

FITTINGS

SCHEDULE

40 PIPE *

SPRINKLER

CROSS MAIN

EXPANSION BOLT

PIPE CLAMP

* PIPE SIZE SHALL BE DETERMINED BY CALCULATIONS

CONC SLAB

SWAY BRACE

FITTINGS

SCHEDULE

40 PIPE *

PIPE CLAMP

SPRINKLER

CROSSMAIN

* PIPE SIZE SHALL BE DETERMINED BY CALCULATIONS

EXPANSION BOLT (TYP)

UL LISTED FIRE STOPPING ASSEMBLY

COUPLING

TYPICAL

CONDUIT OR

PIPING

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX501

BLDG503A

F

IR

E S

P R

IN

K

L E

R D

E T

A

IL

S

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

NO SCALED8

ELEVATOR DETAIL

NTSC5

CONTROL VALVE DETAIL

NO SCALEE1

WET PIPE SPRINKLER RISER DETAIL

NOT TO SCALEA7

TYPICAL END-HEAD RESTRAINT (CONC)

NOT TO SCALEA4

LONGITUDINAL SWAY BRACING DETAIL (CONC)

NOT TO SCALEA1

LATERAL SWAY BRACING DETAIL (CONC)

NOT TO SCALEC7

TYPICAL THROUGH-PENETRATION DETAIL

__THIRD FLR

_FOURTH FLR

__FIFTH FLR

__SIXTH FLR

__SEVENTH FLR

_SECOND FLR

_FIRST FLR

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

2-1/2" HOSE VALVE

FIRE DEPARTMENT

CONNECTION FOR

STANDPIPE

WET SPRINKLER RISER

DOUBLE CHECK VALVE

ASSEMBLY

FIRE DEPARTMENT CONNECTION

AND TEST HEADER

FCV-1

FCV-2

FCV-3

FCV-4

FCV-5

FCV-6

FCV-7

6" OS&Y VALVE AND

WATERFLOW SWITCH

2" STANDPIPE FILL

6" OS&Y VALVE AND

WATERFLOW SWITCH

2-1/2" HOSE VALVE

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FX601

F

IR

E S

P R

IN

K

L E

R A

N D

S T

A N

D P

IP

E

I S

O M

E T

R

IC

P

IP

IN

G

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

D e s ig n e r

A u th o r

C h e c k e r

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

B2

FIRE SPRINKLER AND STANDPIPE ISOMETRIC PIPING

F

S

F

S

F

S

F

S

FS

F

S15

F

F

F

SS

WP

S

WP

S

WP

S

15,W P

F S

F S

W P

S

W P

S

W P

S

15C

S

F

LO

C

AN

N

15F

WP

VS

VS

ET

ET

ET

,W

P

F W

P

F S

S

15C

S

F

30 F

F

S

F

S

DOAS

S

ET

VS WF

VS

PS

VS

VS WF

WF

F E

P

P S

A B C D E F G

2.1

H

J

K

L

M

N

P

Q

SECURE RM

PUMP RM

STAIR #2-1

--1

CONFERENCE RM

TRAINING RM

ELEC

110PLATOON D

107D

PLATOON C

107C

HALL

COMM STOR

MEN

ELEC RM

LOBBY

EXT WALKWAY

NBC STOR

MECH ROOM

CORRIDOR

PLATOON A

107A

PLATOON B

107B

UNIT STORAGE

CO

XO

1SG

STAIR #1-1

--1

EXT WALKWAY

ARMS VAULT

TELCOMM

MAIL RM

RECYCLE RM

COMMAND

RESTROOM

JAN

OS

OS

OS

OS

OS

OS

OS

OS OS

OS OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FA101

BLDG503A

F

IR

S T

F L O

O R

P L A

N

F

IR

E A

L A

R M

/M A

S S

N O

T

IF

IC

A

T

IO

N

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

1/8" = 1'-0"D1

FIRST FLOOR PLAN - FIRE ALARM/MASS NOTIFICATION

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

02' 4' 8'1'3'4'

SCALE: 1/4"=1'-0"

PLAN NORTH

W

D

D

S

SS

S

S

S

S S

WP

S

WP

S

WP

S

S

S

W P

S

W P

S

S

S

WP15

W P

S

S

WP15

W P

F

W P

W P

F

WP

P

SS

P

SS

P

SS

P

SS P

SS

P

SS

P

SS

P

SS

P

SS

WP

W P

LO

C

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

VS

ET

WF

ET

S S S

S

S

S

S

F M

C P

F T

R

FEP

P S

S

S

S

P

SS

MTR

P

SS

S S S

S

S

P

SS

P

SS

P

SS

P

SS

P

SS

A B C D E F G

2.1

H

J

K

L

M

N

P

Q

STAIR #2-2

--2

ELEC

MECH ROOM

UNISEX TOILET

CQ

EXT CORRIDOR

EXT CORRIDOR

LOBBY

LAUNDRY

STAIR #1-2

--2

OS

OS

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FA102

BLDG503A

S E

C O

N D

F L O

O R

P L A

N

F

IR

E A

L A

R M

/M A

S S

N O

T

IF

IC

A

T

IO

N

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

02' 4' 8'1'3'4'

SCALE: 1/4"=1'-0"

PLAN NORTH

SECOND FLOOR PLAN - FIRE ALARM/MASS NOTIFICATION

W

D

D

S

S

S

S

SS

WP

S

WP

S

WP

S

S S S

S

W P

S

S

S

S

S

S

15 15WP

W P

W P

W P

S

W P

S

W P

F

WP

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

LO

C

WP

F

W P

ET

ET

VS

WF

S

S S S

S

S

S

P

SS

P

SS

S

S

F E

P

P S

S S S

S

S

P

SS

P

SS

P

SS

P

SS

P

SS

A B C D E F G

2.1

H

J

K

L

M

N

P

Q

STAIR #2-3

--3

ELEC

MECH ROOM

STORAGE

JAN

LAUNDRY

STAIR #1-3

--3

TELCOMM

OS

OS

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FA103

BLDG503A

T H

IR

D

F L O

O R

P L A

N

S

IM

IL

A

R

F O

U R

T H

A N

D F

IF

T

H

F

IR

E

A L A

R M

/M A

S S

N O

T

IF

IC

A

T

IO

N

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

02' 4' 8'1'3'4'

SCALE: 1/4"=1'-0"

PLAN NORTH

THIRD FLOOR PLAN (SIMILAR @ FOURTH AND FIFTH) - FIRE ALARM/MASS NOTIFICATION

W

D

D

F

WP

S

15WP

S

S

S

S S

S S S

S

S S

S

S

WP

S

WP

S

WP

S

WP15

W P

S

W P

S

S

W P

W P

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

WP

F

W P

W P

LO

C

W P

S

ET

ET

VS

WF

S

S S S

S

S

S

S

S

S

P

SS

P

SS

P

SS

F E

P

P S

S S S

S

S

P

SS

P

SS

P

SS

P

SS

P

SS

DN

F S

P S

UP

F S

VS

WF

A B C D E F G

2.1

H

J

K

L

M

N

P

Q

STAIR #2-4

--4

ELEC

MECH ROOM

STORAGE

JAN

LAUNDRY

STAIR #1-4

--4

TELCOMM

OS

OS

H

J

K

M

MACHINE RM

H

J

K

M

STORAGE

PROVIDE TAMPER AND

WATERFLOW SWITCH FOR

ELEVATOR MACHINE ROOM

CONTROL VALVE ASSEMBLY

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FA104

BLDG503A

S

IX

T H

F L O

O R

P L A

N

S

IM

IL

A

R

S E

V E

N T

H

F

IR

E

A L A

R M

/M A

S S

N O

T

IF

IC

A

T

IO

N

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

04' 8' 16'2'6'8'

SCALE: 1/8"=1'-0"

02' 4' 8'1'3'4'

SCALE: 1/4"=1'-0"

PLAN NORTH

1/8" = 1'-0"D1

SIXTH FLOOR PLAN (SIMILAR @ SEVENTH) - FIRE ALARM/MASS NOTIFICATION

1/8" = 1'-0"A1

ELEVATOR MACHINE ROOM - FIRE ALARM

1/8" = 1'-0"1

ROOF PLAN - FIRE ALARM

VISUAL OR

AUDIO/VISUAL

DEVICE

MANUAL FIRE ALARM

PULL STATION

AUDIO DEVICE

WHERE LOW CEILING HEIGHT DO NOT PERMIT MOUNTING AT A MINIMUM OF 80", VISIBLE

APPLIANCES SHALL BE MOUNTED WITHIN 6" OF THE CEILING. THE ROOM SIZE COVERED

BY A STROBE OF A GIVEN VALUE SHALL BE REDUCED BY TWICE THE DIFFERENCE

BETWEEN THE MINIMUM MOUNTING HEIGHT OF 80" AND THE ACTUAL LOWER MOUNTING

HEIGHT.

