This solicitation requests proposals for the Repair Building 502 project at Fort Shafter, Oahu, Hawaii. The U.S. Army Corps of Engineers, Honolulu District is seeking to award a firm-fixed price construction contract to renovate approximately 55,663 square feet of an existing eight-story barracks building. Renovations include removing two living units per floor to create new mechanical and electrical rooms, adding common laundries and upgrading barracks rooms and bathrooms. Individual components such as kitchen appliances, cabinets and plumbing fixtures will be replaced. Exterior work is also required. The performance period is 840 calendar days. The project value is estimated between $25-50 million. An organized site visit will be held on August 13, 2020. Proposals will be evaluated on experience, past performance, technical approach and price under the lowest price technically acceptable source selection method. Award is expected to the offeror providing the best value. Offerors must register in the System for Award Management to be considered. Subcontracting goals apply for small, disadvantaged, women-owned and veteran-owned businesses.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Repair Building 502, Fort Shafter, Oahu, Haw aii
See Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A20R0016
X 9B. DATED (SEE ITEM 11)
06-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
Am-0004
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Aug-2020
CODE
CEPOH - CONTRACTING DIVISION HAWAII
USACE, HONLLULU DISTRICT BLDG
FT. SHAFTER HI 96858-5440
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128A20R0016 Am-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0004)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in strikethrough.
Section 01 57 19 – Page 23
b. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Attachment B – Requests for Information (#2-16)
c. REPLACED SECTIONS. The following sections have been deleted from the solicitation in its entirety and replaced with new sections. Changes are annotated in Bold lettering.
Section 00 72 00, Attachment A – Davis Bacon Wage Rates
2. CHANGES TO DRAWINGS.
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued
Sheet ID Mark Revision Date S-401 4 08/25/20 S-503 4 08/25/20 S-504 4 08/25/20 S-510 4 08/25/20
AD101 4 08/25/20
A-101 4 08/25/20 A-402 4 08/25/20 A-403 4 08/25/20 A-610 4 08/25/20
AF-602 4 08/25/20
3. The proposal due date and time remain unchanged.
Repair Building 502 Fort Shafter, Oahu, Hawaii
RFI # Reference Question Government Response 2 S-001/S504 S-001, foundation note 1, indicates a soil investigation report has been completed by Pacific Geotechnical Engineers (June 20, 2020). S-504, micropile note 1, indicates a geotechnical report by Pacific Geotechnical Engineers (June 15, 2020). Both reports are not included with the bid documents. Can these reports or the most updated report (if contain same but updated info) be provided to bidders for review?
The Soil Investigation Report and Geotechnical Report will not be provided.
3 00 21 16 Paragraph 4.1.2.a. of Section 00 22 16 requires submitted projects to be substantially complete within six (6) years. Can this submission requirement be extended to seven (7) years?
See Revised Section 00 22 16, Per Am-0003.
4 00 21 16 Paragraph 4.1.1.c. of Section 00 22 16 lists "renovation of multi-story barracks/multi-unit housing type projects" as the sole criteria to prove similarity in scope and complexity of work. The Government's submission requirements for project experience are overly restrictive. The contractor project experience can be showcased in projects incorporating new construction as well as renovation work. If the Government's goal is to obtain the best overall value to the Government in terms of price and quality housing construction, will the Government consider extending the references requirement for relevant construction experience as noted below to allow bid participation by all qualified contractors, increasing the number of competitive bid offers, and ensuring full and open competition in compliance with 41 U.S.C. Section 253(a)(1)(A)? It is requested that the criteria be modified to provide the following: Renovation of multi-story multi-unit concrete building (minimum 1 contract) and Construction or renovation of barracks/multi-unit housing type project (minimum 1 contract)
See Revised Section 00 22 16, Per Am-0003.
5 01 57 19 Section 01 57 19, paragraph 3.4 of the specifications indicates that existing historical resources within the work area are shown on the drawings and shall be protected during the life of the Contract. It doesn't appear there are any historical resources explicitly noted on the drawings.
Please advise if there are any historical resources that must be protected during the execution of this project. If there are historical resources, please list or indicate on the drawings.
See Revised Section 01 57 19, Paragraph 3.4, per Am-0004. Sub- Paragraph 3.4.2 has been deleted.
6 AF602, A-403 The Room Finish Schedule on AF602 notes the flooring of Rooms 213 up to 813 (Janitor) as EP (Epoxy Floor Coating). The Core Area enlarged floor plan on D10/A-403 shows this room with CT – 1 (Porcelain Tile) Flooring. Please confirm this room is to have EP flooring.
See Revised Drawing AF602, per Am-0004.
Section 00 60 00, Attachment B (Am‐0004)
7 AF602, A-403 The Room Finish Schedule on AF602 notes the flooring of Rooms 215 up to 815 (Laundry) as CS (Concrete Sealer with Grip Additive). The Core Area enlarged floor plan on D10/A-403 shows this room with CT – 1 (Porcelain Tile) Flooring. Please confirm this room is to have CS flooring.
See Revised Drawing AF602, per Am-0004.
8 S-101 Please provide thickness of concrete pads at Laundry Room and Mechanical Room as information is not provided on Architectural Plan as noted.
See Revised Drawings A-402, A-403, per Am-0004.
9 S-509 Detail D2/S-509 does not depict the grade beam (A1/S-505) continuing under the CMU section of wall with a thickened slab. However, per S-101, micropiles continue under the CMU wall areas along column line 2.
Please confirm the grade beam runs continuous along column line 2.
See Revised Drawing S-503, per Am-0004.
10 AF601 Please confirm locations for Paint Types PT – 1X, PT – 2X, PT – 3X, PT – 4X.
See Drawing AF601, per the original solicitation.
PT-1X: Field paint for all exterior wall surfaces unless noted otherwise PT-2X: Accent Paint at first floor wainscoat base, all window sils, and concrete eyebrows PT-3X: All exterior ceilings PT-4X: All exterior metal guardrails, and ladders
11 A-102 General Key Note G5 requires "New Concrete Topping on Existing Slab."
Please confirm the concrete topping is to be provided per Section 03 54 16 Hydraulic Cement Underlayment.
