This announcement constitutes a solicitation for a design-bid-build construction project to repair Building 502 located at Fort Shafter, Hawaii. The project scope includes removing two existing living units per floor to provide stacked utility cores with mechanical, electrical, and telecommunications rooms; common laundries on all barracks floors; renovating existing barracks modules and interior configurations to meet Army standards; individual bathrooms and lavatories; replacing interior finishes; removing two units per floor from the sixth through eighth floors to provide dayroom support space. The total project value is estimated between $25-50 million. The Army Corps of Engineers, Honolulu District will evaluate proposals using lowest price technically acceptable procedures, considering experience, past performance, technical approach, and price. The base period of performance is 840 calendar days. An organized site visit will be held on August 13, 2020 at 10:00 AM Hawaii Standard Time.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY20 REPAIR BUILDING 502, FORT SHAFTER, OAHU, HAWAII PN20fs03

If the construction dewatering is noted or suspected of being contaminated, it may only be released to the storm drain system if the discharge is specifically permitted. Obtain authorization for any contaminated groundwater release in advance from the Installation Environmental Officer and the Federal or State authority, as applicable. Discharge of hazardous substances will not be permitted under any circumstances.

3.4 PROTECTION OF CULTURAL RESOURCES

3.4.1 Archaeological Resources

If, during excavation or other construction activities, any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, activities that may damage or alter such resources will be suspended. Resources covered by this paragraph include, but are not limited to: any human skeletal remains or burials; artifacts;

shell, midden, bone, charcoal, or other deposits; rock or coral alignments, pavings, wall, or other constructed features; and any indication of agricultural or other human activities. Upon such discovery or find, immediately notify the Contracting Officer so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. Cease all activities that may result in impact to or the destruction of these resources. Secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources. The Government retains ownership and control over archaeological resources.

3.4.2 Historical Resources

Existing historical resources within the work area are shown on the drawings. Protect these resources and be responsible for their preservation during the life of the Contract.

3.5 AIR RESOURCES

Equipment operation, activities, or processes will be in accordance with 40 CFR 64 and State air emission and performance laws and standards.

3.5.1 Oil or Dual-fuel Boilers and Furnaces

Provide product data and details for new, replacement, or relocated fuel fired boilers, heaters, or furnaces to the Installation Environmental Office (Air Program Manager) through the Contracting Officer. Data to be reported include: equipment purpose (water heater, building heat, process), manufacturer, model number, serial number, fuel type (oil type, gas type) size (MMBTU heat input). Provide in accordance with paragraph

PRECONSTRUCTION AIR PERMITS.

3.4.4 Burning

Burning is prohibited on Government premises.

3.5.2 Class I and II ODS Prohibition

Class I and II ODS are Government property and must be returned to the Government for appropriate management. Coordinate with the Installation Environmental Office to determine the appropriate location for turn in of all reclaimed refrigerant.