AUDIO DEVICE MOUNTING HEIGHTS OTHER THAN REQUIRED ABOVE SHALL BE PERMITTED,

PROVIDED THAT THE SOUND PRESSURE LEVEL REQUIREMENTS BASED ON APPLICATION

(EX. PUBLIC MOD) ARE MET.

FIRE

FIRE

6'

" 7'

5'-0"

MAX.

4'

FINISHED FLOOR

1.

2.

NOTE:

LOCAL PAGE ACTIVE

REMOTE PAGE BUSY

TROUBLE

NOTE: MOUNT TOP OF LOC PANEL 48" AFF

PLEXIGLASS AREA

THUMB LOCK

MSG. 1

MSG. 2

MSG. 3

MSG. 4

MSG. 5

MSG. 6

MSG. 7

MSG. 8

AHU SHUT

DOWN

ANTENNA

PROVIDE SUPPORT FOR

VERTICAL PORTION OF

RACEWAY ABOVE ROOF

CONDUUIT CLAMP

LIGHTING

ARRESTOR WITH

ENCLOSURE, SEE

1 INCH

GALVANIZED RIGID

CONDUIT

TO INDIVIDUAL

GROUNDING ROD PER

NEC

COPPER WIRE SHALL

NOT BE SMALLER

THAN #10 PER NEC

EXTERIOR WALL

GRADE

ROOF

RADIO FIRE ALARM OR MASS

NOTIFICATION TRANSCEIVER

CONC SLAB

CONNECT TO

INDIVIDUAL

GROUNDING ROD

PROVIDE #6 BONDWIRE FROM

INDIVIDUAL GROUNDING ROD TO

BUILDING GROUNDING SYSTEM

IN

. T O

IN

F R

O M

P E

A K

O F

R O

O F

TOP OF DETECTOR

ACCEPTABLE HERE

DETECTOR LOCATION

IS ACCEPTABLE HERE

ABOVE ACCEPTABLE HEIGHT

BELOW ACCEPTABLE HEIGHT

CEILING

SIDEWALL

M A

X

IM

U M

IN

C H

E S

SIDE VIEW - WEATHERPROOF

ENCLOSURE

WEATHERPROOF ENCLOSURE

STATIC DISCHARGE UNIT

GROUND BUSHING

COAXIAL CABLES

ARE NOT SHOWN

#10 COPPER

UL LISTED FIRE STOPPING ASSEMBLY

COUPLING

TYPICAL

CONDUIT OR

PIPING

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

FE SS ION AL ENG IN

EE

R

T A

TE

OF WASH ING

T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FA501

BLDG503A

F

IR

E A

L A

R M

/M A

S S

N O

T

IF

IC

A

T

IO

N D

E T

A

IL

S

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

NTSD1

MOUNTING HEIGHTS FOR FIRE ALARM DEVICES

NTSA1

LOC PANEL FACE DETAIL

NOT TO SCALED4

ANTENNA MONACO TRANSCEIVER

NO SCALEA4

MOUNTING FOR SMOKE DETECTORS

NOT TO SCALE

LIGHTNING ARRESTOR DETAIL

NOT TO SCALEB7

TYPICAL THROUGH-PENETRATION DETAIL

MANUAL PULL STATION ALARM ACTIVATION

GENERAL SUPERVISORY ACTIVATION

SMOKE DETECTOR ACTIVATION

RADIO FIRE ALARM TRANSCEIVER ZONES

WATER FLOW / PRESSURE SWITCH ACTIVATION

MASS NOTIFICATION SUPERVISORY ACTIVATION

GENERAL TROUBLE

SYSTEM INPUT

FIRE ALARM/ MASS NOTIFICATION SEQUENCE OF OPERATIONS

SYSTEM OUTPUT

TROUBLE ON FIRE ALARM EXTENDER PANEL

A B C D E F G

TRANSM

IT

A

LA

RM

T

O E

M

ERG

ENCY F

O

RCES

ACTIV

ATE V

IS

IB

LE

A

ND A

UDIB

LE

A

LA

RM

A

NNUNCIA

TO

R

TRANSM

IT

S

UPERVIS

O

RY A

LA

RM

T O E

M

ERG

ENCY F

O

RCES

TRANSM

IT

T

RO

UBLE

A

LA

RM

T O E

M

ERG

ENCY F

O

RCES

ACTIV

ATE M

ASS N

O

TIF

IC

ATIO

N V

IS

IB

LE

S

UPERVIS

O

RY A

NNUNCIA

TO

R

ACTIV

ATE V

IS

IB

LE

A

ND A

UDIB

LE

S

UPERVIS

O

RY A

NNUNCIA

TO

R

ACTIV

ATE V

IS

IB

LE

A

ND A

UDIB

LE

T

RO

UBLE

A

NNUNCIA

TO

R

ACTIV

ATE A

LL

F

IR

E A

LA

RM

N O

TIF

IC

ATIO

N A

PPLI

ANCES A

ND B

RO

ADCAST F

IR

E A

LA

RM

M

ESSAG

E

ACTIV

ATE V

IS

UAL

APPLI

ANCES

BRO

ADCAST M

ASS N

O

TIF

IC

ATI

O N M

ESSAG

E

TRANSM

IT

M

ASS N

O

TIF

IC

ATIO

N S

UPERVIS

O

RY T

O E

M

ERG

ENCY F

O

RCES

SPRINKLER WATER FLOW OR PRESSURE SWITCH

MANUAL PULL STATION

SMOKE DETECTOR ABOVE PANEL

SINGLE BREAK OR SINGLE GROUND FAULT IN FIRE ALARM CIRCUIT

ACTIVATION OF MASS NOTIFICATION LIVE OR RECORDED MESSAGE

ACTIVATION OF MASS NOTIFICATION LIVE OR RECORDED MESSAGE DURING AN ACTIVE ALARM *

SPRINKLER VALVE TAMPER SWITCH

H I J K L M

NOTE:

1. IF THE SEQUENCE INDICATED HERE CONFLICTS WITH SPECIFICATION, THIS CONTROL

SEQUENCE SUPERCEDES SPECIFICATION SEQUENCE.

* FIRE ALARM NOTIFICATION APPLIANCE OVERRIDE TO BE AUTOMATIC UPON ACTIVATION OF

MASS SYSTEM PRE-RECORDED MESSAGE OR MICROPHONE

ACTIV

ATE A

LL

L

O W

F

REQ

UENCY S

O

UNDER B

ASES IN

D

W

ELL

IN

G U

NIT

ACTIVATION OF DWELLING UNIT SMOKE DETECTOR9

N O

COMPLETION OF MASS NOTIFICATION LIVE OR RECORDED BROADCAST DURING AN ACTIVE ALARM10

A B C D E F G H I J K L M N O

ACTIVATION OF ELEVATOR MACHINE ROOM SMOKE DETECTOR

ACTIVATION OF 1ST FLOOR ELEVATOR LOBBY HEAT DETECTOR

ACTIVATION OF 2ND-7TH FLOOR ELEVATOR LOBBY HEAT DETECTOR

P

IN

IT

IA

TE E

LE

VATO

R R

ECALL

PRIM

ARY F

LO

O R

Q

IN

IT

ATE E

LE

VATO

R R

ECALL

ALT

ERNATE F

LO

O R

R

ELE

VATO

R S

HUNT T

RIP

S

IL

LU

M

IN

ATE F

IR

EFIG

HTER'S

H

AT -

STEADY

P Q R S

T

IL

LU

M

IN

ATE F

IR

EFIG

HTE

R'S H

AT -

FLA

SHIN

G

T

ACTIVATION OF ELEVATOR SPRINKLER FLOW SWITCH

IL

LU

M

IN

ATE L

ED T

EXT S

IG

N "E

VACUATE"