See Revised Drawing S-510, Detail K12, per Am-0004.
12 07 27 26 Section 07 27 26 paragraph 1.9.2 requires the use of a fluid-applied air barrier installer certified by ABAA. Per the ABAA website, there are zero
(0) qualified contractors in the state of Hawaii. Please delete this requirement as it excludes local participation on the project.
The contractor will be responsible for complying with the requirements in Section 07 27 26, per the original solicitation.
13 A-421 Detail M1/A-421 elevation A1 calls out "Security Bars". Please provide details for security bars.
See Drawing A-613, per the original solicitation, for security bar details.
14 A-610 08 81 00
Window W1 is required to be 20 min rated in compliance with the Life Safety drawings as well as t he remarks on the Window Schedule.
Glazing type per the schedule is listed as GL-3 which is frosted 5/16" fire rated glass per Section 08 81 00 paragraph 2.1.2.1. However, the window is also an exterior window which requires an insulated glazing unit per details D9 & J9/A-611, also referenced in the window schedule. Please clarify the required glazing requirements for this window type.
See Revised Drawing A-610, per Am-0004.
15 FX-101 to FX-104 Please clarify if fire sprinklers are required at the exterior corridors. No sprinklers are required for exterior exit corridors.
16 S-504 Micropile Note 16 states to reference a table on drawing S-504 for minimum tip elevations for bidding purposes. Please provide the referenced table or provide length for bidding purposes.
See Revised Drawing S-504, Micropile Note 16, per Am-0004.
"General Decision Number: HI20200001 08/21/2020
Superseded General Decision Number: HI20190001
State: Hawaii
Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential
Counties: Hawaii Statewide.
BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION
PROJECTS (consisting of single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS AND DREDGING
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above‐mentioned types of contracts entered into by the federal government that are subject to the Davis‐Bacon Act itself, but it does not apply to contracts subject only to the Davis‐Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)‐(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/31/2020 2 02/07/2020 3 02/21/2020 4 03/06/2020 5 03/20/2020
Section 00 72 00, Attachment A - Page 1
6 04/03/2020 7 07/24/2020 8 08/21/2020
ASBE0132‐001 08/31/2015
Rates Fringes
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 39.65 23.50
BOIL0627‐005 01/01/2013
Rates Fringes
BOILERMAKER......................$ 35.20 27.35
BRHI0001‐001 01/01/2019
Rates Fringes
BRICKLAYER
Bricklayers and Stonemasons.$ 43.66 24.32 Pointers, Caulkers and Weatherproofers.............$ 43.60 24.32
BRHI0001‐002 09/04/2018
Rates Fringes
Tile, Marble & Terrazzo Worker Terrazzo Base Grinders......$ 39.89 28.11 Terrazzo Floor Grinders and Tenders.................$ 38.34 28.11 Tile, Marble and Terrazzo Workers.....................$ 41.70 28.11
CARP0745‐001 09/02/2019
Section 00 72 00, Attachment A - Page 2
Rates Fringes
Carpenters:
Carpenters; Hardwood Floor Layers; Patent Scaffold Erectors (14 ft. and over); Piledrivers;
Pneumatic Nailers; Wood Shinglers and Transit and/or Layout Man...........$ 49.95 22.40 Millwrights and Machine Erectors....................$ 50.20 22.40 Power Saw Operators (2 h.p. and over)..............$ 50.10 22.40
CARP0745‐002 09/02/2019
Rates Fringes
Drywall and Acoustical Workers and Lathers..............$ 50.20 22.40
ELEC1186‐001 02/23/2020
Rates Fringes
Electricians:
Cable Splicers..............$ 56.43 29.74 Electricians................$ 51.30 28.36 Telecommunication worker....$ 31.69 12.94
ELEC1186‐002 02/23/2020
Rates Fringes
Line Construction:
Cable Splicers..............$ 56.43 29.74 Groundmen/Truck Drivers.....$ 38.48 24.88 Heavy Equipment Operators...$ 46.17 26.96 Linemen.....................$ 51.30 28.36 Telecommunication worker....$ 31.69 12.49
ELEV0126‐001 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 61.14 34.765
a. VACATION: Employer contributes 8% of basic hourly rate for 5 years service and 6% of basic hourly rate for 6 months to
Section 00 72 00, Attachment A - Page 3
5 years service as vacation pay credit.
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
ENGI0003‐002 09/03/2018
Rates Fringes
Diver (Aqua Lung) (Scuba)) Diver (Aqua Lung) (Scuba) (over a depth of 30 feet)...$ 66.00 31.26 Diver (Aqua Lung) (Scuba) (up to a depth of 30 feet)..$ 56.63 31.26 Stand‐by Diver (Aqua Lung) (Scuba)....................$ 47.25 31.26 Diver (Other than Aqua Lung) Diver (Other than Aqua Lung).......................$ 66.00 31.26 Diver Tender (Other than Aqua Lung)..................$ 44.22 31.26 Stand‐by Diver (Other than Aqua Lung)..................$ 47.25 31.26 Helicopter Work Airborne Hoist Operator for Helicopter..............$ 45.80 31.26 Co‐Pilot of Helicopter......$ 45.98 31.26 Pilot of Helicopter.........$ 46.11 31.26 Power equipment operator ‐ tunnel work
GROUP 1....................$ 42.24 31.26
GROUP 2....................$ 42.35 31.26
GROUP 3....................$ 42.52 31.26
GROUP 4....................$ 42.79 31.26
GROUP 5....................$ 43.10 31.26
GROUP 6....................$ 43.75 31.26
GROUP 7....................$ 44.07 31.26
GROUP 8....................$ 44.18 31.26
GROUP 9....................$ 44.29 31.26
GROUP 9A...................$ 44.52 31.26
GROUP 10....................$ 44.58 31.26
GROUP 10A...................$ 44.73 31.26
GROUP 11....................$ 44.88 31.26
GROUP 12....................$ 45.24 31.26
GROUP 12A...................$ 45.60 31.26
Power equipment operators:
GROUP 1....................$ 41.94 31.26
GROUP 2....................$ 42.05 31.26
Section 00 72 00, Attachment A - Page 4
GROUP 3....................$ 42.22 31.26
GROUP 4....................$ 42.49 31.26
GROUP 5....................$ 42.80 31.26
GROUP 6....................$ 43.45 31.26
GROUP 7....................$ 43.77 31.26
GROUP 8....................$ 43.88 31.26
GROUP 9....................$ 43.99 31.26
GROUP 9A...................$ 44.22 31.26
GROUP 10....................$ 44.28 31.26
GROUP 10A...................$ 44.43 31.26
GROUP 11....................$ 44.58 31.26
GROUP 12....................$ 44.94 31.26
GROUP 12A...................$ 45.30 31.26
GROUP 13....................$ 42.22 31.26
GROUP 13A...................$ 42.49 31.26
GROUP 13B...................$ 42.80 31.26
GROUP 13C...................$ 43.45 31.26
GROUP 13D...................$ 43.77 31.26
GROUP 13E...................$ 43.88 31.26
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Fork Lift (up to and including 10 tons); Partsman (heavy duty repair shop parts room when needed).