IL

LU

M

IN

ATE L

ED T

EXT S

IG

N "A

NNO

UNCEM

ENT"

U

U

O

VERRID

E L

IG

HTIN

G M

O

TIO

N S

ENSO

RS A

ND A

CTIV

ATE

ALL

L

IG

HTIN

G

15 ACTIVATION OF DUCT SMOKE DETECTOR 15

SHUT D

O W

N A

SSO

CIA

TED A

IR

H

ANDLI

NG

U

NIT

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

FE SS ION AL ENG IN

EE

R

T A T E

OF WASH ING

T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FA601

BLDG503A

F

IR

E A

L A

R M

/M A

S S

N O

T

IF

IC

A

T

IO

N S

E Q

U E

N C

E O

F O

P E

R A

T

IO

N S

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

SHUT DOWN DOAS-1

20A, 1PH

PANEL FP, SEE

ELECTRICAL

AIM AOM AIM AIM AIM AIM AIM AIM AIM AIM

AIM AIM

AOM AOM AOM AOM AOM AOM AOM AOM AOM AOM AOM AOM AOM AOM AOM

AOM AOM AOM AOM AOM AOM AOM

F O

R C

O N

T

IN

U A

T

IO

N S

E

O

R C

O N

T

IN

U A

T

IO

N S

FROM FMCP ON

SECOND FLOOR,

ROOM CQ 213

ELEC

MECH ROOM

UNIT

STORAGE

EXT

WALKWAY

PLATOON D

107D

PLATOON C

107C

HALL

NBC STOR

EXT WALKWAY

COMM STOR

SECURE RM

EXT

WALKWAY

ARMS VAULT

PLATOON A

107A

PLATOON B

107B

UNIT STORAGE

MECH ROOM

MEN

EXT WALKWAY

WOMEN

CO

XO

1SG

TRAINING RM

CONFERENCE RM

EXT WALKWAY

CORRIDOR

EXT WALKWAY

CORRIDOR

EXT WALKWAY

EXT WALKWAY

ELEC RM

PUMP RM

MAIL RM

LOBBY

EXT WALKWAY

TELCOMM

COMMAND

RESTROOM

RECYCLE RM

JANITOR

STAIR #1-2

--2

STAIR #2-2

--2

F F

S

WFVS VS VS

F

S

WP

S

F

F

F

ET

F

S WP

S

F

S

F

S WP

S

F

S

15 15

S

S

15C 15,WP

F

WP

15C 15

15 15 15

S

F

WP

S

F

ET

WP

S

LOC

ET

F

WP

S S

ANN

S

F

S

F

S

F

15,WP

S

F

S

F

OSOSOSOS OSOS

OSOSOS OS

OS

OSOSOSOSOSOSOSOSOSOS

S

R

DOAS

ET

FEP

TVSS

VS PS WFVS

WFVS

S P

LIGHTING

ARRESTOR

ANTENNA

TO GROUND

20A, 1PH

20A, 1PH

PANEL FP, CKT 1

PANEL FP, CKT 3

20A, 1PH

PANEL FP, CKT 5

20A, 1PH

SEE ELECTRICAL

LIGHTING

ARRESTOR

ANTENNA

TO GROUND

AOM AIM AOM AIM AIM

AOM

F O

R C

O N

T

IN

U A

T

IO

N S

B

O

R C

O N

T

IN

U A

T

IO

N S

B

TO FIRST FLOOR

ELEC

EXT WALKWAY

MECH ROOM

KITCHEN

204C

EXT WALKWAY

KITCHEN

203C

EXT WALKWAY

KITCHEN

202C

EXT WALKWAY

KITCHEN

201C

UNIT

201A

UNIT

201B

UNIT

202B

UNIT

202A

UNIT

203A

UNIT

203B

UNIT

204B

UNIT

204A

MECH ROOM

UNIT

206A

UNIT

206B

UNIT

207A

UNIT

207B

UNIT

208A

UNIT

208B

KITCHEN

208C

EXT WALKWAY

KITCHEN

207C

EXT WALKWAY

KITCHEN

206C

LAUNDRY

DAY ROOM

TELCOMM

EXT WALKWAY

LOBBY

LOBBY

JAN/SUPPLY RM

UNISEX TOILET

CQ

F

WP

WP

S

ET

WFVS

WP

S

P

SS

P

SS

WP

S

P

SS

P

SS

P

SS

P

SS

P

SS

15WPWP

S

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

WP

S

F

WP

ET

P

SS

WP

S

P

SS

LOC

30 WP

S

WP30

15WP 15WP 30 15WP

S S S S S S S S S S S S S S S S S S S S S

S S S SS

OS

OS

FTR FMCP

TVSSTVSS

TVSS

FEP

P S

MTR

TVSS

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FA602

BLDG503A

F

IR

E A

L A

R M

/M A

S S

N O

T

IF

IC

A

T I O

N R

IS

E

R D

IA

G

R A

M

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

1/8" = 1'-0"A1

FIRST FLOOR - FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM

SECOND FLOOR - FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM

20A, 1PH

PANEL FP, SEE

ELECTRICAL

AIM AOM AIM AIM

AOM AOM

F O

R C

O N

T

IN

U A

T

IO

N S

C

O

R C

O N

T

IN

U A

T

IO

N S

C

TO FMCP ON

SECOND FLOOR,

ROOM CQ 213

ELEC

EXT WALKWAY

MECH ROOM

KITCHEN

304C

EXT WALKWAY

KITCHEN

303C

EXT WALKWAY

KITCHEN

302C

EXT WALKWAY

KITCHEN

301C

UNIT

301A

UNIT

301B

UNIT

302B

UNIT

302A

UNIT

303A

UNIT

303B

UNIT

304B

UNIT

304A

MECH ROOM

UNIT

306A

UNIT

306B

UNIT

307A

UNIT

307B

UNIT

308A

UNIT

308B

KITCHEN

308C

EXT WALKWAY

KITCHEN

307C

EXT WALKWAY

KITCHEN

306C

LAUNDRY

LOBBY

DAY ROOM

STORAGE

JAN

TELCOMM

EXT WALKWAY

LOBBY

F

WP

WP

S

ET

WFVS

WP

S

P

SS

P

SS

WP

S

P

SS

P

SS

P

SS

P

SS

P

SS

15WPWP

S

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

WP

S

F

WP

ET

P

SS

WP

S

P

SS

LOC

30 WP

S

WP30

15WP 15WP 30 15WP

S S S S S S S S S S S S S S S S S S S S S

S S S S S S

OSOS

FEP

TVSS

S P

20A, 1PH

PANEL FP, SEE

ELECTRICAL

SHUNT POWER

TO ELEVATOR

AIM AIM

AOM AOM

AIM AOM

AIM AIM

F O

R C

O N

T

IN

U A

T

IO

N S

O

R C

O N

T

IN

U A

T

IO

N S

TO FMCP ON

SECOND FLOOR,

ROOM CQ 213

ELEC

EXT WALKWAY

MECH ROOM

KITCHEN

604C

EXT WALKWAY

KITCHEN

603C

EXT WALKWAY

KITCHEN

602C

EXT WALKWAY

KITCHEN

601C

UNIT

601A

UNIT

601B

UNIT

602B

UNIT

602A

UNIT

603A

UNIT

603B

UNIT

604B

UNIT

604A

MECH ROOM

UNIT

606A

UNIT

606B

UNIT

607A

UNIT

607B

UNIT

608A

UNIT

608B

KITCHEN

608C

EXT WALKWAY

KITCHEN

607C

EXT WALKWAY

KITCHEN

606C

LAUNDRY

LOBBY

DAY ROOM

LOBBY

STORAGE

JAN

TELCOMM

EXT WALKWAY

MACHINE RM

STORAGE

F

WP

WP

S

ET

WFVS

WP

S

P

SS

P

SS

WP

S

P

SS

P

SS

P

SS

P

SS

P

SS

15WPWP

S

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

P

SS

WP

S

F

WP

ET

P

SS

WP

S

P

SS

LOC

WP

S

30 WP

S

WP30

15WP 15WP 30 15WP

P S F

S S S S S S S S S S S S S S S S S S S S S

S S S S S S

S

OS OS

FEP

TVSS

F

S

WFVS

S P

07/22/2021 Expiration Date of the License

JA

Y

THOMAS H IGASH

I

P

R

EG I S T ERE

D31715

S

R O

F

E

SS ION AL ENG IN

E E

R

T A T E

OF WASH IN

G T O

N

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

FA603

BLDG503A

F

IR

E A

L A

R M

/M A

S S

N O

T

IF

IC

A

T I O

N R

IS

E

R D

IA

G

R A

M

F Y

O

M A

R E

P A

IR

B

U

IL

D

IN

G

A

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I -5

R E

G

IO

N A

L E

N G

IN

E

E R

IN

G

C E

N T

E R

H O

N O

L U

L U

D

IS

T R

IC

T

H O

N O

L U

L U

H

I

J T

H

J B

P

R T

B

J U

N

DESIGN COMPLETE SUBMITTAL

F O

R T

S H

A F

T E

R O

A H

U H

A W

A

II

1/8" = 1'-0"A1 THIRD FLOOR (SIMILAR @ FOURTH AND FIFTH) - FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM

SIXTH FLOOR (SIMILAR @ SEVENTH) - FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM

PLUMBING LEGEND

SYMBOL ABBREV. DESCRIPTION

AFF ABOVE FINISHED FLOOR

DN DOWN

EXST EXISTING

POC POINT OF CONNECTION

CHECK VALVE

DCW DOMESTIC COLD WATER

FCO/COTG FLOOR CLEAN OUT / CLEAN OUT TO GRADE

GV GATE VALVE

HB HOSE BIBB

DHW

SERVICE SINK

V VENT

WCO WALL CLEANOUT

WHA WATER HAMMER ARRESTOR

DEMOLISH EXISTING

SS

DIA DIAMETER

UON UNLESS OTHERWISE NOTED

SP SUMP PUMP

SYMBOL ABBREV. DESCRIPTION

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

KS KITCHEN SINK

SH SHOWER

UR URINAL

WC WATER CLOSET

PR PROPANE

FS FLOOR SINK

VTR VENT THRU ROOF

WH WATER HEATER

ø

SANITARY WASTE / WASTES / SAN / W

POR POINT OF REMOVAL

BV BALL VALVE

RPBP REDUCED PRESSURE BACKFLOW PREVENTER

TRAP PRIMERTP

DHWR

DOMESTIC HOT WATER

BLW BELOW PRV PRESSURE REDUCING VALVE

BALANCE VALVE

UNION

DOMESTIC HOT WATER RETURN

FLEX CONNECTION

OR

DWV DRAIN WASTE VENT

CO CLEAN OUT

TEMPERED WATER RETURNTWR

TEMPERED WATER SUPPLYTWS

SOV SHUT OFF VALVE

HWRCP HOT WATER RETURN CIRCULATING PUMP

LAV LAVATORY

TYPICALTYP

SIMILARSIM

TEMPERATURE & PRESSURET&P

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

P-001

BLDG503A

PL

U

M

BI

N G

G

EN

ER

AL

N O

TE

S

A N D

L E G

EN

D

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

PLUMBING GENERAL NOTES

1. THE ENTIRE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE CODES AND REQUIREMENTS

LISTED IN CONTRACT DOCUMENTS.

2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO COVER THE COMPLETE INSTALLATION OF

SYSTEMS TO FUNCTION AS DESCRIBED AND SPECIFIED. THE OMISSION OF REFERENCE TO ANY

NECESSARY ITEM OF LABOR OR MATERIAL SHALL NOT RELIEVE THE CONTRACTOR FROM

PROVIDING SUCH LABOR AND MATERIAL.

3. ALL EQUIPMENT SHALL BE CAPABLE OF FITTING INTO THE SPACES ALLOCATED WHILE MEETING THE

MANUFACTUER'S RECOMMENDED ACCESS REQUIREMENTS. REVIEW ALL SPACES WHERE

EQUIPMENT IS TO BE INSTALLED PRIOR TO ORDERING OF EQUIPMENT AND NOTIFY THE ENGINEER

OF ANY INADEQUATE CLEARANCES OR CONDITIONS THAT WILL PREVENT THE PROPER

INSTALLATION, MAINTENANCE, AND OPERATION OF EQUIPMENT.

4. COORDINATE WITH OTHER TRADES PRIOR TO COMMENCING AND DURING CONSTRUCTION.

OVERLAY PLANS AND CHECK FOR ANY DISCREPANCIES OR CONFLICTS WITH OTHER TRADES.

5. VERIFY AND COORDINATE ALL WALL, FLOOR, AND ROOF PENETRATIONS WITH THE STRUCTURAL

AND ARCHITECTURAL DRAWINGS PRIOR TO THE START OF CONSTRUCTION.

6. OBTAIN APPROVAL FROM THE STRUCTURAL ENGINEER BEFORE MAKING ANY PENETRATIONS

THROUGH STRUCTURAL MEMBERS, WALLS, AND SLABS.

7. VERIFY THE EXACT LOCATION, SIZE, AND INVERT OF ALL EXISTING SEWER, STORM DRAIN, AND

WATER LINES AT THE NEW POINT OF CONNECTION PRIOR TO THE START OF CONSTRUCTION.

8. LOCATE ALL UTILITY LINES OR OTHER INTERFERENCES IN AREAS OF PROPOSED TRENCH WORK PRIOR TO START OF EXCAVATION, SEE CIVIL DRAWINGS. REPAIR OR PAY FOR ALL DAMAGES TO

EXISTING UTILITIES.

9. DRAWINGS DO NOT ATTEMPT TO SHOW EXACT DETAILS OF PIPING. PROVIDE OFFSETS AS

NECESSARY TO AVOID LOCAL OBSTRUCTIONS OR INTERFERENCE WITH OTHER TRADES. REVIEW

ALL PIPING RUNS PRIOR TO INSTALLATION AND IMMEDIATELY NOTIFY THE GENERAL CONTRACTOR

OF ANY INTERFERENCE AND/OR LACK OF ADEQUATE CLEARANCES.

10. SHOULD PROJECT CONDITIONS REQUIRE REARRANGEMENT OF WORK, MARK SUCH CHANGES ON

THE AS-BUILT DRAWINGS. IF THESE CHANGES REQUIRE ALTERNATE METHODS TO THOSE

APPROVED BY THE CONTRACT DOCUMENTS, SUBMIT A RFI SHOWING THE PROPOSED ALTERNATE

METHODS TO THE GOVERNMENT FOR REVIEW. DO NOT PROCEED UNTIL REVIEWED.

11. PATCH AND PAINT ALL EXPOSED PIPING TO MATCH ADJACENT SURFACE OR AS INDICATED.

12. REPAIR ANY DAMAGE TO EXISTING CONSTRUCTION RESULTING FROM THE INSTALLATION OF

PLUMBING ITEMS. THE AREAS REPAIRED SHALL MATCH THE ADJACENT SURFACES IN TEXTURE AND

COLOR.

13. PROPERLY FIRESTOP ALL PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, OR PARTITIONS

WITH A UL APPROVED SYSTEM APPROPRIATE FOR THE PENETRATION TYPE AND FIRE RATING.

FIRESTOP ALL PENETRATIONS BETWEEN FLOORS.

14. PROVIDE ACCESS PANELS TO ALL CONCEALED VALVES, DAMPERS, WATER HAMMERS, AND

EQUIPMENT. PANELS SHALL BE AS SPECIFIED. SIZES WILL BE DETERMINED BY SUBCONTRACTORS AS TO WHAT IS NEEDED TO SERVICE OR ACCESS. COORDINATE THE LOCATION OF ACCESS PANELS TO ENSURE THAT THE EQUIPMENT CAN BE MAINTAINED ADEQUATELY. ACCESS PANELS SHOULD BE

LOCATED IN CLOSETS, STORAGE AREAS, OR INCONSPICUOUS SPACES TO BE REVIEWED BY THE

GENERAL CONTRACTOR ON FINAL LOCATION AND SIZES. THE ACCESS PANELS SHALL MATCH THE

FIRE RATING FOR THE WALLS OR CEILINGS THAT THEY ARE PENETRATING.

15. PROVIDE ISOLATION VALVES ON PIPING BRANCH LINES IN ACCESSIBLE LOCATIONS WITHOUT THE

NEED OF A LADDER TO GAIN ACCESS WHETHER SHOWN ON THE DRAWINGS OR NOT. SHOW ALL

ISOLATION VALVES ON THE AS-BUILT DRAWINGS.