GROUP 2: Conveyor Operator (Handling building material);
Hydraulic Monitor; Mixer Box Operator (Concrete Plant).
GROUP 3: Brakeman; Deckhand; Fireman; Oiler;
Oiler/Gradechecker; Signalman; Switchman; Highline Cableway Signalman; Bargeman; Bunkerman; Concrete Curing Machine (self‐propelled, automatically applied unit on streets, highways, airports and canals); Leveeman; Roller (5 tons and under); Tugger Hoist.
GROUP 4: Boom Truck or dual purpose ""A"" Frame Truck (5 tons or less); Concrete Placing Boom (Building Construction);
Dinky Operator; Elevator Operator; Hoist and/or Winch (one drum); Straddle Truck (Ross Carrier, Hyster and similar).
GROUP 5: Asphalt Plant Fireman; Compressors, Pumps, Generators and Welding Machines (""Bank"" of 9 or more, individually or collectively); Concrete Pumps or Pumpcrete Guns; Lubrication and Service Engineer (Grease Rack);
Screedman.
GROUP 6: Boom Truck or Dual Purpose ""A""Frame Truck (over 5 tons); Combination Loader/Backhoe (up to and including 3/4
cu. yd.); Concrete Batch Plants (wet or dry); Concrete Cutter, Groover and/or Grinder (self‐propelled unit on
Section 00 72 00, Attachment A - Page 5 streets, highways, airports, and canals); Conveyor or Concrete Pump (Truck or Equipment Mounted); Drilling Machinery (not to apply to waterliners, wagon drills or jack hammers); Fork Lift (over 10 tons); Loader (up to and including 3 and 1/2 cu. yds); Lull High Lift (under 40 feet); Lubrication and Service Engineer (Mobile); Maginnis Internal Full Slab Vibrator (on airports, highways, canals and warehouses); Man or Material Hoist; Mechanical Concrete Finisher (Large Clary, Johnson Bidwell, Bridge Deck and similar); Mobile Truck Crane Driver; Portable Shotblast Concrete Cleaning Machine; Portable Boring Machine (under streets, highways, etc.); Portable Crusher; Power Jumbo Operator (setting slip forms, etc., in tunnels); Rollers (over 5 tons); Self‐propelled Compactor (single engine);
Self‐propelled Pavement Breaker; Skidsteer Loader with attachments; Slip Form Pumps (Power driven by hydraulic, electric, air, gas, etc., lifting device for concrete forms); Small Rubber Tired Tractors; Trencher (up to and including 6 feet); Underbridge Personnel Aerial Platform (50 feet of platform or less).
GROUP 7: Crusher Plant Engineer, Dozer (D‐4, Case 450, John Deere 450, and similar); Dual Drum Mixer, Extend Lift;
Hoist and/or Winch (2 drums); Loader (over 3 and 1/2 cu.
yds. up to and including 6 yards.); Mechanical Finisher or Spreader Machine (asphalt), (Barber Greene and similar) (Screedman required); Mine or Shaft Hoist; Mobile Concrete Mixer (over 5 tons); Pipe Bending Machine (pipelines only);
Pipe Cleaning Machine (tractor propelled and supported);
Pipe Wrapping Machine (tractor propelled and supported);
Roller Operator (Asphalt); Self‐Propelled Elevating Grade Plane; Slusher Operator; Tractor (with boom) (D‐6, or similar); Trencher (over 6 feet and less than 200 h.p.);
Water Tanker (pulled by Euclids, T‐Pulls, DW‐10, 20 or 21, or similar); Winchman (Stern Winch on Dredge).
GROUP 8: Asphalt Plant Operator; Barge Mate (Seagoing);
Cast‐in‐Place Pipe Laying Machine; Concrete Batch Plant (multiple units); Conveyor Operator (tunnel); Deckmate;
Dozer (D‐6 and similar); Finishing Machine Operator (airports and highways); Gradesetter; Kolman Loader (and similar); Mucking Machine (Crawler‐type); Mucking Machine (Conveyor‐type); No‐Joint Pipe Laying Machine; Portable Crushing and Screening Plant; Power Blade Operator (under 12); Saurman Type Dragline (up to and including 5 yds.);
Stationary Pipe Wrapping, Cleaning and Bending Machine;
Surface Heater and Planer Operator, Tractor (D‐6 and similar); Tri‐Batch Paver; Tunnel Badger; Tunnel Mole and/or Boring Machine Operator Underbridge Personnel Aerial Platform (over 50 feet of platform).
Section 00 72 00, Attachment A - Page 6
GROUP 9: Combination Mixer and Compressor (gunite); Do‐Mor Loaderand Adams Elegrader; Dozer (D‐7 or equal); Wheel and/or Ladder Trencher (over 6 feet and 200 to 749 h.p.).