16. SEISMICALLY BRACE ALL EQUIPMENT AND PIPING IN ACCORDANCE WITH THE CONTRACT

SPECIFICATIONS.

17. INSULATE ALL SEWER PIPING RECEIVING AIR CONDITIONING CONDENSATE DRAINS, ICE DRAINS, OR

ANY OTHER COLD LIQUID WHICH MAY CREATE CONDENSATION FROM POINT OF CONNECTION TO

THE TOP OF CONCRETE SLAB-ON GRADE. INSULATE FLOOR DRAIN AND FLOOR SINK BODIES

EXPOSED TO AIR BELOW THE FLOOR.

18. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR AND PROVIDE ALL CAULKING AND SEALANT

REQUIRED TO COMPLETE THE INSTALLATION OF ALL PLUMBING FIXTURES AND FITTINGS. SEE

CAULKING AND SEALANT SPECIFICATIONS IN CONTRACT SPECS FOR APPROPRIATE CAULKING AND

SEALANT SPECIFICATIONS.

19. VERIFY THE EXACT LOCATION, SIZE, AND INVERT OF ALL EXISTING SEWER, STORM DRAIN, AND

WATER LINES AT THE NEW POINT OF CONNECTION PRIOR TO THE START OF CONSTRUCTION.

20 COORDINATE ALL EXTERIOR BELOW GRADE PIPING INSTALLATION ON THESE PLANS WITH CIVIL

SITE CONTRACTOR.

21 PROVIDE FACTORY PRE-INSULATED PIPING FOR THE DOMESTIC HOT WATER AND HOT WATER

RETURN, SEE SPECIFICATION SECTION 23 05 15 COMMON PIPING. CARRIER PIPE SHALL BE COPPER

FOR BOTH.

B C D E F G

2.1

H

J

K

L

N

P

Q

REMOVE EXISTING DOMESTIC HOT WATER PLANT IN IT'S

ENTIRELY INCLUDING, BUT NOT LIMITED TO HOT WATER

SUPPLY, HOT WATER RETURN, TEMPERED WATER SUPPLY,

TEMPERED WATER RETURN, COLD WATER MAKE-UP, MIXING

VALVE STATION, STORAGE TANK, ABANDONED HEAT PUMPS &

ACCESSORIES.

EXISTING DESUPERHEATER

TO REMAIN. REMOVE

EXISTING TEMPERED

WATER SUPPLY AND

RETURN PIPING AND

ACCESSORIES.

EXISTING

MECHANICAL

YARD

SALVAGE GAS BOILER

AND TANKLESS GAS

HEATER, COORDINATE

W/ DPW SHOPS AND PROJECT

MANAGER FOR PICKUP

M

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PD101

BLDG503A

D

EM

O

LI

T I O

N P

LU

M

B I N

G P

LA

N

FI

R

ST

F

LO

O R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/8" = 1'-0"A1 DEMOLITION PLUMBING PLAN - FIRST FLOOR

SHEET NOTES

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

1. REMOVE ALL PLUMBING FIXTURES, PIPING,

ACCESSORIES, AND APPURTENANCES, EXCEPT

AS NOTED.

2. WASTE PIPING UNDER EXISTING PUMP PAD IN

PUMP ROOM CAN BE ABANDONED IN PLACE.

DEMOLITION NOTE:

1. THE INTENT OF THE PLUMBING DEMOLITION IS TO

REMOVE ALL FIXTURES, PIPING, AND ASSOCIATED

ACCESSORIES. PIPING REMOVED SHALL INCLUDE BUT

NOT LIMITED TO UNDERGROUND DWV, DCW, DHW, AND

DHWR AND ALL ABOVE GRADE PLUMBING PIPING.

SEE SHEET NOTE 2

EXST EMERGENCY

SHOWER TO REMAIN

B C D E F G

2.1

H

J

K

L

N

P

Q

SEE SHEET NOTE 1

M

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PD102

BLDG503A

D

EM

O

LI

TI

O

N P

L U M

BI

N

G P

L A N

S E

C O

N D

F

LO

O R

(T H

IR

D

T H

R U

F

IF

TH

F

L O O

R S

SI

M

I L

AR

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/8" = 1'-0"A1 DEMOLITION PLUMBING PLAN - SECOND FLOOR (THIRD THRU FIFTH FLOORS SIMILAR)

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

SHEET NOTES

1. REMOVE ALL PLUMBING FIXTURES, PIPING,

ACCESSORIES, AND APPURTENANCES, INCLUDING

PLUMBING RISERS.

B C D E F G

2.1

H

J

K

L

N

P

Q

SEE SHEET NOTE 1

M

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PD103

BLDG503A

D

EM

O

LI

T I O

N P

LU

M

B I N

G P

LA

N

SI

XT

H

F

LO

O R

(S

EV

E N

TH

F

LO

O R

S

IM

IL

AR

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/8" = 1'-0"A1 DEMOLITION PLUMBING PLAN - SIXTH FLOOR (SEVENTH FLOOR SIMILAR)

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

SHEET NOTES

1. REMOVE ALL PLUMBING FIXTURES, PIPING,

ACCESSORIES, AND APPURTENANCES, INCLUDING

PLUMBING RISERS.

UP

B C D E F G

2.1

H

J

K

L

N

P

Q

DEMOLISH EXISTING VTR, TYP

DEMOLISH EXISTING DHWR PIPING

M

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PD104

BLDG503A

D

EM

O

LI

TI

O

N P

L U M

BI

N

G P

LA

N

R

O O

F

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/8" = 1'-0"A1 DEMOLITION PLUMBING PLAN - ROOF

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

SHEET NOTES

1. REMOVE ALL PLUMBING FIXTURES, PIPING,

ACCESSORIES, AND APPURTENANCES.

B C D E F G

2.1

H

J

K

L

N

P

Q

PP401

A1

PP403

A1

PP402

A1

EXISTING

TRANSFORMER

BUILDING

EXISTING

MECHANICAL

YARD

SEE CIVIL FOR

CONTINUATION

SEE CIVIL FOR

CONTINUATION, TYP

ARMS VAULT

STAIR #1

SECURE RM

COMM STOR

104 NBC STOR

HALL

PLATOON C

107C PLATOON D

107D

PLATOON A

107A

PLATOON B

107B UNIT STORAGE

EXT WALKWAY

ELEC

TELCOMM

MECH ROOM

LOBBY

LOBBY

MAIL RM

PUMP RM

ELEC RM

EXT WALKWAY

STAIR #2

CONFERENCE RM

TRAINING RM

1SG

XO

CO

WOMEN

RECYCLE RM

MEN

JAN

COMMAND

RESTROOM

CORRIDOR

STORAGE

STORAGE

PP404

A1

PP405

A1

PP406

A1

DOMESTIC

WATER

SANITARY

SANITARY

DOMESTIC

WATER

SANITARY

DOMESTIC

WATER

ELEVATOR6'

0" T

YP

5'

0"

4' - 0"

8'

- 6

" T

YP

PP416

D7

AP

PR

O X.

2'

-0

6'-9"

APPROX.

6'-10"

APPROX.

'-1

0"

AP

PR

O X.

4'-10"

APPROX.

'-4

APPROX.

9'-5"

APPROX.

'-7

APPROX.

1'-8"

APPROX.

7'-

0"APPROX.

6' -4

AP

PR

O X.

'-4

AP

PR

O X.

9' -6

AP

PR

O X.

CENTERLINE

OF WALL

8'-5"

APPROX.

CENTERLINE

OF WALL

M

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP101

BLDG503A

N

EW

P

LU

M

BI

N G

P

LA

N

FI

R

S T F

LO

O

R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/8" = 1'-0"A1 NEW PLUMBING PLAN - FIRST FLOOR

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

NOTE: THE DIMENSIONS SHOWN ON THIS DRAWING ARE APPROXIMATE.

CONTRACTOR SHALL SUBMIT DIMENSIONED SHOP DRAWINGS

THAT ARE COORDINATED WITH CIVIL SITE CONTRACTOR AND

VERIFIED IN FIELD INVESTIGATIONS TO ELIMINATE ANY CONFLICTS

PRIOR TO AND DURING CONSTRUCTION.

W

D

D

A

B C D E F G

2.1

H

J

K

L

N

P

Q

PP407

A1

PP408

A1

PP409

A1

EXT CORRIDOR

MECH ROOM

LAUNDRY

CQ

UNISEX TOILET

TELCOMM

ELEC

BATH

STAIR #1

LOBBY

LIV/DIN/KIT

BEDROOM

EXT CORRIDOR

230 STAIR #2

PP410

A1

PP411

A1

PP412

A1

SANITARY

DOMESTIC

WATER SANITARY

DOMESTIC

WATER

SANITARY

DOMESTIC

WATER

KITCHEN

BATH

ELEVATOR

M

ROOM AROOM B

AC

CLO B

CLO A

AC

CLO A

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP102

BLDG503A

N

EW

P

LU

M B I

N G

P

LA

N

SE

C

O N

D F

LO

O

R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/8" = 1'-0"A1 NEW PLUMBING PLAN - SECOND FLOOR

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

W

D

D

A

B C D E F G

2.1

H

J

K

L

N

P

Q

PP413

A1

PP415

A1

PP414

A1

PP416

A1

SANITARY

DOMESTIC

WATER

SANITARY

DOMESTIC

WATER

M

STAIR #1

STAIR #2

EXT CORRIDOR

EXT CORRIDOR

ROOM AROOM B

BATH

KITCHEN

MECH ROOM

ELEC

TELCOMM

STORAGE

LAUNDRY

LOBBY

JAN

AC

CLO A

CLO B

BEDROOM

CLO A

LIV/DIN/KIT

AC

BATH

ELEVATOR

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP103

BLDG503A

N

EW

P

LU

M

BI

N G

P

LA

N

TH

I R

D F

L O O

R

FO

U

R

TH

T H R

U S

IX

TH

F

LO

O R

S

SI

M

IL

AR

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/8" = 1'-0"A1 NEW PLUMBING PLAN - THIRD FLOOR (FOURTH THRU SIXTH FLOORS SIMILAR)

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

W

D

D

A

B C D E F G

2.1

H

J

L

N

P

Q

STAIR #1

KITCHEN

MECH ROOM

BATH

ROOM B ROOM A

ELEC

TELCOMM

JAN

STORAGE

LAUNDRY

LOBBY

EXT CORRIDOR

STAIR #2

PP414

A6SANITARY DOMESTIC

WATER

ELEVATOR

KITCHEN

BATH

PP414

D6

SANITARY

DOMESTIC

WATER

NOTE:

SIXTH FLOOR SIMILAR, SEE D1/PP413 (SANITARY)

AND D1/PP414 (DOMESTIC WATER)

D6

PP413

PP413

A6

AC

CLO B CLO A

M

ROOM B

ROOM A

CLO A

CLO B

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP104

BLDG503A

N

EW

P

LU

M B I

N G

P

LA

N

SE

VE

N

TH

F

LO

O R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

1/8" = 1'-0"A1 NEW PLUMBING PLAN - SEVENTH FLOOR

NOTE: SEE A1/PP413 & A1/PP414 FOR THIRD

FLOOR TYPE T1 UNIT PLUMBING PLANS

(FOURTH THRU SIXTH FLOORS SIMILAR).

UP

B C D E F G

2.1

H

J

K

L

N

P

Q

DHWR, TYP

EXPANSION

LOOP (TYP.)

PIPE ANCHOR PIPE ANCHOR

PIPE ANCHOR

PIPE ANCHOR

PIPE GUIDE,

SEE DETAIL

A5/PP504

PIPE GUIDE,

SEE DETAIL

A5/PP504

DHWR FROM

BELOW, TYP

ELEVATOR

STORAGE

STAIR #2

2" VTR

2" VTR

4" VTR

2" VTR 2" VTR 2" VTR

2" VTR 2" VTR 2" VTR

4" VTR 4" VTR 4" VTR

4" VTR

4" VTR

4" VTR

4" VTR

2" VTR

2" VTR 2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

BALANCING VALVE AND

SHUT OFF VALVE AT

KITCHEN SINK RISER,

SEE A1/PP905, TYP

BALANCING VALVE AND

SHUT OFF VALVE AT

LAV & TUB/SHOWER RISER,

SEE A4/PP905, TYP

M

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP105

BLDG503A

N

EW

R O

O F

PL

U

M

BI

N G

P

LA

N

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/8" = 1'-0"A1 NEW ROOF PLUMBING PLAN

PLAN NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

SHEET NOTES

1. SEE ARCHITECTURAL DRAWINGS FOR VENT THRU

ROOF (VTR) & PIPE PENETRATIONS THRU ROOF DETAILS.

B C D

2.1

A1

PP

M

AT

C H

LI

N

E

EXISTING

TRANSFORMER

BUILDING

EXISTING

MECHANICAL

YARD

POC 4" SAN, PROVIDE

6X4 INTERFACE CONN

(COUPLING FOR CAST IRON

TO PVC), SEE CIVIL DWGS

FOR CONTINUATION

(SEE INVERT NOTE &

DETAIL E1/PP503)

ARMS VAULT

SECURE RM

COMM STOR

PLATOON A

107A

NBC STOR

HALL

PLATOON C

107C

PLATOON B

107B

EXT WALKWAY

131STAIR #1

UNIT STORAGE

PLATOON D

107D

4" ø

SA

N

4" ø

SA

N

4" FCO

4" FCO

4" S UP, SEE

PP407 FOR CONT

4" S UP, SEE

PP407 FOR CONT

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP401

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

S

AN

IT

A R

Y

PL

U M

BI

N

G P

L A N

FI

R S T

F

LO

O R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/4" = 1'-0"A1 PARTIAL ENLARGED SANITARY PLUMBING PLAN - FIRST FLOOR

PLAN NORTH

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

INVERT NOTE:

SANITARY PIPING EXITS THE BUILDING BELOW FOOTING.

SEE CIVIL FOR INVERT AND DETAIL

ELEVATION 5'-0" OUTSIDE THE BUILDING.

D E F G

2.1 H

J

K

L

M

AT

C H

LI

N

E

A1

PP

M

AT

C H

LI

N

E

A1

PP

EXT WALKWAY

PLATOON C

107C

PLATOON D

107D

UNIT STORAGE

PLATOON B

107B

MECH ROOM

ELEC

TELCOMM

JAN

WOMEN

MEN

P-2

P-2

P-5

P-6

P-7

P-1

P-1

P-1

FS

FS

P-5

2"ø V

2"ø SAN

2"ø SAN

4"ø SAN

2"ø V

2" ø

V

4" ø

SA

N

4"ø SAN

4"ø V4"ø V

4" ø

SA

N

4"ø SAN

2"ø SAN

4" ø

SA

N

4" ø

SA

N

4" ø

SA

N

2" ø

V

2" ø

V

4" ø

V

4"ø V

2"ø V

POC 4" SAN, PROVIDE

6X4 INTERFACE CONN

(COUPLING FOR CAST IRON

TO PVC), SEE CIVIL DWGS

FOR CONTINUATION

(SEE INVERT NOTE &

DETAIL E1/PP503)

POC 4" SAN, PROVIDE

6X4 INTERFACE CONN

(COUPLING FOR CAST IRON

TO PVC), SEE CIVIL DWGS

FOR CONTINUATION (SEE

INVERT NOTE & DETAIL

E1/PP503)

P-10

4" FCO

4" FCO

4" FCO

4" FCO

4" FCO

2" FD

2" FD

4" S UP, SEE

PP408 FOR CONT

4" ø

SA

N

M

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP402

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

S

AN

IT

A R

Y

PL

U M

BI

N

G P

L A N

FI

R S T

F

LO

O R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/4" = 1'-0"A1 PARTIAL ENLARGED SANITARY PLUMBING PLAN - FIRST FLOOR

PLAN NORTH

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

INVERT NOTE:

SANITARY PIPING EXITS THE BUILDING BELOW

FOOTING. SEE CIVIL FOR INVERT AND DETAIL

G

H J K L

N P Q

MATCHLINE/

A1

PP402 POC 4" SAN, PROVIDE

6X4 INTERFACE CONN

(COUPLING FOR CAST IRON

TO PVC), SEE CIVIL DWGS

FOR CONTINUATION

(SEE INVERT NOTE & DETAIL

E1/PP503)