GROUP 9A: Dozer (D‐8 and similar); Gradesetter (when required by the Contractor to work from drawings, plans or specifications without the direct supervision of a foreman or superintendent); Push Cat; Scrapers (up to and including 20 cu. yds); Self‐propelled Compactor with Dozer;
Self‐Propelled, Rubber‐Tired Earthmoving Equipment (up to and including 20 cu. yds) (621 Band and similar); Sheep's Foot; Tractor (D‐8 and similar); Tractors with boom (larger than D‐6, and similar).
GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Repairman or Welder; Hoist and/or Winch (3 drums); Hydraulic Skooper (Koehring and similar); Loader (over 6 cu. yds. up to and including 12 cu. yds.); Saurman type Dragline (over 5 cu.
yds.); Self‐propelled, rubber‐tired Earthmoving Equipment (over 20 cu. yds. up to and including 31 cu. yds.) (637D and similar); Soil Stabilizer (P & H or equal); Sub‐Grader (Gurries or other automatic type); Tractors (D‐9 or equivalent, all attachments); Tractor (Tandem Scraper);
Watch Engineer.
GROUP 10A: Boat Operator; Cable‐operated Crawler Crane (up to and including 25 tons); Cable‐operated Power Shovel, Clamshell, Dragline and Backhoe (up to and including 1 cu.
yd.); Dozer D9‐L; Dozer (D‐10, HD41 and similar) (all attachments); Gradall (up to and including 1 cu. yd.);
Hydraulic Backhoe (over 3/4 cu. yds. up to and including 2
cu. yds.); Mobile Truck Crane Operator (up to and including 25 tons) (Mobile Truck Crane Driver Required);
Self‐propelled Boom Type Lifting Device (Center Mount) (up to and including 25 tons) (Grove, Drott, P&H, Pettibone and similar; Trencher (over 6 feet and 750 h.p. or more); Watch Engineer (steam or electric).
GROUP 11: Automatic Slip Form Paver (concrete or asphalt);
Band Wagon (in conjunction with Wheel Excavator);
Cable‐operated Crawler Cranes (over 25 tons but less than 50 tons); Cable‐operated Power Shovel, Clamshell, Dragline and Backhoe (over 1 cu. yd. up to 7 cu. yds.); Gradall (over 1 cu. yds. up to 7 cu. yds.); DW‐10, 20, etc.
(Tandem); Earthmoving Machines (multiple propulsion power units and 2 or more Scrapers) (up to and including 35 cu.
yds.,"" struck"" m.r.c.); Highline Cableway; Hydraulic Backhoe (over 2 cu. yds. up to and including 4 cu. yds.);
Leverman; Lift Slab Machine; Loader (over 12 cu. yds);
Section 00 72 00, Attachment A - Page 7
Master Boat Operator; Mobile Truck Crane Operator (over 25 tons but less than 50 tons); (Mobile Truck Crane Driver required); Pre‐stress Wire Wrapping Machine; Self‐propelled Boom‐type Lifting Device (Center Mount) (over 25 tons m.r.c); Self‐propelled Compactor (with multiple‐propulsion power units); Single Engine Rubber Tired Earthmoving Machine (with Tandem Scraper); Tandem Cats; Trencher (pulling attached shield).
GROUP 12: Clamshell or Dipper Operator; Derricks; Drill Rigs;
Multi‐Propulsion Earthmoving Machines (2 or more Scrapers) (over 35 cu. yds ""struck""m.r.c.); Operators (Derricks, Piledrivers and Cranes); Power Shovels and Draglines (7 cu.
yds. m.r.c. and over); Self‐propelled rubber‐tired Earthmoving equipment (over 31 cu. yds.) (657B and similar); Wheel Excavator (up to and including 750 cu. yds.
per hour); Wheel Excavator (over 750 cu. yds. per hour).
GROUP 12A: Dozer (D‐11 or similar or larger); Hydraulic Excavators (over 4 cu. yds.); Lifting cranes (50 tons and over); Pioneering Dozer/Backhoe (initial clearing and excavation for the purpose of providing access for other equipment where the terrain worked involves 1‐to‐1 slopes that are 50 feet in height or depth, the scope of this work does not include normal clearing and grubbing on usual hilly terrain nor the excavation work once the access is provided); Power Blade Operator (Cat 12 or equivalent or over); Straddle Lifts (over 50 tons); Tower Crane, Mobile;
Traveling Truss Cranes; Universal, Liebher, Linden, and similar types of Tower Cranes (in the erection, dismantling, and moving of equipment there shall be an additional Operating Engineer or Heavy Duty Repairman);
Yo‐Yo Cat or Dozer.
GROUP 13: Truck Driver (Utility, Flatbed, etc.)
GROUP 13A: Dump Truck, 8 cu.yds. and under (water level);
Water Truck (up to and including 2,000 gallons).
GROUP 13B: Water Truck (over 2,000 gallons); Tandem Dump Truck, over 8 cu. yds. (water level).
GROUP 13C: Truck Driver (Semi‐trailer. Rock Cans, Semi‐Dump or Roll‐Offs).
GROUP 13D: Truck Driver (Slip‐In or Pup).
GROUP 13E: End Dumps, Unlicensed (Euclid, Mack, Caterpillar or similar); Tractor Trailer (Hauling Equipment); Tandem Trucks hooked up to Trailer (Hauling Equipment)
Section 00 72 00, Attachment A - Page 8
BOOMS AND/OR LEADS (HOURLY PREMIUMS):
The Operator of a crane (under 50 tons) with a boom of 80 feet or more (including jib), or of a crane (under 50 tons) with leads of 100 feet or more, shall receive a per hour premium for each hour worked on said crane (under 50 tons) in accordance with the following schedule:
Booms of 80 feet up to but not including 130 feet or Leads of 100 feet up to but not including 130 feet 0.50 Booms and/or Leads of 130 feet up to but not including 180 feet 0.75 Booms and/or Leads of 180 feet up to and including 250 feet 1.15 Booms and/or Leads over 250 feet 1.50
The Operator of a crane (50 tons and over) with a boom of 180 feet or more (including jib) shall receive a per hour premium for each hour worked on said crane (50 tons and over) in accordance with the following schedule:
Booms of 180 feet up to and including 250 feet 1.25 Booms over 250 feet 1.75
ENGI0003‐004 09/04/2017
Rates Fringes
Dredging: (Boat Operators) Boat Deckhand...............$ 41.22 30.93 Boat Operator...............$ 43.43 30.93 Master Boat Operator........$ 43.58 30.93 Dredging: (Clamshell or Dipper Dredging)
GROUP 1.....................$ 43.94 30.93
GROUP 2.....................$ 43.28 30.93
GROUP 3.....................$ 42.88 30.93
GROUP 4.....................$ 41.22 30.93
Dredging: (Derricks)
GROUP 1.....................$ 43.94 30.93
GROUP 2.....................$ 43.28 30.93
GROUP 3.....................$ 42.88 30.93
GROUP 4.....................$ 41.22 30.93
Dredging: (Hydraulic Suction
Section 00 72 00, Attachment A - Page 9
Dredges)
GROUP 1.....................$ 43.58 30.93
GROUP 2.....................$ 43.43 30.93
GROUP 3.....................$ 43.28 30.93
GROUP 4.....................$ 43.22 30.93
GROUP 5.....................$ 37.88 26.76
Group 5.....................$ 42.88 30.93
GROUP 6.....................$ 37.77 26.76
Group 6.....................$ 42.77 30.93
GROUP 7.....................$ 36.22 26.76
Group 7.....................$ 41.22 30.93
CLAMSHELL OR DIPPER DREDGING CLASSIFICATIONS
GROUP 1: Clamshell or Dipper Operator.
GROUP 2: Mechanic or Welder; Watch Engineer.
GROUP 3: Barge Mate; Deckmate.
GROUP 4: Bargeman; Deckhand; Fireman; Oiler.
HYDRAULIC SUCTION DREDGING CLASSIFICATIONS
GROUP 1: Leverman.
GROUP 2: Watch Engineer (steam or electric).
GROUP 3: Mechanic or Welder.
GROUP 4: Dozer Operator.
GROUP 5: Deckmate.
GROUP 6: Winchman (Stern Winch on Dredge) GROUP 7: Deckhand (can operate anchor scow under direction of Deckmate); Fireman; Leveeman; Oiler.
DERRICK CLASSIFICATIONS
GROUP 1: Operators (Derricks, Piledrivers and Cranes).
GROUP 2: Saurman Type Dragline (over 5 cubic yards).
GROUP 3: Deckmate; Saurman Type Dragline (up to and including 5 yards).
GROUP 4: Deckhand, Fireman, Oiler.
ENGI0003‐044 09/03/2018
Rates Fringes
Power Equipment Operators
(PAVING)
Asphalt Concrete Material Transfer....................$ 42.92 32.08 Asphalt Plant Operator......$ 43.35 32.08 Asphalt Raker...............$ 41.96 32.08 Asphalt Spreader Operator...$ 43.44 32.08
Section 00 72 00, Attachment A - Page 10
Cold Planer.................$ 43.75 32.08 Combination Loader/Backhoe (over 3/4 cu.yd.)...........$ 41.96 32.08 Combination Loader/Backhoe (up to 3/4 cu.yd.)..........$ 40.98 32.08 Concrete Saws and/or Grinder (self‐propelled unit on streets, highways, airports and canals)........$ 42.92 32.08 Grader......................$ 43.75 32.08 Laborer, Hand Roller........$ 41.46 32.08 Loader (2 1/2 cu. yds. and under)......................$ 42.92 32.08 Loader (over 2 1/2 cu.
yds. to and including 5
cu. yds.)...................$ 43.24 32.08 Roller Operator (five tons and under)..................$ 41.69 32.08 Roller Operator (over five tons).......................$ 43.12 32.08 Screed Person...............$ 42.92 32.08 Soil Stabilizer.............$ 43.75 32.08
IRON0625‐001 09/01/2019
Rates Fringes
Ironworkers:.....................$ 41.50 37.55
a. Employees will be paid $.50 per hour more while working in tunnels and coffer dams; $1.00 per hour more when required to work under or are covered with water (submerged) and when they are required to work on the summit of Mauna Kea, Mauna Loa or Haleakala.