MAIL RM

LOBBY

PARCEL SECURE

STO

117A

PUMP RM

ELEC RM

EXT WALKWAY

EXT WALKWAY

STAIR #2

CORRIDOR

XO

CO

1SG

TRAINING RM

CONFERENCE RM

STORAGE

STORAGE

WOMEN

TELCOMM

ELEC

MECH ROOM

MEN

JAN

RECYCLE RM

COMMAND

RESTROOM

P-7

P-1 P-2

P-2

P-5

P-1

P-1

P-2

P-2

P-6

P-6

P-1

FS

4" VENT UP

4" S UP, SEE

PP409 FOR

CONT

SP

4"ø

SAN

4"ø SAN 4"ø SAN

4"ø SAN 4"ø V 2"ø

SAN

4"ø V

4"ø SAN

4" ø

SA

N

4"ø

SAN

2"ø V

2"ø

SAN

4" ø

SA

N

4"ø SAN

2"ø

SAN

2"ø V

4"ø SAN

4"ø

SAN

2"ø V

4"ø SAN

4"ø

SAN

4"ø V

2"ø V4"ø SAN

2"ø SAN

2"ø V 4" ø

SA

N

4" ø

SA

N

4"ø SAN

ELEVATOR

IN EXST

SUMP PIT

P-10

P-5

2" FD

2" FD

2" FD

P-6

4" FCO

4" FCO

4" FCO

4" FCO

4" FCO

4" WCO

4" FCO 4" FCO

4" S UP, SEE

PP409 FOR CONT

4" S UP, SEE

PP409 FOR CONT

4" S UP, SEE

PP409 FOR CONT

4" S UP, SEE

PP409 FOR CONT

FS

P-12

LOBBY

P-9

4" FCO

FS

4" ø

SA

N

4" COTG2" FM UP ALONG

PIT WALL, COORD

W/ ELEV EQUIP

2" FORCE MAIN (FM),

TERMINATE AT FLR

SINK

M

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP403

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

S

AN

IT

A R

Y

PL

U M

BI

N

G P

L A N

FI

R S T

F

LO

O R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/4" = 1'-0"A1 PARTIAL ENLARGED SANITARY PLUMBING PLAN - FIRST FLOOR

PLAN NORTH

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

INVERT NOTE:

SANITARY PIPING EXITS THE BUILDING BELOW

FOOTING. SEE CIVIL FOR INVERT AND DETAIL

B C D

2.1

A1

PP

M

AT

C H

LI

N

E

EXISTING

TRANSFORMER

BUILDING

EXISTING

MECHANICAL

YARD

P-13

EXST

DESUPERHEATER

ABOVE

HI-LOW

MIXING VALVE

ARMS VAULT

SECURE RM

COMM STOR

PLATOON A

107A

NBC STOR

HALL

PLATOON C

107C

PLATOON B

107B

EXT WALKWAY

ST

EXST

CHILLER

PIPING BELOW

GRADE, TYP

DCW & DHW

SOV IN

PLUMBING

VALVE BOX,

TYP

STAIR #1

UNIT STORAGE

PLATOON D

107D

1 1/2"ø DHWR2 1/2"ø DHW2 1/2"ø DCW

1 1/2"ø DHWR

2 1/2"ø DHW2 1/2"ø DCW

1 1/2"ø DHWR

2"ø DHW2 1/2"ø DCW

2" ø

D C

W

1/

4" ø

D H

W

2"ø DHW2 1/2"ø DCW

2" ø

D C

W

1/

4" ø

D H

W

1/

4" ø

D H

W

3/4"ø DCW

3/ 4" ø D

C W

3/ 4" ø D

C W

1/

2" ø

D C

W

1/

2" ø

D H

W

1/

2" ø

D H

W R

1/

2" ø

D H

W

1/

2" ø

D H

W R

1/

2" ø

D C

W

1/

2" ø

D H

W

1/

2" ø

D H

W

1 1/2"ø DHW

1/

2" ø

D C

W

1/

2" ø

D H

W

1 1/2"ø DHWR

2"ø DCW

GWH

GWH

HWRCP

BELOW

2" ø

D C

W

P-13

(TYP. OF 3)

1"ø NG

3/ 4" ø N

G

3/4"ø NG

3/4"ø NG

1" GAS, COORD. CONN. TO

METER / REGULATOR W/

HAWAII GAS

P-13

P-13

1 1/2" DHWR UP

2 1/2" DCW UP

2 1/2" DHW UP

3/4" DCW DN

BELOW GRADE 3/4" DCW BELOW GRADE

2" DCW,

1 1/4" DHW,

2" DCW, &

1 1/4" DHW

UP

2" DCW &

1 1/4" DHW UP

1" T&P RELIEF DRAIN,

TERMINATE 6" ABV. PAD

1" T&P RELIEF

VALVE

6'

0" T

YP

23 GAL. EXPANSION

TANK, INSTALL PER

MANUFACTURER'S

RECOMMENDATIONS

2 1/2"ø DCW

3/ 4" ø D

C W

SOV ON

VERTICAL

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP404

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

D O

M

ES

TI

C

W

AT

ER

P

LU

M

BI

N

G

PL

AN

F I R

ST

F

LO

O

R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/4" = 1'-0"A1 PARTIAL ENLARGED DOMESTIC WATER PLUMBING PLAN - FIRST FLOOR

PLAN NORTH

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

D E F G

2.1

K

L

M

AT

C H

LI

N

E

A1

PP

M

AT

C H

LI

N

E

A1

PP

P-13

EXT WALKWAY

PLATOON C

107C

PLATOON D

107D

UNIT STORAGE

PLATOON B

107B

MECH ROOM

ELEC

TELCOMM

JAN

WOMEN

MEN

P-2

P-2

P-5

P-6

P-7

P-1

P-1

P-1

DCW & DHW

SOV IN PLUMBING

VALVE BOX, TYP

PIPING BELOW

GRADE

P-5

1 1/2"ø DHWR 2"ø DHW

2 1/2"ø DCW

1 1/2"ø DHWR 2"ø DHW

2 1/2"ø DCW

2"ø D

HW

3"ø D

CW

1 1/2"ø DHWR 2"ø DHW

2"ø DCW

1"ø DHW

2"ø DCW

2" ø

D C

W

3/ 4" ø D

H W

3/4"ø DHW

1 1/2"ø DCW

3/ 4" ø D

H W

2" ø

D C

W

3/ 4" ø D

H W

3/4"ø DHW

1 1/2"ø DCW3/ 4" ø D

C W

3/ 4" ø D

H W

1 1/2"ø DCW

3/4"ø DHW

3/ 4" ø D

C W

2" ø

D C

W

1/

4" ø

D H

W

2" ø

D C

W

1/

4" ø

D H

W

3/ 4" ø D

C W

2" ø

D C

W

1/

4" ø

D H

W

1/

4" ø

D H

W

2" ø

D C

W

3/4"ø DCW

2"ø DHW

3"ø DCW 2 1/2"ø DCW

P-13

2" DCW &

1 1/4" DHW UP

1" ø

D H

W R

1" ø

D H

W

2" ø

D C

W

1" ø

D H

W

2" ø

D C

W

2" ø

D H

W

1/

2" ø

D H

W R

SEE MH405

FOR CONT.

5'

0"

6'

0" T

YP

DCW & DHW

SOV IN

PLUMBING

VALVE BOX

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP405

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

D O

M

ES

TI

C

W

AT

ER

P

LU

M

BI

N

G

PL

AN

F I R

ST

F

LO

O

R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/4" = 1'-0"A1 PARTIAL ENLARGED DOMESTIC WATER PLUMBING PLAN - FIRST FLOOR