LABO0368‐001 09/02/2019
Rates Fringes
Laborers:
Driller.....................$ 39.05 21.52 Final Clean Up..............$ 29.25 17.22 Gunite/Shotcrete Operator and High Scaler.............$ 38.55 21.52 Laborer I...................$ 38.05 21.52 Laborer II..................$ 35.45 21.52 Mason Tender/Hod Carrier....$ 38.55 21.52 Powderman...................$ 39.05 21.52 Window Washer (bosun chair).$ 37.55 21.52
LABORERS CLASSIFICATIONS
Section 00 72 00, Attachment A - Page 11
Laborer I: Air Blasting run by electric or pneumatic compressor; Asphalt Laborer, Ironer, Raker, Luteman, and Handroller, and all types of Asphalt Spreader Boxes;
Asphalt Shoveler; Assembly and Installation of Multiplates, Liner Plates, Rings, Mesh, Mats; Batching Plant (portable and temporary); Boring Machine Operator (under streets and sidewalks); Buggymobile; Burning and Welding; Chainsaw, Faller, Logloader, and Bucker; Compactors (Jackson Jumping Jack and similar); Concrete Bucket Dumpman; Concrete Chipping; Concrete Chuteman/Hoseman (pouring concrete) (the handling of the chute from ready‐mix trucks for such jobs as walls, slabs, decks, floors, foundations, footings, curbs, gutters, and sidewalks); Concrete Core Cutter (Walls, Floors, and Ceiling); Concrete Grinding or Sanding;
Concrete: Hooking on, signaling, dumping of concrete for treme work over water on caissons, pilings, abutments, etc.; Concrete: Mixing, handling, conveying, pouring, vibrating, otherwise placing of concrete or aggregates or by any other process; Concrete: Operation of motorized wheelbarrows or buggies or machines of similar character, whether run by gas, diesel, or electric power; Concrete Placement Machine Operator: operation of Somero Hammerhead, Copperheads, or similar machines; Concrete Pump Machine (laying, coupling, uncoupling of all connections and cleaning of equipment); Concrete and/or Asphalt Saw (Walking or Handtype) (cutting walls or flatwork) (scoring old or new concrete and/or asphalt) (cutting for expansion joints) (streets and ways for laying of pipe, cable or conduit for all purposes); Concrete Shovelers/Laborers (Wet or Dry); Concrete Screeding for Rough Strike‐Off: Rodding or striking‐off, by hand or mechanical means prior to finishing; Concrete Vibrator Operator; Coring Holes: Walls, footings, piers or other obstructions for passage of pipes or conduits for any purpose and the pouring of concrete to secure the hole; Cribbers, Shorer, Lagging, Sheeting, and Trench Jacking and Bracing, Hand‐Guided Lagging Hammer Whaling Bracing; Curbing (Concrete and Asphalt); Curing of Concrete (impervious membrane and form oiler) mortar and other materials by any mode or method; Cut Granite Curb Setter (setting, leveling and grouting of all precast concrete or stone curbs); Cutting and Burning Torch (demolition); Dri Pak‐It Machine; Environmental Abatement:
removal of asbestos, lead, and bio hazardous materials (EPA and/or OSHA certified); Falling, bucking, yarding, loading or burning of all trees or timber on construction site;
Forklift (9 ft. and under); Gas, Pneumatic, and Electric tools; Grating and Grill work for drains or other purposes;
Green Cutter of concrete or aggregate in any form, by hand, mechanical means, grindstone or air and/or water; Grout:
Section 00 72 00, Attachment A - Page 12
Spreading for any purpose; Guinea Chaser (Grade Checker) for general utility trenches, sitework, and excavation;
Headerboard Man (Asphalt or Concrete); Heat Welder of Plastic (Laborers' AGC certified workers) (when work involves waterproofing for waterponds, artificial lakes and reservoir) heat welding for sewer pipes and fusion of HDPE pipes; Heavy Highway Laborer (Rigging, signaling, handling, and installation of pre‐cast catch basins, manholes, curbs and gutters); High Pressure Nozzleman ‐ Hydraulic Monitor (over 100# pressure); Jackhammer Operator; Jacking of slip forms: All semi and unskilled work connected therewithin;
Laying of all multi‐cell conduit or multi‐purpose pipe;
Magnesite and Mastic Workers (Wet or Dry)(including mixer operator);Mortar Man; Mortar Mixer (Block, Brick, Masonry, and Plastering); Nozzleman (Sandblasting and/or Water Blasting): handling, placing and operation of nozzle;
Operation, Manual or Hydraulic jacking of shields and the use of such other mechanical equipment as may be necessary;
Pavement Breakers; Paving, curbing and surfacing of streets, ways, courts, under and overpasses, bridges, approaches, slope walls, and all other labor connected therewith; Pilecutters; Pipe Accessment in place, bolting and lining up of sectional metal or other pipe including corrugated pipe; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, HDPE, metallic or non‐metallic, conduit, and any other stationary‐type of tubular device used for conveying of any substance or element, whether water, sewage, solid, gas, air, or other product whatsoever and without regard to the nature of material from which tubular material is fabricated; No‐joint pipe and stripping of same, Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, treating Creosote and similar‐type materials (6‐inch) pipe and over); Piping: resurfacing and paving of all ditches in preparation for laying of all pipes; Pipe laying of lateral sewer pipe from main or side sewer to buildings or structure (except Contactor may direct work be done under proper supervision); Pipe laying, leveling and marking of the joint used for main or side sewers and storm sewers; Laying of all clay, terra cotta, ironstone, vitrified concrete, HDPE or other pipe for drainage; Placing and setting of water mains, gas mains and all pipe including removal of skids; Plaster Mortar Mixer/Pump; Pneumatic Impact Wrench; Portable Sawmill Operation: Choker setters, off bearers, and lumber handlers connected with clearing; Posthole Digger (Hand Held, Gas, Air and Electric); Powderman's Tender; Power Broom Sweepers (Small); Preparation and Compaction of roadbeds for
Section 00 72 00, Attachment A - Page 13 railroad track laying, highway construction, and the preparation of trenches, footings, etc., for cross‐country transmission by pipelines, electrical transmission or underground lines or cables (by mechanical means); Raising of structure by manual or hydraulic jacks or other methods and resetting of structure in new locations, including all concrete work; Ramming or compaction; Rigging in connection with Laborers' work (except demolition), Signaling (including the use of walkie talkie) Choke Setting, tag line usage; Tagging and Signaling of building materials into high rise units; Riprap, Stonepaver, and Rock Slinger (includes placement of stacked concrete, wet or dry and loading, unloading, signaling, slinging and setting of other similar materials); Rotary Scarifier (including multiple head concrete chipping Scarifier); Salamander Heater, Drying of plaster, concrete mortar or other aggregate; Scaffold Erector Leadman; Scaffolds: (Swing and hanging) including maintenance thereof; Scaler; Septic Tank/Cesspool and Drain Fields Digger and Installer;
Shredder/Chipper (tree branches, brush, etc.); Stripping and Setting Forms; Stripping of Forms: Other than panel forms which are to be re‐used in their original form, and stripping of forms on all flat arch work; Tampers (Barko, Wacker, and similar type); Tank Scaler and Cleaners;
Tarman; Tree Climbers and Trimmers; Trencher (includes hand‐held, Davis T‐66 and similar type); Trucks (flatbed up to and including 2 1/2 tons when used in connection with on‐site Laborers'work; Trucks (Refuse and Garbage Disposal) (from job site to dump); Vibra‐Screed (Bull Float in connection with Laborers' work); Well Points, Installation of or any other dewatering system.
Laborer II: Asphalt Plant Laborer; Boring Machine Tender;
Bridge Laborer; Burning of all debris (crates, boxes, packaging waste materials); Chainman, Rodmen, and Grade Markers; Cleaning, clearing, grading and/or removal for streets, highways, roadways, aprons, runways, sidewalks, parking areas, airports, approaches, and other similar installations; Cleaning or reconditioning of streets, ways, sewers and waterlines, all maintenance work and work of an unskilled and semi‐skilled nature; Concrete Bucket Tender (Groundman) hooking and unhooking of bucket; Concrete Forms; moving, cleaning, oiling and carrying to the next point of erection of all forms; Concrete Products Plant Laborers; Conveyor Tender (conveying of building materials); Crushed Stone Yards and Gravel and Sand Pit Laborers and all other similar plants; Demolition, Wrecking and Salvage Laborers: Wrecking and dismantling of buildings and all structures, with use of cutting or wrecking tools, breaking away, cleaning and removal of all fixtures, All
Section 00 72 00, Attachment A - Page 14 hooking, unhooking, signaling of materials for salvage or scrap removed by crane or derrick; Digging under streets, roadways, aprons or other paved surfaces; Driller's Tender;
Chuck Tender, Outside Nipper; Dry‐packing of concrete (plugging and filling of she‐bolt holes); Fence and/or Guardrail Erector: Dismantling and/or re‐installation of all fence; Finegrader; Firewatcher; Flagman (Coning, preparing, stablishing and removing portable roadway barricade devices); Signal Men on all construction work defined herein, including Traffic Control Signal Men at construction site; General Excavation; Backfilling, Grading and all other labor connected therewith; Digging of trenches, ditches and manholes and the leveling, grading and other preparation prior to laying pipe or conduit for any purpose; Excavations and foundations for buildings, piers, foundations and holes, and all other construction.
Preparation of street ways and bridges; General Laborer:
Cleaning and Clearing of all debris and surplus material.
Clean‐up of right‐of‐way. Clearing and slashing of brush or trees by hand or mechanical cutting. General Clean up:
sweeping, cleaning, wash‐down, wiping of construction facility and equipment (other than ""Light Clean up (Janitorial) Laborer. Garbage and Debris Handlers and Cleaners. Appliance Handling (job site) (after delivery unlading in storage area); Ground and Soil Treatment Work (Pest Control); Gunite/Shotcrete Operator Tender; Junk Yard Laborers (same as Salvage Yard); Laser Beam ""Target Man"" in connection with Laborers' work; Layout Person for Plastic (when work involves waterproofing for waterponds, artificial lakes and reservoirs); Limbers, Brush Loaders, and Pilers; Loading, Unloading, carrying, distributing and handling of all rods and material for use in reinforcing concrete construction (except when a derrick or outrigger operated by other than hand power is used); Loading, unloading, sorting, stockpiling, handling and distribution of water mains, gas mains and all pipes; Loading and unloading of all materials, fixtures, furnishings and appliances from point of delivery to stockpile to point of installation; hooking and signaling from truck, conveyance or stockpile; Material Yard Laborers; Pipelayer Tender;
Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, Creosote, and similar‐type materials (pipe under 6 inches); Plasterer Laborer; Preparation, construction and maintenance of roadbeds and sub‐grade for all paving, including excavation, dumping, and spreading of sub‐grade material; Prestressed or precast concrete slabs, walls, or sections: all loading, unloading, stockpiling, hooking on of such slabs, walls or sections; Quarry Laborers; Railroad, Streetcar, and Rail Transit Maintenance and Repair; Roustabout; Rubbish Trucks in connection with
Section 00 72 00, Attachment A - Page 15
Building Construction Projects (excluding clearing, grubbing, and excavating); Salvage Yard: All work connected with cutting, cleaning, storing, stockpiling or handling of materials, all cleanup, removal of debris, burning, back‐filling and landscaping of the site; Sandblasting Tender (Pot Tender): Hoses and pots or markers; Scaffolds:
Erection, planking and removal of all scaffolds used for support for lathers, plasters, brick layers, masons, and other construction trades crafts; Scaffolds: (Specially designed by carpenters) laborers shall tend said carpenter on erection and dismantling thereof, preparation for foundation or mudsills, maintenance; Scraping of floors;
Screeds: Handling of all screeds to be reused; handling, dismantling and conveyance of screeds; Setting, leveling and securing or bracing of metal or other road forms and expansion joints; Sheeting Piling/trench shoring (handling and placing of skip sheet or wood plank trench shoring);
Ship Scalers; Shipwright Tender; Sign Erector (subdivision traffic, regulatory, and street‐name signs); Sloper; Slurry Seal Crews (Mixer Operator, Applicator, Squeegee Man, Shuttle Man, Top Man); Snapping of wall ties and removal of tie rods; Soil Test operations of semi and unskilled labor such as filling sand bags; Striper (Asphalt, Concrete or other Paved Surfaces); Tool Room Attendant (Job Site);
Traffic Delineating Device Applicator; Underpinning, lagging, bracing, propping and shoring, loading, signaling, right‐of‐way clearance along the route of movement, The clearance of new site, excavation of foundation when moving a house or structure from old site to new site; Utilities employees; Water Man; Waterscape/Hardscape Laborers; Wire Mesh Pulling (all concrete pouring operations); Wrecking, stripping, dismantling and handling concrete forms an false work.