PLAN NORTH

G

H J K L

N P Q

MATCHLINE/

A1

PP405

POC 4" DCW

MAIN

P-13

MAIL RM

LOBBY

PARCEL SECURE

STO

117A

PUMP RM

ELEC RM

EXT WALKWAY

EXT WALKWAY

STAIR #2

CORRIDOR

XO

CO

1SG

TRAINING RM

CONFERENCE RM

STORAGE

STORAGE

TELCOMM

ELEC

MECH ROOM

MEN

JAN

RECYCLE RM

COMMAND

RESTROOM

WOMEN

P-7

P-1 P-2

P-2

P-5

P-1

P-1

P-2

P-2

P-6

P-6

P-1

PIPING BELOW

GRADE, TYP

DCW & DHW

SOV IN PLUMBING

VALVE BOX, TYP

2" ADVANCE WATER

METER, SEE SPEC

SECTION 33 11 00

PRV

2" DCW & DHW UP

1 1/4" DHWR UP

1 1 /2" ø D

HWR

2"ø D

HW

3"ø D

CW

2" ø

D H

W

3" ø

D C

W

4" ø

D C

W

2"ø DCW

1"ø DHW

2"ø DCW

2"ø DHW

1 1/2"ø DHWR 2"ø DHW 2"ø DCW

1"ø DHW2"ø DCW

1 1/2"ø DHWR

1 1 /2" ø D

CW

3/4 "ø D

HW

3/4"ø DHW

3/4"ø DCW

3/4"ø DHW

2"ø DCW

3/4"ø DHW

1 1/2"ø DCW

3/4"ø DHW

3/4"ø DCW

1/

2" ø

D C

W

1/ 2" ø D

C W

3/ 4" ø D

H W

3/ 4" ø D

H W

2" ø

D C

W

1/

4" ø

D H

W

1/2"ø DCW

1/2"ø DHW

2" ø

D C

W

1/

4" ø

D H

W

2" ø

D C

W

1/

4" ø

D H

W

2 1/2"ø DCW

1 1/2"ø DHW

2 1/2"ø DCW

1 1/2"ø DHW

2"ø DCW

1 1/4"ø DHW

2" ø

D C

W

1/

4" ø

D H

W

2" ø

D C

W

1/

4" ø

D H

W

3/ 4" ø D

C W

3/4"ø DCW

3/ 4" ø D

C W

3/4"ø DCW

P-5

3/4"ø DCW

ELEVATOR

P-12

P-

P-9

P-13

(TYP. OF 3)

P-10

P-13

(TYP. OF 3)

P-13

P-13

P-12

2" DCW &

1" DHW UP,

SERVING FIRST

FLOOR FIXTURES

P-12

2" DCW &

1 1/4" DHW

UP

2" DCW &

1 1/4" DHW

UP

2" DCW &

1 1/4" DHW

UP

2" ø

D C

W

1/

4" ø

D H

W

LOBBY

4' - 0"

8'

6" T

YP

SEE PP101

FOR CONT. SEE PP101

FOR CONT.

M

SOV ON

VERTICAL

SOV ON

VERTICAL

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP406

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

D O

M

ES

TI

C

W

AT

ER

P

LU

M

BI

N

G

PL

AN

F I R

ST

F

LO

O

R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/4" = 1'-0"A1 PARTIAL ENLARGED DOMESTIC WATER PLUMBING PLAN - FIRST FLOOR

PLAN NORTH

B C D

2.1

EXT CORRIDOR

KITCHEN

BATH

ROOM B

ROOM A

CLO B

AC

CLO A

CLO B

ROOM B

ROOM A

ROOM B

ROOM A

AC

CLO B

CLO A

BATH

KITCHEN

STAIR #1

AC

P-4 P-4

P-3

P-1 P-4

P-2

M

AT

C H

LI

N

E

A1

PP

2" S RISER (TYP)

2" V RISER (TYP)

4" S RISER (TYP)

3" V RISER (TYP)

2" S RISER (TYP)2" V RISER

(TYP)

4" S DOWN4" S DOWN

4" S BELOW

SLAB

4" S BELOW

SLAB

P-3

P-1

P-3

P-1 P-4

BATH

CLO A

KITCHEN

ROOM B

KITCHEN

2"ø SAN

4" ø

SA

N

4"ø SAN

4" ø

SA

N

2"ø SAN

4"ø SAN

2"ø SAN

2"ø SAN

4"ø SAN

4" ø

SA

N

CO

CO CO

(TYP)

TYPE T1 UNIT

P-2 P-2

AC

CLO B

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP407

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

S

AN

IT

A R

Y

PL

U M

BI

N

G P

L A N

SE

C O

N D

F L O

O R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

PLAN NORTH

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

1/4" = 1'-0"A1 PARTIAL ENLARGED SANITARY PLUMBING PLAN - SECOND FLOOR

NOTES:

1. RISER STACK CALLOUTS TYPICAL FOR UNITS.

2. SEE PIPING DIAGRAMS FOR CLARITY.

W

D

D

D E F G

2.1

L

EXT CORRIDOR

AC

ROOM B ROOM A

CLO A

KITCHEN BATH

MECH ROOM

ELEC

TELCOMM

UNISEX TOILET

LOBBY

CQ

LAUNDRY

ROOM B

P-4 P-1

P-2 P-3 P-9A

M

AT

C H

LI

N

E

M

AT

C H

LI

N

E

A1

PP

A1

PP

4" S BELOW

SLAB

4" S DN

2"ø SAN

4"ø SAN

2"ø SAN

4" ø

SA

N 2" ø

SA

N

3"ø SAN

3"ø SAN

3"ø SAN

2"ø SAN 2"ø SAN

2" ø

V

2"ø V2"ø V

2" S RISER

2" V RISER

4" S RISER

3" V RISER

CLO B

P-1A

CO

(TYP)

TYPE T1 UNIT

2" S RISER2" V RISER

4" ø

SA

N

2"ø

SAN

2"ø SAN

P-11CLO B

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP408

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

S

AN

IT

A R

Y

PL

U M

BI

N

G P

L A N

SE

C O

N D

F L O

O R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/4" = 1'-0"A1 PARTIAL ENLARGED SANITARY PLUMBING PLAN - SECOND FLOOR

NOTES:

1. SEE SHEET PP404 FOR TYPICAL RISER CALLOUTS.

2. SEE PIPING DIAGRAMS FOR CLARITY.

PLAN NORTH

W D

D

F

G

2.1

H J K L

N P Q

BEDROOM

LIV/DIN/KIT

LOBBY

TELCOMM

ELEC

MECH ROOM

CQ

UNISEX TOILET

LAUNDRY

CLO B

AC

EXT CORRIDOR

STAIR #2

BATH

AC

CLO B

CLO A

ROOM B ROOM A ROOM B ROOM A

CLO A

KITCHEN

BATH

AC

CLO B

ROOM B ROOM A

CLO A

BATH

P-4

P-2

P-3

P-1 P-4

P-2 P-3

P-1 P-4 P-1

P-2

P-3

MATCHLINE/

A1

PP408

4" S RISER

4" V RISER

4" W DN

4" S BELOW

SLAB

4" S DN

4" S BELOW

SLAB

4" S DN

4" S BELOW

SLAB

4" S DN

KITCHEN KITCHEN

2"ø SAN

3"ø

SAN

4"ø SAN

2"ø SAN

2"ø SAN

2"ø V

2"ø V 2"ø SAN

4"ø SAN

4" ø

SA

N

2"ø SAN

4"ø SAN

2"ø SAN

4" ø

SA

N

4" ø

SA

N

2"ø SAN

4"ø SAN2"ø SAN

ELEVATOR

BATH

CLO A

AC

2" FD

TYPE T2 UNIT PLAN

THIRD THRU FIFTH

FLOORS SIMILAR

P-2 P-1 P-3

P-4

4" S RISER

3" V RISER

P-9A

P-1A

(TYP)

TYPE T1 UNIT

2" S RISER (TYP)2" V RISER

(TYP)

CO CO CO

2"ø SAN

P-8

FD W/ TRAP PRIMER,

SEE DET. A6/PP501

M

P-11

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

D

IS

SU

E D

AT

E :

C O

N

TR

AC

T

N O

SO

L I

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

FY

O M

A R

E P

AI

R B

U

IL

D

IN

G

A

PP409

BLDG503A

PA

R

TI

AL

E N

LA

R

G

ED

S

AN

IT

A R

Y

PL

U M

BI

N

G P

L A N

SE

C O

N D

F L O

O R

H N

O L U

LU

D

IS

TR

IC

T

FO

R

T

SH

AF

TE

R , H

I 9

-5

R

EG

IO

N

AL

E

N G

IN

EE

R

IN

G C

EN

TE

R H

O N

O

LU

LU

D

IS

TR

IC

T

H O

N O

LU

LU

, H I

D N

ER KAKM

JU

N

DESIGN COMPLETE SUBMITTAL

FO

R

T

SH

AF

TE

R , O

A H U

, H A W

AI

I

1/4" = 1'-0"A1 PARTIAL ENLARGED SANITARY PLUMBING PLAN - SECOND FLOOR

NOTES:

1. SEE…