LABO0368‐002 09/02/2019
Rates Fringes
Landscape & Irrigation Laborers
GROUP 1.....................$ 26.15 13.45
GROUP 2.....................$ 27.15 13.45
GROUP 3.....................$ 21.55 13.45
LABORERS CLASSIFICATIONS
GROUP 1: Installation of non‐potable permanent or temporary irrigation water systems performed for the purposes of Landscaping and Irrigation architectural horticultural
Section 00 72 00, Attachment A - Page 16 work; the installation of drinking fountains and permanent or temporary irrigation systems using potable water for Landscaping and Irrigation architectural horticultural purposes only. This work includes (a) the installation of all heads, risers, valves, valve boxes, vacuum breakers (pressure and non‐pressure), low voltage electrical lines and, provided such work involves electrical wiring that will carry 24 volts or less, the installation of sensors, master control panels, display boards, junction boxes, conductors, including all other components for controllers,
(b) and metallic (copper, brass, galvanized, or similar) pipe, as well as PVC or other plastic pipe including all work incidental thereto, i.e., unloading, handling and distribution of all pipes fittings, tools, materials and equipment, (c) all soldering work in connection with the above whether done by torch, soldering iron, or other means; (d) tie‐in to main lines, thrust blocks (both precast and poured in place), pipe hangers and supports incidental to installation of the entire irrigation system,
(e) making of pressure tests, start‐up testing, flushing, purging, water balancing, placing into operation all irrigation equipment, fixtures and appurtenances installed under this agreement, and (f) the fabrication, replacement, repair and servicing oflandscaping and irrigation systems.
Operation of hand‐held gas, air, electric, or self‐powered tools and equipment used in the performance of Landscape and Irrigation work in connection with architectural horticulture; Choke‐setting, signaling, and rigging for equipment operators on job‐site in the performance of such Landscaping and Irrigation work; Concrete work (wet or dry) performed in connection with such Landscaping and Irrigation work. This work shall also include the setting of rock, stone, or riprap in connection with such Landscape, Waterscape, Rockscape, and Irrigation work;
Grubbing, pick and shovel excavation, and hand rolling or tamping in connection with the performance of such Landscaping and Irrigation work; Sprigging, handseeding, and planting of trees, shrubs, ground covers, and other plantings and the performance of all types of gardening and horticultural work relating to said planting; Operation of flat bed trucks (up to and including 2 1/2 tons).:
GROUP 2. Layout of irrigation and other non‐potable irrigation water systems and the layout of drinking fountains and other potable irrigation water systems in connection with such Landscaping and Irrigation work. This includes the layout of all heads, risers, valves, valve boxes, vacuum breakers, low voltage electrical lines, hydraulic and electrical controllers, and metallic (coppers, brass, galvanized, or similar) pipe, as well as
Section 00 72 00, Attachment A - Page 17
PVC or other plastic pipe. This work also includes the reading and interpretation of plans and specifications in connection with the layout of Landscaping, Rockscape, Waterscape, and Irrigation work; Operation of Hydro‐Mulching machines (sprayman and driver), Drillers, Trenchers (riding type, Davis T‐66, and similar) and fork lifts used in connection with the performance of such Landscaping and Irrigation work; Tree climbers and chain saw tree trimmers, Sporadic operation (when used in connection with Landscaping, Rockscape, Waterscape, and Irrigation work) of Skid‐Steer Loaders (Bobcat and similar), Cranes (Bantam, Grove, and similar), Hoptos, Backhoes, Loaders, Rollers, and Dozers (Case, John Deere, and similar), Water Trucks, Trucks requiring a State of Hawaii Public Utilities Commission Type 5 and/or type 7 license, sit‐down type and ""gang"" mowers, and other self‐propelled, sit‐down operated machines not listed under Landscape & Irrigation Maintenance Laborer; Chemical spraying using self‐propelled power spraying equipment (200 gallon capacity or more).
GROUP 3: Maintenance of trees, shrubs, ground covers, lawns and other planted areas, including the replanting of trees, shrubs, ground covers, and other plantings that did not ""take"" or which are damaged; provided, however, that re‐planting that requires the use of equipment, machinery, or power tools shall be paid for at the rate of pay specified under Landscape and Irrigation Laborer, Group 1;
Raking, mowing, trimming, and runing, including the use of ""weed eaters"", hedge trimmers, vacuums, blowers, and other hand‐held gas, air, electric, or self‐powered tools, and the operation of lawn mowers (Note: The operation of sit‐down type and ""gang"" mowers shall be paid for at the rate of pay specified under Landscape & Irrigation Laborer, Group 2); Guywiring, staking, propping, and supporting trees; Fertilizing, Chemical spraying using spray equipment with less than 200 gallon capacity, Maintaining irrigation and sprinkler systems, including the staking, clamping, and adjustment of risers, and the adjustment and/or replacement of sprinkler heads, (Note: the cleaning and gluing of pipe and fittings shall be paid for at the rate of pay specified under Landscape & Irrigation Laborer(Group 1); Watering by hand or sprinkler system and the peformance of other types of gardening, yardman, and horticultural‐related work.
LABO0368‐003 09/02/2019
Section 00 72 00, Attachment A - Page 18
Underground Laborer
GROUP 1.....................$ 38.65 21.47
GROUP 2.....................$ 40.15 21.47
GROUP 3.....................$ 40.65 21.47
GROUP 4.....................$ 41.65 21.47
GROUP 5.....................$ 41.90 21.47
GROUP 6.....................$ 42.00 21.47
GROUP 7.....................$ 42.25 21.47
GROUP 1: Watchmen; Change House Attendant.
GROUP 2: Swamper; Brakeman; Bull Gang‐Muckers, Trackmen;
Dumpmen (any method); Concrete Crew (includes rodding and spreading); Grout Crew; Reboundmen
GROUP 3: Chucktenders and Cabletenders; Powderman (Prime House); Vibratorman, Pavement Breakers
GROUP 4: Miners ‐ Tunnel (including top and bottom man on shaft and raise work); Timberman, Retimberman (wood or steel or substitute materials thereof); Blasters, Drillers, Powderman (in heading); Microtunnel Laborer; Headman;
Cherry Pickerman (where car is lifted); Nipper; Grout Gunmen; Grout Pumpman & Potman; Gunite, Shotcrete Gunmen & Potmen; Concrete Finisher (in tunnel); Concrete Screed Man;
Bit Grinder; Steel Form Raisers & Setters; High Pressure Nozzleman; Nozzleman (on slick line); Sandblaster‐Potman (combination work assignment interchangeable); Tugger
GROUP 5: Shaft Work & Raise (below actual or excavated ground level);…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .