W9128A20R0016 Drawings (Part 1 of 3).pdf

PDF 37 MB Posted

Attached to
Repair Building 502, Fort Shafter, Oahu, Hawaii
Solicitation number
W9128A-20-R-0016
Issued by

About this file

This document provides details for a federal solicitation to repair Building 502 at Fort Shafter, Oahu, Hawaii. The U.S. Army Corps of Engineers, Honolulu District is seeking proposals for repair work including removing two units per floor to provide utility cores, renovating existing barracks modules to meet standards, replacing interior finishes, and removing two units per floor from the sixth through eighth floors to provide dayroom support space. Offerors must visit the site on August 13, 2020 and register in the System for Award Management. Proposals will be evaluated on experience, past performance, technical approach, and price using lowest price technically acceptable procedures, with award intended for the best valued proposal. The performance period is 840 calendar days for work valued between $25-50 million. Subcontracting goals encourage maximum utilization of small, small disadvantaged, women-owned, HUBZone, veteran-owned, and service-disabled veteran-owned small businesses.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SITE

FORT SHAFTER BUILDING 502

FORT SHAFTER, OAHU, HAWAII

MAN ENTRANCE

(BUCKNER GATE)

PROJECT LOCATION

BUILDING 502

P

IE

R C

E S

T R

E E

T

CASEY STREET

S T

R O

N G

S T

R E

E T

B O

N N

E Y

L O

O P

WISSER ROAD

503A

503B

T H

E A

T E

R

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B U

IL

D

IN

G

K

A W

A M

U R

A H

A L L

F Y

R

E P

A

IR

B U

IL

D

IN

G

W A

-1 -D

-0

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I

J U

N E

W A

-1 -D

-0

B Y

C A

D

M N

UW

A

A II

Expiration Date 04/30/2022

LICENSED

No. 8026

PROFESSIONAL

ARCHITECT

H

M

ARK M

.S

.A

O

. N A

AK

THIS WORK WAS PREPARED BY ME OR UNDER MY

SUPERVISION AND CONSTRUCTION OF THIS

PROJECT WILL BE UNDER MY OBSERVATION.

("OBSERVATION OF CONSTRUCTION"

SHALL BE DEFINED IN CHAPTER 115, HAWAII

ADMINISTRATIVE RULES FOR PROFESSIONAL

ENGINEERS, SURVEYORS AND LANDSCAPE

ARCHITECTS STATE OF HAWAII, SUBCHAPTER 1,

SECTION 16-115-2 DEFINITIONS, EFFECTIVE 8/29/94.)

G-001

BLDG502

T

IT

L E

S H

E E

T B o w e rs

K u b o ta

M a n a g e m e n t

-4

A k o k i S tr e e t, S u it e

-B

W a ip a h u H a w a ii

ID

O P

T

IO

N F

IE

L D

O

P T

IO

N

T

IT

L E

O P

T

IO

N T

IT

L E

D E

S

IG

N C

O M

P L E

T E

S U

B M

IT

T

A L

O P

T

IO

N F

IE

L D

NTS

FORT SHAFTER VICINITY MAP

PLAN NORTHPLAN NORTH

US Army Corps of Engineers ®

HONOLULU DISTRICT

FY20 REPAIR BUILDING 502

FORT SHAFTER, OAHU, HAWAII

SOLICITATION NO:

CONTRACT NO: W1928A-19-D-0007

ISSUE DATE: JUNE 26, 2020

VOLUME: 1

NTS

LOCATION MAP

ARCHITECT

COMPANY: BOWERS + KUBOTA MANAGEMENT

CONTACT: BRENT YOSHITAKE

ADDRESS: 94-408 AKOKI STREET, SUITE 201-A

WAIPAHU, HI 96797

PHONE NUMBER: (808) 836-7787

EMAIL: byoshitake@bowersandkubota.com

MECHANICAL

COMPANY: INSYNERGY

CONTACT: BARRY JIM ON/ DERON JYO

ADDRESS: 828 FORT STREET MALL,

SUITE 500, HONOLULU, HAWAII 96813

PHONE NUMBER: (808) 521-3773

EMAIL: bjimon@insynergyeng.com EMAIL: djyo@insynergyeng.com

CIVIL

COMPANY: BOWERS + KUBOTA MANAGEMENT

CONTACT: NICK ORENSE

ADDRESS: 94-408 AKOKI STREET, SUITE 201-A

WAIPAHU, HI 96797

PHONE NUMBER: (808) 836-7787

EMAIL: norense@bowersandkubota.com

STRUCTURAL

COMPANY:NAGAMINE OKAWA ENGINEERS, INC.

CONTACT: MAXX TOYAMA

ADDRESS: 1003 BISHOP STREET, SUITE 2025

HONOLULU, HAWAII 96813

PHONE NUMBER: (808) 535-3018

EMAIL: maxxt@nagamineokawa.com

FIRE PROTECTION

COMPANY: COFFMAN ENGINEERS, INC.

CONTACT: JAY HIGASHI/ PATRICK JOHNSON

ADDRESS: 745 FORT STREET MALL, SUITE 400

HONOLULU, HAWAII 96813

PHONE NUMBER: (808) 687-8884

EMAIL: jay.higashi@coffman.com EMAIL: patrick.johnson@coffman.com

CYBER SECURITY

COMPANY: EXP FEDERAL INC.

CONTACT: THOMAS CALLAHAN

ADDRESS: 205 N MICHIGAN AVE, SUITE 3800

CHICAGO, ILLINOIS 60601-5941

PHONE NUMBER: (312) 616-7494

EMAIL: thomas.callahan@expfederal.com

COST ESTIMATOR

COMPANY: J. UNO & ASSOCIATES

CONTACT: VINSON HIRAOKA

ADDRESS: 1210 WARD AVE, SUITE 204

HONOLULU, HAWAII 96814

PHONE NUMBER: (808) 947-6855

EMAIL: vinson@j-uno.com

ENVIRONMENTAL

COMPANY: ENVIROQUEST

CONTACT: DAVID LEIGH

ADDRESS: 98-029 HEKAHA STREET, SUITE 21

AIEA, HAWAII 96701

PHONE NUMBER: (808) 486-5881

EMAIL: dleigh@enviroquestinc.com

ARBORIST

COMPANY: CAROL KWAN CONSULTING LLC

CONTACT: CAROL KWAN

ADDRESS: P.O. BOX 893953

MILILANI, HAWAII 96789

PHONE NUMBER: (808) 381-1342

EMAIL: carol@carolkwanconsulting.com

SURVEYOR

COMPANY: CONTROL POINT

CONTACT:

ADDRESS: 615 PIIKOI STREET, SUITE 700

HONOLULU, HAWAII 96814

PHONE NUMBER: (808) 591-2022

EMAIL:

GEOTECHNICAL

COMPANY: PACIFIC GEOTECHNICAL ENGINEERS,INC.

CONTACT: KEN FAN, VICE PRESIDENT

ADDRESS: 94-417 AKOKI STREET,

WAIPAHU, HAWAII 96797

PHONE NUMBER: (808) 678-8024

EMAIL: kfan@pacificgeotechnical.com

TELECOMMUNICATION

COMPANY: RONALD N.S. HO & ASSOCIATES,INC.

CONTACT: SEY ITO

ADDRESS: 2531 N KING ST, SUITE 201

HONOLULU, HAWAII 96819

PHONE NUMBER: (808) 536-1737

EMAIL: sito@rnsha.com

ELECTRICAL ENGINEER

COMPANY: BOWERS + KUBOTA MANAGEMENT

CONTACT: BRIAN ITOZAKI

ADDRESS: 94-408 AKOKI STREET, SUITE 201-A

WAIPAHU, HI 96797

PHONE NUMBER: (808) 836-7787

EMAIL: bitozaki@bowersandkubota.com

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B U

IL

D

IN

G

K

A W

A M

U R

A H

A L L

F Y

R

E P

A

IR

B U

IL

D

IN

G

W A

-1 -D

-0

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I

J U

N E

W A

-1 -D

-0

B Y

C A

D

M N

UW

A

A II

Expiration Date 04/30/2022

LICENSED

No. 8026

PROFESSIONAL

ARCHITECT

H

M

ARK M

.S

.A

O

. N A

AK

THIS WORK WAS PREPARED BY ME OR UNDER MY

SUPERVISION AND CONSTRUCTION OF THIS

PROJECT WILL BE UNDER MY OBSERVATION.

("OBSERVATION OF CONSTRUCTION"

SHALL BE DEFINED IN CHAPTER 115, HAWAII

ADMINISTRATIVE RULES FOR PROFESSIONAL

ENGINEERS, SURVEYORS AND LANDSCAPE

ARCHITECTS STATE OF HAWAII, SUBCHAPTER 1,

SECTION 16-115-2 DEFINITIONS, EFFECTIVE 8/29/94.)

G-002

BLDG502

IN

D

E X

O F

D R

A W

IN

G

S B o w e rs

K u b o ta

M a n a g e m e n t

-4

A k o k i S tr e e t, S u it e

-B

W a ip a h u H a w a ii

ID

O P

T

IO

N F

IE

L D

O

P T

IO

N

T

IT

L E

O P

T

IO

N T

IT

L E

D E

S

IG

N C

O M

P L E

T E

S U

B M

IT

T

A L

O P

T

IO

N F

IE

L D

SHEET NO SHEET TITLE REV

V-001 EXISTING CONDITIONS

B-001 BORING LOGS LEGEND AND NOTES

B-002 BORING LOCATION PLAN

BB001 BORING LOGS - 1

BB002 BORING LOGS - 2

BB003 BORING LOGS - 3, SYMBOLS AND NOTES

C-001 NOTES

C-002 LEGEND & ABBREVIATIONS

C-003 EROSION CONTROL PLAN

C-004 EROSION CONTROL NOTES AND DETAILS

C-005 HAUL ROUTE AND COSA

CD101 DEMOLITION PLAN

CG101 SITE GRADING PLAN

CP101 SIGNAGE AND STRIPING PLAN

CP501 SIGNAGE AND STRIPING DETAILS

CS101 SITE PLAN

CS501 SITE DETAILS - 1

CS502 SITE DETAILS - 2

CU101 UTILITY PLAN

CU201 UTILITY PROFILES

CU501 TRENCH DETAILS

CU502 DRAINAGE DETAILS

CU503 SEWER DETAILS

CU504 WATER DETAILS

INDEX OF DRAWINGS

GENERAL

SHEET NO SHEET TITLE REV

SD101 FOUNDATION/FIRST FLOOR DEMO PLAN

SD102 SECOND FLOOR DEMO PLAN

SD103 THIRD FLOOR DEMO PLAN

SD104 FOURTH FLOOR DEMO PLAN

SD105 FIFTH FLOOR DEMO PLAN

SD106 SIXTH FLOOR DEMO PLAN

SD107 SEVENTH FLOOR DEMO PLAN

SD108 EIGHTH FLOOR DEMO PLAN

SD109 ROOF DEMO PLAN

SD401 ENLARGED FOUNDATION/FIRST FLOOR DEMO PLANS

SD402 ENLARGED FOUNDATION/FIRST FLOOR DEMO PLANS

SD403 ENLARGED FOUNDATION/FIRST FLOOR DEMO PLANS

SD404 ENLARGED SECOND FLOOR DEMO PLANS

SD405 ENLARGED SECOND THROUGH FIFTH FLOOR DEMO PLANS

SD406 ENLARGED THIRD THROUGH EIGHTH FLOOR DEMO PLAN

SD501 DEMOLITION DETAILS

SD502 DEMOLITION DETAILS

SD503 DEMOLITION DETAILS

S-001 STRUCTURAL GENERAL NOTES

S-002 STRUCTURAL GENERAL NOTES

S-101 FOUNDATION/FIRST FLOOR FRAMING PLAN

S-102 SECOND FLOOR FRAMING PLAN

S-103 THIRD FLOOR FRAMING PLAN

S-104 FOURTH FLOOR FRAMING PLAN

S-105 FIFTH FLOOR FRAMING PLAN

S-106 SIXTH FLOOR FRAMING PLAN

S-107 SEVENTH FLOOR FRAMING PLAN

S-108 EIGHTH FLOOR FRAMING PLAN

S-109 ROOF FRAMING PLAN

S-401 ENLARGED FOUNDATION/FIRST FLOOR PLANS

S-402 ENLARGED FOUNDATION/FIRST FLOOR PLANS

S-403 ENLARGED FOUNDATION/FIRST FLOOR PLANS

S-404 ENLARGED SECOND THROUGH EIGHTH FLOOR PLANS

S-405 ENLARGED SECOND THROUGH EIGHTH FLOOR PLANS

S-406 ENLARGED THIRD THROUGH EIGHTH FLOOR PLANS

S-407 ENLARGED ROOF PLANS

S-408 ENLARGED ROOF PLANS

S-409 ENLARGED STAIR PLANS AND SECTIONS

S-501 TYPICAL DETAILS

S-502 TYPICAL DETAILS

S-503 GRADE BEAM DETAILS

S-504 MICROPILE DETAILS

S-505 CONCRETE WALL DETAILS

S-506 STEEL DETAILS

S-507 STEEL DETAILS

S-508 STEEL DETAILS

S-509 CMU WALL DETAILS

S-510 TYPICAL CONCRETE REPAIR DETAILS

S-511 TYPICAL CONCRETE REPAIR DETAILS

S-601 CONCRETE REPAIR TABLES

SHEET NO SHEET TITLE REV

A-201 FIRST FLOOR REFLECTED CEILING PLAN

A-202 SECOND FLOOR REFLECTED CEILING PLAN

A-203 THIRD FLOOR REFLECTED CEILING PLAN (SIMILAR @ FOURTH & FIFTH FLOOR)

A-204 SIXTH FLOOR REFLECTED CEILING PLAN (SIMILAR @ SEVENTH FLOOR & EIGHTH FLOOR)

A-301 NORTH EXTERIOR ELEVATION

A-302 NORTHEAST EXTERIOR ELEVATION

A-303 NORTHWEST AND SOUTHEAST EXTERIOR ELEVATION

A-304 SOUTH EXTERIOR ELEVATION

A-305 WEST EXTERIOR ELEVATION

A-306 SOUTHEAST PARTIAL EXTERIOR ELEVATION & SOUTHWEST EXTERIOR ELEVATION

A-310 BUILDING SECTIONS

A-311 BUILDING SECTIONS

A-312 BUILDING SECTION

A-313 BUILDING SECTION

A-314 BUILDING SECTION

A-320 WALL SECTIONS

A-321 WALL SECTIONS

A-401 ENLARGED FIRST FLOOR PLAN - CORE AREA PLAN

A-402 ENLARGED FIRST FLOOR PLAN - LAUNDRY & MECHANICAL AREA & SECOND TO EIGHTH FLOOR CORE AREA PLANS

A-403 TYPICAL ENLARGED UNIT A & B FLOOR PLAN

A-404 ENLARGED TYPICAL UNIT C, D, & E

A-405 ENLARGED STAIR PLANS AND SECTIONS

A-410 ENLARGED FIRST FLOOR REFLECTED CEILING PLAN AND DAYROOM AREA

A-411 FIRST FLOOR REFLECTED CEILING PLAN-LAUNDRY & MECH AND SECOND TO EIGHTH CEILING PLAN-CORE AREA

A-412 ENLARGED FIRST FLOOR REFLECTED CEILING PLAN - UNIT A & B

A-413 ENLARGED TYPICAL UNIT C, D, & E REFLECTED CEILING PLAN

A-414 ENLARGED REFLECTED CEILING PLAN - STAIR #1 & #2

A-420 INTERIOR ELEVATIONS

A-421 INTERIOR ELEVATIONS

A-422 INTERIOR ELEVATIONS

A-423 INTERIOR ELEVATIONS

A-501 WALL TYPES

A-502 WALL TYPES

A-510 CASEWORK DETAILS

A-511 CASEWORK DETAILS

A-512 DETAILS

A-513 DETAILS

A-514 GUARDRAILS AND HANDRAILS DETAILS

A-520 ROOF DETAILS

A-521 ROOF DETAILS

A-522 ROOF DETAILS

A-601 DOOR SCHEDULE

A-602 DOOR SCHEDULE

A-603 DOOR DETAILS

A-604 DOOR DETAILS

A-610 WINDOW SCHEDULE & TYPES, LOUVER SCHEDULE & TYPES, DOOR TYPES

A-611 WINDOW & LOUVER DETAILS

A-612 WINDOW & LOUVER DETAILS

A-613 WINDOW & LOUVER DETAILS

AF001 MOUNTING HEIGHT SCHEDULE, EQUIPMENT LEGEND, TOILET ACCESSORIES LEGEND

AF100 FLOOR FINISH, FURNITURE & EQUIPMENT PLAN ENLARGED TYPICAL UNITS A & B

AF101 FLOOR FINISH, FURNITURE & EQUIPMENT PLAN ENLARGED TYPICAL UNIT C, D & E

AF601 FINISH LEGEND

AF602 ROOM FINISH SCHEDULE

AG601 SIGNAGE SCHEDULE

AG602 SIGNAGE DETAILS

AG603 SIGNAGE MOUNTING DETAILS

AG610 FIRST FLOOR SIGNAGE PLAN

AG611 SECOND FLOOR SIGNAGE PLAN

AG612 THIRD FLOOR TO FIFTH FLOOR SIGNAGE PLAN

AG613 SIXTH FLOOR TO EIGHTH FLOOR SIGNAGE PLAN

AG614 ROOF, ELEVATOR MACHINE ROOM ROOF, STAIR #2 SIGNAGE PLAN

AJ101 FIRST FLOOR AIR BARRIER PLAN

AJ102 SECOND FLOOR AIR BARRIER PLAN

AJ103 THIRD FLOOR TO FIFTH FLOOR AIR BARRIER PLAN

AJ201 BUILDING SECTION AIR BARRIER TEST ZONES

AJ202 BUILDING SECTION AIR BARRIER TEST ZONES

AJ203 BUILDING SECTIONS AIR BARRIER TEST ZONES

SHEET NO SHEET TITLE REV

A-001 GENERAL NOTES, ARCHITECTURAL ABBREVIATIONS, LEGENDS, AND SYMBOLS

AD101 FIRST FLOOR DEMOLITION PLAN

AD102 SECOND FLOOR DEMOLITION PLAN

AD103 THIRD FLOOR DEMOLITION PLAN (SIMILAR @ FOURTH AND FIFTH FLOOR)

AD104 SIXTH FLOOR DEMOLITION PLAN (SIMILAR @ SEVENTH FLOOR)

AD105 ROOF, ELEVATOR MACHINE ROOM DEMOLITION PLAN, ELEVATOR MACHINE ROOM DEMOLITION ROOF PLAN, & STAIR

#2 ROOF DEMOLITION PLAN

AD201 FIRST FLOOR CEILING DEMOLITION PLAN

AD202 SECOND FLOOR CEILING DEMOLITION PLAN

AD203 THIRD FLOOR CEILING DEMOLITION PLAN (SIMILAR @ FOURTH AND FIFTH FLOOR)

AD204 SIXTH FLOOR TO EIGHTH FLOOR CEILING DEMOLITION PLAN

A-101 FIRST FLOOR PLAN

A-102 SECOND FLOOR PLAN & ENLARGED TYPICAL CRICKET PLAN

A-103 THIRD FLOOR TO FIFTH FLOOR PLAN

A-104 SIXTH FLOOR TO EIGHTH FLOOR PLAN

A-105 ROOF, ELEVATOR MACHINE ROOM FLOOR PLAN, ELEVATOR MACHINE ROOM ROOF, STAIR #2 ROOF FLOOR PLAN, &

STAIR #2 ROOF PLAN

SHEET NO SHEET TITLE REV

P-102 SECOND FLOOR OVERALL PLUMBING PLAN

P-103 THIRD TO FIFTH FLOOR OVERALL PLUMBING PLAN

P-104 SIXTH TO SEVENTH FLOOR OVERALL PLUMBING PLAN

P-105 EIGHTH FLOOR OVERALL PLUMBING PLAN

P-106 ROOF OVERALL PLUMBING PLAN

P-401 FIRST FLOOR ENLARGED PLUMBING PLAN

P-402 FIRST FLOOR ENLARGED PLUMBING PLAN

P-403 FIRST FLOOR ENLARGED PLUMBING PLAN

P-404 FIRST FLOOR ENLARGED PLUMBING PLAN

P-405 SECOND FLOOR ENLARGED PLUMBING PLAN

P-406 SECOND FLOOR ENLARGED PLUMBING PLAN

P-407 SECOND FLOOR ENLARGED PLUMBING PLAN

P-408 SECOND FLOOR ENLARGED PLUMBING PLAN

P-409 THIRD TO FIFTH FLOOR ENLARGED PLUMBING PLAN

P-410 THIRD TO FIFTH FLOOR ENLARGED PLUMBING PLAN

P-411 THIRD TO FIFTH FLOOR ENLARGED PLUMBING PLAN

P-412 THIRD TO FIFTH FLOOR ENLARGED PLUMBING PLAN

P-413 SIXTH TO SEVENTH FLOOR ENLARGED PLUMBING PLAN

P-414 SIXTH TO SEVENTH FLOOR ENLARGED PLUMBING PLAN

P-415 SIXTH TO SEVENTH FLOOR ENLARGED PLUMBING PLAN

P-416 SIXTH TO SEVENTH FLOOR ENLARGED PLUMBING PLAN

P-417 EIGHTH FLOOR ENLARGED PLUMBING PLAN

P-418 EIGHTH FLOOR ENLARGED PLUMBING PLAN

P-419 EIGHTH FLOOR ENLARGED PLUMBING PLAN

P-420 EIGHTH FLOOR ENLARGED PLUMBING PLAN

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING EQUIPMENT SCHEDULE

P-602 PLUMBING EQUIPMENT SCHEDULE

P-901 HOT WATER SYSTEM SCHEMATIC

P-902 SANITARY PIPING DIAGRAMS

P-903 SANITARY PIPING DIAGRAMS

P-904 SANITARY PIPING DIAGRAMS

P-905 SANITARY PIPING DIAGRAMS

P-906 SITE WATER PIPING DIAGRAM

P-907 WATER PIPING DIAGRAMS

P-908 WATER PIPING DIAGRAMS

P-909 TYPICAL WATER PIPING DIAGRAMS

P-910 HOT WATER HEATER ROOM PIPING DIAGRAM

SHEET NO SHEET TITLE REV

P-001 PLUMBING NOTES AND LEGEND

PS101 OVERALL PLUMBING SITE - DEMOLITION WORK

PS102 OVERALL PLUMBING SITE - NEW WORK

PD101 FIRST FLOOR PLUMBING PLAN - DEMOLITION WORK

PD102 SECOND FLOOR PLUMBING PLAN - DEMOLITION WORK

PD103 THIRD FLOOR PLUMBING PLAN - DEMOLITION WORK (SIMILAR @ FOURTH AND FIFTH FLOOR)

PD104 SIXTH FLOOR PLUMBING PLAN - DEMOLITION WORK (SIMILAR @ SEVENTH FLOOR)

PD105 ROOF PLUMBING PLAN - DEMOLITION WORK

PD401 ENLARGED PLUMBING DEMOLITION PLANS

PD402 ENLARGED PLUMBING DEMOLITION PLANS

P-101 FIRST FLOOR OVERALL PLUMBING PLAN

SHEET NO SHEET TITLE REV

M-001 MECHANICAL GENERAL NOTES, LEGEND, ABBREVIATIONS, AND SYMBOLS

MS-101 DEMOLITION MECHANICAL SITE PLAN

MS-102 NEW MECHANICAL SITE PLAN

MD-101 FIRST FLOOR HVAC DEMOLITION PLAN

MD-102 SECOND FLOOR HVAC DEMOLITION PLAN (THIRD THRU SEVENTH FLOORS SIMILAR)

MD-103 EIGHTH FLOOR HVAC DEMOLITION PLAN

MD-104 ROOF HVAC DEMOLITION PLAN

MH-101 FIRST FLOOR HVAC NEW WORK PLAN

MH-102 SECOND THRU FIFTH FLOOR HVAC NEW WORK PLAN

MH-103 SIXTH THRU EIGHTH FLOOR HVAC NEW WORK PLAN

MH-104 ROOF HVAC NEW WORK PLAN

MH-401 ENLARGED FIRST FLOOR HVAC PLAN

MH-402 ENLARGED FIRST FLOOR HVAC PLAN

MH-403 ENLARGED FIRST FLOOR HVAC PLAN

MH-404 ENLARGED FIRST FLOOR HVAC PLAN

MH-405 ENLARGED SECOND THRU FIFTH FLOOR HVAC PLAN

MH-406 ENLARGED SECOND THRU FIFTH FLOOR HVAC PLAN

MH-407 ENLARGED SECOND THRU FIFTH FLOOR HVAC PLAN

MH-408 ENLARGED SECOND THRU FIFTH FLOOR HVAC PLAN

MH-409 ENLARGED SIXTH THRU EIGHTH FLOOR HVAC PLAN

MH-410 ENLARGED SIXTH THRU EIGHTH FLOOR HVAC PLAN

MH-411 ENLARGED SIXTH THRU EIGHTH FLOOR HVAC PLAN

MH-412 ENLARGED SIXTH THRU EIGHTH FLOOR HVAC PLAN

MH-413 ENLARGED ROOF HVAC PLAN

MH-414 ENLARGED ROOF HVAC PLAN

MH-415 ENLARGED ROOF HVAC PLAN

MH-416 ENLARGED ROOF HVAC PLAN

MH-417 ENLARGED PUMP ROOM PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

MH-601 MECHANICAL EQUIPMENT SCHEDULES

MH-602 MECHANICAL EQUIPMENT SCHEDULES

MH-603 TYPICAL VAV AHU SCHEMATIC AND SEQUENCE OF OPERATIONS

MH-604 DOAS SCHEMATIC DIAGRAM AND SEQUENCE OF OPERATIONS

MH-605 MECHANICAL CHILLED WATER SCHEMATIC DIAGRAM SEQUENCE OF OPERATIONS

MH-606 MECHANICAL DDC POINTS LIST- AIRSIDE SYSTEMS

MH-607 MECHANICAL CHILLED WATER DDC POINTS LIST

MH-608 DDC SYSTEM ARCHITECTURE SCHEMATIC

MH-901 OVERALL CHILLED WATER DIAGRAM

MH-902 PARTIAL CHILLED WATER DIAGRAM

MH-903 PARTIAL CHILLED WATER DIAGRAM

SHEET NO SHEET TITLE REV

F-001 FIRE PROTECTION NOTES, SYMBOLS AND ABBREVIATIONS

F-002 BUILDING CODE SUMMARY

F-003 CODE COMPLIANCE SITE PLAN

F-101 FIRST FLOOR PLAN - LIFE SAFETY

F-102 SECOND FLOOR PLAN - LIFE SAFETY

F-103 THIRD FLOOR PLAN (SIMILAR @ FOURTH AND FIFTH) - LIFE SAFETY

F-104 SIXTH FLOOR PLAN (SIMILAR @ SEVENTH AND EIGHTH) - LIFE SAFETY

FD101 FIRST FLOOR DEMOLITION PLAN - FIRE ALARM

FD102 SECOND FLOOR DEMOLITION PLAN - FIRE ALARM

FD103 THIRD FLOOR DEMOLITION PLAN (SIMILAR @ FOURTH AND FIFTH) - FIRE ALARM

FD104 SIXTH FLOOR DEMOLITION PLAN (SIMILAR @ SEVENTH AND EIGHTH) - FIRE ALARM

FD105 FIRST FLOOR DEMOLITION PLAN - FIRE SPRINKLER

FX101 FIRST FLOOR PLAN - FIRE SPRINKLER

FX102 SECOND FLOOR PLAN - FIRE SPRINKLER

FX103 THIRD FLOOR PLAN (SIMILAR @ FOURTH AND FIFTH) - FIRE SPRINKLER

FX104 SIXTH FLOOR PLAN (SIMILAR @ SEVENTH AND EIGHTH) - FIRE SPRINKLER

FX501 FIRE SPRINKLER DETAILS

FX601 FIRE SPRINKLER AND STANDPIPE ISOMETRIC PIPING

FA101 FIRST FLOOR PLAN - FIRE ALARM / MASS NOTIFICATION

FA102 SECOND FLOOR PLAN - FIRE ALARM / MASS NOTIFICATION

FA103 THIRD FLOOR PLAN (SIMILAR @ FOURTH AND FIFTH) - FIRE ALARM / MASS NOTIFICATION

FA104 SIXTH FLOOR PLAN (SIMILAR @ SEVENTH AND EIGHTH) - FIRE ALARM / MASS NOTIFICATION

FA501 FIRE ALARM / MASS NOTIFICATION DETAILS

FA601 FIRE ALARM / MASS NOTIFICATION SEQUENCE OF OPERATIONS

FA602 FIRE ALARM / MASS NOTIFICATION RISER DIAGRAM

FA603 FIRE ALARM / MASS NOTIFICATION RISER DIAGRAM

CIVIL

LANDSCAPE

STRUCTURAL

ARCHITECTURAL

ARCHITECTURAL (CONTINUED)

FIRE PROTECTION

PLUMBING

SHEET NO. SHEET TITLE REV

G-001 TITLE SHEET

G-002 INDEX OF DRAWINGS

G-003 INDEX OF DRAWINGS

SHEET NO SHEET TITLE REV

LD001 TREE PROTECTION NOTES

LD101 TREE DISPOSITION PLAN

LD601 TREE SURVEY AND ASSESSMENT

LP101 LANDSCAPE PLAN

PLUMBING (CONTINUED)

MECHANICAL

of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B U

IL

D

IN

G

K

A W

A M

U R

A H

A L L

F Y

R

E P

A

IR

B U

IL

D

IN

G

W A

-1 -D

-0

H O

N O

L U

L U

D

IS

T R

IC

T

F O

R T

S H

A F

T E

R H

I

J U

N E

W A

-1 -D

-0

B Y

C A

D

M N

UW

A

A II

Expiration Date 04/30/2022

LICENSED

No. 8026

PROFESSIONAL

ARCHITECT

H

M

ARK M

.S

.A

O

. N A

AK

THIS WORK WAS PREPARED BY ME OR UNDER MY

SUPERVISION AND CONSTRUCTION OF THIS

PROJECT WILL BE UNDER MY OBSERVATION.

("OBSERVATION OF CONSTRUCTION"

SHALL BE DEFINED IN CHAPTER 115, HAWAII

ADMINISTRATIVE RULES FOR PROFESSIONAL

ENGINEERS, SURVEYORS AND LANDSCAPE

ARCHITECTS STATE OF HAWAII, SUBCHAPTER 1,

SECTION 16-115-2 DEFINITIONS, EFFECTIVE 8/29/94.)

G-003

BLDG502

IN

D

E X

O F

D R

A W

IN

G

S B o w e rs

K u b o ta

M a n a g e m e n t

-4

A k o k i S tr e e t, S u it e

-B

W a ip a h u H a w a ii

ID

O P

T

IO

N F

IE

L D

O

P T

IO

N

T

IT

L E

O P

T

IO

N T

IT

L E

D E

S

IG

N C

O M

P L E

T E

S U

B M

IT

T

A L

O P

T

IO

N F

IE

L D

SHEET NO SHEET TITLE REV

T001 SYMBOLS LIST

TD101 PARTIAL FIRST FLOOR DEMOLITION TELECOM PLAN 1

TD102 PARTIAL FIRST FLOOR DEMOLITION TELECOM PLAN 2

TD201 PARTIAL SECOND FLOOR DEMOLITION TELECOM PLAN 1

TD202 PARTIAL SECOND FLOOR DEMOLITION TELECOM PLAN 2

TD301 PARTIAL THIRD FLOOR DEMOLITION TELECOM PLAN 1

TD302 PARTIAL THIRD FLOOR DEMOLITION TELECOM PLAN 2

TD401 PARTIAL FOURTH FLOOR DEMOLITION TELECOM PLAN 1

TD402 PARTIAL FOURTH FLOOR DEMOLITION TELECOM PLAN 2

TD501 PARTIAL FIFTH FLOOR DEMOLITION TELECOM PLAN 1

TD502 PARTIAL FIFTH FLOOR DEMOLITION TELECOM PLAN 2

TD601 PARTIAL SIXTH FLOOR DEMOLITION TELECOM PLAN 1

TD602 PARTIAL SIXTH FLOOR DEMOLITION TELECOM PLAN 2

TD701 PARTIAL SEVENTH FLOOR DEMOLITION TELECOM PLAN 1

TD702 PARTIAL SEVENTH FLOOR DEMOLITION TELECOM PLAN 2

TD801 PARTIAL EIGHTH FLOOR DEMOLITION TELECOM PLAN 1

TD802 PARTIAL EIGHTH FLOOR DEMOLITION TELECOM PLAN 2

TD901 PARTIAL ROOF DEMOLITION TELECOM PLAN 1

TD902 PARTIAL ROOF DEMOLITION TELECOM PLAN 2

T101 PARTIAL FIRST FLOOR NEW TELECOM PLAN 1

T102 PARTIAL FIRST FLOOR NEW TELECOM PLAN 2

T201 PARTIAL SECOND FLOOR NEW TELECOM PLAN 1

T202 PARTIAL SECOND FLOOR NEW TELECOM PLAN 2

T301 PARTIAL THIRD FLOOR NEW TELECOM PLAN 1

T302 PARTIAL THIRD FLOOR NEW TELECOM PLAN 2

T401 PARTIAL FOURTH FLOOR NEW TELECOM PLAN 1

T402 PARTIAL FOURTH FLOOR NEW TELECOM PLAN 2

T501 PARTIAL FIFTH FLOOR NEW TELECOM PLAN 1

T502 PARTIAL FIFTH FLOOR NEW TELECOM PLAN 2

T601 PARTIAL SIXTH FLOOR NEW TELECOM PLAN 1

T602 PARTIAL SIXTH FLOOR NEW TELECOM PLAN 2

T701 PARTIAL SEVENTH FLOOR NEW TELECOM PLAN 1

T702 PARTIAL SEVENTH FLOOR NEW TELECOM PLAN 2

T801 PARTIAL EIGHTH FLOOR NEW TELECOM PLAN 1

T802 PARTIAL EIGHTH FLOOR NEW TELECOM PLAN 2

T1001 ENLARGED TELECOMMUNICATIONS PLANS - 1

T1002 ENLARGED TELECOMMUNICATIONS PLANS - 2

T1003 ENLARGED TELECOMMUNICATIONS PLANS - 3

T1004 ENLARGED TELECOMMUNICATIONS PLAN - LIVING UNIT (TYPICAL)

T1101 CABLE TRAY DETAILS

T1102 TYPICAL TELECOMMUNICATION OUTLET DETAILS

T1103 CABLE TRAY AND TELECOMMUNICATION DETAILS

T1104 MISCELLANEOUS TELECOMMUNICATION DETAILS

T1201 DATA / TELECOMMUNICATION RISER DIAGRAM 1

T1202 DATA / TELECOMMUNICATION RISER DIAGRAM 2

T1203 DATA / TELECOMMUNICATION RISER DIAGRAM 3

T1204 TYPICAL TELECOMMUNICATIONS GROUNDING DIAGRAM

T1205 TELECOMMUNICATION DISTRIBUTION DIAGRAM 1

T1206 TELECOMMUNICATION DISTRIBUTION DIAGRAM 2

T1207 TELECOMMUNICATION DISTRIBUTION DIAGRAM 3

T1208 CATV RISER DIAGRAM 1

T1209 CATV RISER DIAGRAM 2

T1210 CATV RISER DIAGRAM 3

TELECOMMUNICATIONS

INDEX OF DRAWINGS

SHEET NO SHEET TITLE REV

E001 ELECTRICAL SYMBOL LIST, GENERAL ELECTRICAL NOTES

ES101 SITE ELECTRICAL PLAN (EXISTING/REMOVAL WORK)

ES102 SITE ELECTRICAL PLAN (EXISTING/NEW WORK)

ED101 FIRST FLOOR - LIGHTING PLAN (EXISTING/REMOVAL WORK)

ED102 SECOND FLOOR - LIGHTING PLAN (EXISTING/REMOVAL WORK)

ED103 THIRD TO FIFTH FLOORS - LIGHTING PLAN (EXISTING/REMOVAL WORK)

ED104 SIXTH TO EIGHTH FLOORS - LIGHTING PLAN (EXISTING/REMOVAL WORK)

ED105 ROOF - LIGHTING PLAN (EXISTING/REMOVAL WORK)

ED106 FIRST FLOOR - ELECTRICAL PLAN (EXISTING/REMOVAL WORK)

ED107 SECOND FLOOR - ELECTRICAL PLAN (EXISTING/REMOVAL WORK)

ED108 THIRD TO FIFTH FLOORS - ELECTRICAL PLAN (EXISTING/REMOVAL WORK)

ED109 SIXTH TO EIGHTH FLOORS - ELECTRICAL PLAN (EXISTING/REMOVAL WORK)

ED110 ROOF - ELECTRICAL PLAN (EXISTING/REMOVAL WORK)

ED401 TYPICAL UNIT - ELECTRICAL PLANS (EXISTING /REMOVAL WORK)

ED402 PARTIAL FIRST FLOOR - ELECTRICAL PLANS (EXISTING/REMOVAL WORK)

EL101 FIRST FLOOR - LIGHTING PLAN (EXISTING/NEW WORK)

EL102 SECOND FLOOR - LIGHTING PLAN (EXISTING/NEW WORK)

EL103 THIRD TO FIFTH FLOORS - LIGHTING PLAN (EXISTING/NEW WORK)

EL104 SIXTH TO EIGHTH FLOORS - LIGHTING PLAN (EXISTING/NEW WORK)

EL105 ROOF - LIGHTING PLAN (EXISTING/NEW WORK)

EL401 TYPICAL UNIT LIGHTING PLANS - NEW WORK

EL402 PARTIAL LIGHTING PLANS - NEW WORK

EL501 LIGHT FIXTURE SCHEDULE I

EL502 LIGHT FIXTURE SCHEDULE II

EL601 MISCELLANEOUS LIGHTING DIAGRAMS

EP101 FIRST FLOOR - ELECTRICAL PLAN (EXISTING/ NEW WORK)

EP102 SECOND FLOOR - ELECTRICAL PLAN (EXISTING/NEW WORK)

EP103 THIRD TO FIFTH FLOORS - ELECTRICAL PLAN (EXISTING/NEW WORK)

EP104 SIXTH TO EIGTH FLOORS - ELECTRICAL PLAN (EXISTING/NEW WORK)

EP105 ROOF - ELECTRICAL PLAN (EXISTING/ NEW WORK)

EP401 ELECTRICAL ROOMS - ELECTRICAL PLANS

EP402 TYPICAL UNIT ELECTRICAL PLANS - NEW WORK

EP403 TYPICAL ELECTRICAL PLANS (EXISTING/NEW WORK)

EP501 SITE ELECTRICAL DETAILS I

EP502 SITE ELECTRICAL DETAILS II

EP503 SITE ELECTRICAL DETAILS III

EP504 MISCELLANEOUS DETAILS I

EP505 MISCELLANEOUS DETAILS II

EP506 MISCELLANEOUS DETAILS III

EP601 ONE LINE DIAGRAM (EXISTING/REMOVAL WORK)

EP602 ONE LINE DIAGRAM (EXISTING/NEW WORK)

EP603 ELECTRIC PANEL RISER DIAGRAM I

EP604 ELECTRIC PANEL RISER DIAGRAM II

EP605 ELECTRICAL PANEL SCHEDULES I

EP606 ELECTRICAL PANEL SCHEDULES II

EP607 ELECTRICAL PANEL SCHEDULES III

EP608 ELECTRICAL PANEL SCHEDULES IV

EP801 POWER METER PROGRAMMING INSTRUCTIONS I

EP802 POWER METER PROGRAMMING INSTRUCTIONS II

EP803 ADVANCED METERING DETAILS

EP804 iLON SERVER ENCLOSURE DETAIL

ELECTRICAL

STA. 27

"Y" CUT

N = 64,563.93

E = 1,680,136.11

ELEV. = 73.93

STA. 38

MAG NAIL

N = 64,597.07

E = 1,679,778.02

ELEV. = 66.06

STA. 31

"Y" CUT

N = 64,450.10

E = 1,679,740.58

ELEV. = 64.42

STA. 32

"Y" CUT

N = 64,421.12

E = 1,679,900.55

ELEV. = 66.11 STA. 28

"Y" CUT

N = 64,391.43

E = 1,680,064.42

ELEV. = 70.40

B-2

B-1

B-3

B-4

E X

I S

T I N

G

C

O N

D I T

I O

N S

V-001

NOTES:

1. EXISTING CONDITIONS ARE BASED ON A TOPOGRAPHIC SURVEY PERFORMED BY

CONTROLPOINT SURVEYING, INC., IN FEBRUARY 5, 2020 AND FROM RECORD

DRAWINGS AND ARE NOT GUARANTEED. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS PRIOR TO START OF CONSTRUCTION.

2. TOPOGRAPHIC SURVEY IS BASED ON THE FOLLOWING:

NAD 1983 PA11 STATE PLANE HAWAII 3 FIPS 5103 FEET

GEODETIC VERTICAL DATUM: MEAN SEA LEVEL (MSL), LOCAL TIDAL DATUM,

1983-2001 TIDAL EPOCH

3. ALL HORIZONTAL AND VERTICAL CONTROLS FOR THIS PROJECT SHALL BE

ESTABLISHED USING THE BENCHMARKS INDICATED.

4. LOCATION OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND BASED ON BEST

AVAILABLE INFORMATION PROVIDED BY OTHERS.

5. ALL DIMENSIONS AND/OR DIMENSIONS SHOWN IN CALLOUTS/NOTES ARE IN FEET

UNLESS OTHERWISE NOTED.

6. SEE SHEET C-002 FOR LEGEND AND ABBREVIATIONS.

A1

EXISTING CONDITIONS

SCALE: 1"=20'

GRAPHIC SCALE:

40'0 20'

BLDG502

B O

W E

R S

A

N D

K

U B

O T

A

M A

N A

G E

M E

N T

A

K O

K I

S

T R

E E

T

W A

I P

A H

U

H

I

O P

T I O

N

T

I T

L E

O P

T I O

N

F

I E of Engineers ®

SHEET ID

S I Z

E

A N

S I

D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M

Y

C

O R

P

F

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

C T

S O

L I C

I T

A T

I O

N

N

O

B U

I L D

I N

G

K

A W

A M

U R

A

H

A L L

F Y

R

E P

A I

B

I L D

I N

G

W A

D

H O

N O

L U

S

T R

I C

T

F O

H A

F T

E R

H

I

J U

W A

D

N O

M L

H W

O P

T I O

N

F

I E

P

T I O

N

T

I T

T

A

S

U B

M I T

T A

L

B

U

I L

D

I

G

B

U

I

L

D

I

- 3.3-INCH OUTSIDE DIAMETER (2.4-INCH INSIDE DIAMETER) STAINLESS

STEEL SPLIT BARREL SAMPLER (RELATIVELY UNDISTURBED)

- 2.0-INCH OUTSIDE DIAMETER (1.4-INCH INSIDE DIAMETER)

SPT SPLIT SPOON SAMPLER

- 3.3-INCH OUTSIDE DIAMETER (2.4-INCH INSIDE DIAMETER)

STAINLESS STEEL SPLIT BARREL SAMPLER (DISTURBED)

- SAMPLE LOST DURING EXTRACTION

- CORE RUN

DRIVING ENERGY: 140-LB. DROPPING 30 INCHES

BORING LOGS LEGEND:

THE LOGS OF BORINGS INDICATE THE SUBSURFACE AND GROUNDWATER

CONDITIONS ENCOUNTERED ONLY AT THE LOCATIONS WHERE THE BORINGS WERE

DRILLED AND AT THE TIMES DESIGNATED ON THE LOGS, AND MAY NOT REPRESENT

CONDITIONS AT OTHER LOCATIONS OR AT OTHER TIMES. SUBSURFACE AND

GROUNDWATER CONDITIONS MAY DIFFER FROM THE LOGS DUE TO THE PASSAGE OF

TIME, IMPROVEMENTS CONSTRUCTED AT THE SITE, CHANGES IN SURFACE DRAINAGE

AND IRRIGATION PATTERNS, AND OTHER CHANGES.

THE BORING LOGS ARE FURNISHED FOR THE CONVENIENCE OF THE BIDDER. NO

ASSURANCE IS GIVEN THAT THE SUBSURFACE OR GROUNDWATER CONDITIONS

SHOWN ON THE BORING LOGS ARE REPRESENTATIVE OF THE CONDITIONS TO BE

ENCOUNTERED DURING CONSTRUCTION. THE BIDDER IS SOLELY RESPONSIBLE FOR

ALL ASSUMPTIONS, DEDUCTIONS, OR CONCLUSIONS WHICH HE MAY MAKE OR DERIVE

FROM HIS EXAMINATION OF THE SUBSURFACE INFORMATION AND DATA FURNISHED

HEREIN.

THE BLOW COUNTS FOR 3.3-INCH DIAMETER SPLIT BARREL SAMPLER REPRESENT

ACTUAL BLOW COUNTS FOR THE LAST 12 INCHES OF PENETRATION AND HAVE NOT

BEEN CONVERTED TO EQUIVALENT SPT-N VALUES.

NOTES:

MAJOR DIVISIONS GROUP NAMES

GW

GP

GM

SW

SP

SM

SC

ML

CL

OL

MH

CH

OH

PT

GC

HIGHLY ORGANIC SOILS

PEAT

ORGANIC SILT OR CLAY, ORGANIC SILT

OR CLAY WITH SAND OR GRAVEL, SANDY

OR GRAVELLY ORGANIC SILT OR CLAY

FAT CLAY, FAT CLAY WITH SAND OR

GRAVEL, SANDY OR GRAVELLY

FAT CLAY

ELASTIC SILT, ELASTIC SILT WITH SAND

OR GRAVEL, SANDY OR GRAVELLY

ELASTIC SILT

ORGANIC SILT OR CLAY, ORGANIC SILT

OR CLAY WITH SAND OR GRAVEL, SANDY

OR GRAVELLY ORGANIC SILT OR CLAY

LEAN CLAY, LEAN CLAY WITH SAND OR

GRAVEL, SANDY OR GRAVELLY LEAN CLAY

SILT, SILT WITH SAND OR GRAVEL,

SANDY OR GRAVELLY SILT

CLAYEY SAND, CLAYEY SAND

WITH GRAVEL

SILTY SAND, SILTY SAND WITH GRAVEL

POORLY GRADED SAND, POORLY

GRADED SAND WITH GRAVEL

WELL-GRADED SAND, WELL-GRADED

SAND WITH GRAVEL

CLAYEY GRAVEL, CLAYEY GRAVEL

WITH SAND

SILTY GRAVEL, SILTY GRAVEL

WITH SAND

POORLY GRADED GRAVEL,

POORLY GRADED GRAVEL WITH SAND

WELL-GRADED GRAVEL, WELL-GRADED

GRAVEL WITH SAND

CLEAN GRAVELS

LESS THAN

5% FINES

GRAVELS WITH

MORE THAN

12% FINES

CLEAN SAND

LESS THAN

5% FINES

SANDS WITH

MORE THAN

12% FINES

SILTS AND CLAYS

LIQUID LIMIT LESS THAN 50

SILTS AND CLAYS

LIQUID LIMIT 50 OR MORE

GRAVELS

MORE THAN

50% OF

COARSE

FRACTION

RETAINED ON

NO. 4 SIEVE

SANDS

50% OR MORE

OF COARSE

FRACTION

PASSES NO. 4

SIEVE

C O

A R

S E

G

R A

I N

I L

S

M O

A

N

T

A I N

N

O

E

V E

F I N

E G

R A

I N

I L

S

O

R

M

O R

E

P

A S

S E

S

N

O

E

V E

UNIFIED SOIL CLASSIFICATION SYSTEM - (ASTM D2487)

NOTE:

DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE CLASSIFICATIONS.

UNIFIED SOIL

CLASSIFICATION SYSTEM

REFER TO ASTM D2487 FOR BORDERLINE CLASSIFICATIONS GW-GM,

GW-GC, GP-GM, GP-GC, SW-SM, SW-SC, SP-SM, AND SP-SC.

MATERIAL

SIZE

SAND

FINE

MEDIUM

COARSE

GRAVEL

FINE

COARSE

COBBLES

BOULDERS

MILLIMETERS SIEVE SIZE ** MILLIMETERS SIEVE SIZE **

UPPER LIMITLOWER LIMIT

PARTICLE SIZE

0.075

0.425

2.00

4.75

19.0

75.0

#200 **

#40 **

#10 **

#4 **

3/4" *

3" *

12" *

0.425

2.00

4.75

19.0

75.0

3/4" *

3" *

12" *

** U.S. STANDARD SIEVE * SQUARE OPENINGS

0 10 20 30 40 50 60 70 80 90 100

CL- ML

ML OR OL

MH OR OH

CL OR OL

CH OR OH

N

E

PLASTICITY CHART

GRADATION CHART

P L

A S

T I C

I T

Y

I N

D E

X

P

I

LIQUID LIMIT (LL)

FOR CLASSIFICATION OF FINE-GRAINED SOILS

AND FINE-GRAINED FRACTION OF

COARSE-GRAINED SOILS

FINE-GRAINED SOILS

VERY SOFT

SOFT

MEDIUM STIFF

STIFF

VERY STIFF

HARD

LESS THAN 0.25

0.25 TO 0.5

0.5 TO 1.0

1.0 TO 2.0

2.0 TO 4.0

GREATER THAN 4.0

COARSE-GRAINED SOILS

THESE ARE USUALLY

BASED ON AN EXAMINATION

OF SOIL SAMPLES, AND

PENETRATION RESISTANCE.

VERY LOOSE

LOOSE

MEDIUM DENSE

DENSE

VERY DENSE

APPROXIMATE SHEAR STRENGTH IN KSF

UNIFIED SOIL

CLASSIFICATION SYSTEM

NOTE:

WHEN SHOWN ON THE BORING LOGS, THE FOLLOWING TERMS ARE USED TO

DESCRIBE THE CONSISTENCY OF FINE-GRAINED SOILS AND THE RELATIVE

COMPACTNESS OF COARSE-GRAINED SOILS.

#40 **

#10 **

#4 **

LETTER

SYMBOL

GRAPHIC

SYMBOL

BORING

NO.

UNIAXIAL COMPRESSIVE STRENGTH TEST (ROCK)

DEPTH

(FEET)

ROCK TYPE TEST METHOD

UNIAXIAL

COMPRESSIVE

STRENGTH

(PSI)

B-1

B-2

B-4

9.8

11.4

5.7

BASALT ASTM D7012

8,725*

12,090*

8,185*

BASALT

BASALT

ASTM D7012

ASTM D7012

*A CORRECTION FACTOR APPLIED DUE TO SAMPLE DIMENSION.

BLDG502

B O

W E

B

O T

A

M A

N A

G E

M E

N T

A

K O

K I

S

T R

E E

T

W A

I P

A H

U

H

I

O P

T I O

N

T

I T

P

T I O

N

F

I E of Engineers ®

SHEET ID

S I Z

E

A N

S I

D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M

Y

C

O R

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

B U

I L D

I N

G

K

A W

A M

U R

A

H

A L L

F Y

R

E P

A

I L D

I N

G

W A

D

H O

N O

L U

S

T R

I C

T

F O

A

F T

E R

H

I

J U

W A

D

O P

T I O

N

F

I E

P

T I O

N

T

I T

T

A

S

U B

M I T

T A

L

B O

R I N

G

L O

G E

T

E S

B-001

K F

M L

B-2

B-1

B-3

B-4

BLDG502

B O

W E

B

O T

A

M A

N A

G E

M E

N T

A

K O

K I

S

T R

E E

T

W A

I P

A H

U

H

I

O P

T I O

N

T

I T

P

T I O

N

F

I E of Engineers ®

SHEET ID

S I Z

E

A N

S I

D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M

Y

C

O R

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

B U

I L D

I N

G

K

A W

A M

U R

A

H

A L L

F Y

R

E P

A

I L D

I N

G

W A

D

H O

N O

L U

S

T R

I C

T

F O

A

F T

E R

H

I

J U

W A

D

N O

M L

H W

O P

T I O

N

F

I E

P

T I O

N

T

I T

T

A

S

U B

M I T

T A

L

B O

R I N

G

L

O C

A T

I O

N

P

L A

N

B-002

B-1

APPROXIMATE PGE BORING

LOCATION AND NUMBER

A1

BORING LOCATION PLAN

SCALE: 1"=20'

GRAPHIC SCALE:

40'0 20'

B

U

I L

D

I

B

U

I

L

D

I

LEGEND:

N O

BLDG502

O

W E

B

O T

A

M A

N A

G E

M E

N T

A

K O

K I

S

T R

E E

T

W A

I P

A H

U

H

I

O P

T I O

N

T

I T

P

T I O

N

F

I E of Engineers ®

SHEET ID

S I Z

E

A N

S I

D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M

Y

C

O R

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

B U

I L D

I N

G

K

A W

A M

U R

A

H

A L L

F Y

R

E P

A

I L D

I N

G

W A

D

H O

N O

L U

S

T R

I C

T

F O

A

F T

E R

H

I

J U

W A

D

N O

M L

H W

O P

T I O

N

F

I E

P

T I O

N

T

I T

T

A

S

U B

M I T

T A

L

B O

R I N

G

L

O G

S

BB001

N O

BLDG502

O

W E

B

O T

A

M A

N A

G E

M E

N T

A

K O

K I

S

T R

E E

T

W A

I P

A H

U

H

I

O P

T I O

N

T

I T

P

T I O

N

F

I E of Engineers ®

SHEET ID

S I Z

E

A N

S I

D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M

Y

C

O R

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

B U

I L D

I N

G

K

A W

A M

U R

A

H

A L L

F Y

R

E P

A

I L D

I N

G

W A

D

H O

N O

L U

S

T R

I C

T

F O

A

F T

E R

H

I

J U

W A

D

N O

M L

H W

O P

T I O

N

F

I E

P

T I O

N

T

I T

T

A

S

U B

M I T

T A

L

B O

R I N

G

L

O G

S

BB002

N O

A. DEGREE OF WEATHERING

THE FOLLOWING TERMS DESCRIBE THE CHEMICAL WEATHERING OF A ROCK:

FRESH: NO VISIBLE SIGN OF DECOMPOSITION OR DISCOLORATION. RINGS UNDER HAMMER IMPACT.

SLIGHTLY WEATHERED: SLIGHT DISCOLORATION INWARDS FROM OPEN FRACTURES, OTHERWISE SIMILAR TO FRESH.

MODERATELY WEATHERED: DISCOLORATION THROUGHOUT. WEAKER MINERALS SUCH AS FELDSPAR DECOMPOSED.

STRENGTH SOMEWHAT LESS THAN FRESH ROCK BUT CORES CANNOT BE BROKEN BY HAND OR SCRAPED BY KNIFE.

TEXTURE PRESERVED.

HIGHLY WEATHERED: MOST MINERALS SOMEWHAT DECOMPOSED. SPECIMENS CAN BE BROKEN BY HAND WITH EFFORT OR

SHAVED WITH KNIFE. CORE STONES PRESENT IN ROCK MASS. TEXTURE BECOMING INDISTINCT BUT FABRIC PRESERVED.

COMPLETELY WEATHERED: MINERALS DECOMPOSED TO SOIL BUT FABRIC AND STRUCTURE PRESERVED (SAPROLITE).

SPECIMENS EASILY CRUMBLED OR PENETRATED.

RESIDUAL SOIL: ADVANCED STATE OF DECOMPOSITION RESULTING IN PLASTIC SOILS. ROCK FABRIC AND STRUCTURE

COMPLETELY DESTROYED. LARGE VOLUME CHANGE RELATIVE TO FRESH ROCK.

B. HARDNESS

THE FOLLOWING TERMS DESCRIBE THE RESISTANCE OF A ROCK TO INDENTATION OR SCRATCHING:

VERY SOFT: CAN BE PEELED WITH A KNIFE, MATERIAL CRUMBLES UNDER FIRM BLOWS WITH THE SHARP END OF A

GEOLOGIC PICK.

SOFT: CAN JUST BE SCRAPED WITH A KNIFE, INDENTATIONS OF 2 TO 4 MM WITH FIRM BLOWS OF THE PICK POINT.

MEDIUM HARD: CANNOT BE SCRAPED OR PEELED WITH A KNIFE BUT CAN BE SCRATCHED WITH KNIFE POINT. HAND HELD

SPECIMEN BREAKS WITH FIRM BLOWS OF THE PICK.

HARD: DIFFICULT TO SCRATCH WITH KNIFE POINT, CANNOT BREAK HAND HELD SPECIMEN.

VERY HARD: CANNOT BE SCRATCHED WITH POCKET KNIFE.

C. ROCK FRACTURE CHARACTERISTICS

THE FOLLOWING TERMS DESCRIBE GENERAL FRACTURE SPACING OF A ROCK:

CRUSHED: LESS THAN 5 MICRONS (MECHANICAL CLAY) TO 0.05 FOOT.

INTENSELY FRACTURED: 0.05 TO 0.1 FOOT (CONTAINS NO CLAY).

HIGHLY FRACTURED: 0.1 TO 0.5 FEET.

MODERATELY FRACTURED: 0.5 TO 1.0 FEET

OCCASIONALLY FRACTURED: 1.0 TO 3.0 FEET

SLIGHTLY FRACTURED: GREATER THAN 3.0 FEET.

BASALT

BOULDERS

COBBLES

BRECCIA

CLAYSTONE

SILTSTONE

SANDSTONE

TUFF

CORAL (TYPE I)

CORAL (TYPE II)

CORAL (TYPE III)

CLINKER

VOID / CAVITY

GRAPHIC SYMBOLS

CONGLOMERATE

ROCK DESCRIPTION SYSTEM

CINDER

BLDG502

B O

W E

B

O T

A

M A

N A

G E

M E

N T

A

K O

K I

S

T R

E E

T

W A

I P

A H

U

H

I

O P

T I O

N

T

I T

P

T I O

N

F

I E of Engineers ®

SHEET ID

S I Z

E

A N

S I

D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M

Y

C

O R

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

B U

I L D

I N

G

K

A W

A M

U R

A

H

A L L

F Y

R

E P

A

I L D

I N

G

W A

D

H O

N O

L U

S

T R

I C

T

F O

A

F T

E R

H

I

J U

W A

D

N O

M L

H W

O P

T I O

N

F

I E

P

T I O

N

T

I T

T

A

S

U B

M I T

T A

L

B O

R I N

G

L

O G

S

S

Y M

B O

L S

A N

D

N

O T

E S

BB003

N O

FIRE DEPARTMENT CONNECTION

FLANGE END

FINISH FLOOR

FINISH FLOOR ELEVATION

FIRE HYDRANT

FINISHED GRADE

FLANGE

FEET PER SECOND

FEET

FOOTING

FIRE WATER

FDC

FE

FF

FFE

FH

FIN GR / FG

FL

FPS

FT

FTG

FW

GALLON

GALVANIZED

GATE VALVE

GAL

GALV

G.V.

HIGH DENSITY POLYETHYLENE

HEIGHT

HIGH POINT

HORIZONTAL

HDPE

HT, H

HPT

HORIZ / HOR

INVERT ELEVATION

INCHES

INVERT

INSIDE DIAMETER

IE

IN

INV

ID

L

LBS

LF

LOG

LP

LENGTH

POUNDS

LINEAR FEET

LIMITS OF GRADING

LIGHT POLE

MAX

MECH

MH

MIN

MJ

MSL

MTR

MAXIMUM

MECHANICAL

MANHOLE

MINIMUM

MECHANICAL JOINT

MEAN SEA LEVEL

METER

N

NGL

NO / #

NTS

NORTH

NATURAL GRADE LINE

NUMBER

NOT TO SCALE

O/S

OC

OD

OMD

OSHA

OFFSET

ON CENTER

OUTSIDE DIAMETER

OPERATIONS AND MAINTENANCE DIVISION

OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION

P

PAVT

PCF

POC

PP

PROF

PROP

PRV

PSI

PVC

PROPERTY LINE

PAVEMENT

POUND PER CUBIC FOOT

POINT OF CONNECTION

POWER POLE

PROFILE

PROPOSED

PRESSURE REDUCING VALVE

POUND PER SQUARE INCH

POLYVINYL CHLORIDE

L

R

RC

RD

REQD

RET

ROW

RPBP

RADIUS

REINFORCED CONCRETE

ROAD

REQUIRED

RETAINING

RIGHT-OF-WAY

REDUCED PRESSURE BACKFLOW PREVENTER

S

SF

SHT

SMH

STA

STD

STRUCT

SQ

SEWER, SLOPE

SQUARE FEET

SHEET

SEWER MANHOLE

STATION

STANDARD

STRUCTURAL

SQUARE

TE

TOC / TC

TOS

TMH

TMK

TV

TW

TYP

TOP ELEVATION

TOP OF CURB

TOP OF CONCRETE SLAB/TOP OF STEP

TELECOMMUNICATION MANHOLE

TAX MAP KEY

TOP VERTICAL

TOP OF WALL

TYPICAL

UC

UE

USAG-HI

UT

UNDERGROUND CABLE

UNDERGROUND ELECTRICAL

UNITED STATES ARMY GARRISON-HAWAII

UNDERGROUND TELEPHONE

VB

V, VERT

VALVE BOX

VERTICAL

W

W/

WL

WV

WWF

WATER, WEST

WITH

WATERLINE

WATER VALVE

WELDED WIRE FABRIC

LEGEND:

PROPERTY LINE

PROJECT LIMITS

CONTOUR MINOR

CONTOUR MAJOR

LIMITS OF GRADING

COMPOST FILTER SOCK

SURFACE FLOW

ELECTRICAL LINE

GAS LINE

DRAINLINE & SIZE

DRAIN MANHOLE (DMH)

DROP INLET

SEWERLINE & SIZE

WATERLINE & SIZE

HIGH PRESSURE

WATERLINE & SIZE

FIRE LINE & SIZE

BUILDING OR STRUCTURE

CONCRETE SIDEWALK

S8

W6

EXISTING NEW

AND

AT

AREA

ASPHALTIC CONCRETE

AGGREGATE

AMERICAN NATIONAL STANDARDS INSTITUTE

APPROXIMATE

AMERICAN SOCIETY FOR TESTING & MATERIALS

AMERICAN WATER WORKS ASSOCIATION

A

A.C.

AGGR

ANSI

APPROX

ASTM

AWWA

ABBREVIATIONS:

BACKFLOW PREVENTER

BUILDING

BEST MANAGEMENT PRACTICES

BOTTOM OF CURB

BOTTOM

BOTTOM VERTICAL

BOTTOM OF WALL

BFP

BLDG

BMPS

BOC / BC

BOT

BV

BW

CENTERLINE

CATCH BASIN

CATCH BASIN MANHOLE

CUBIC FEET PER SECOND

CAST IRON

CLEAR / CLEARANCE

CONCRETE MASONRY UNIT

CLEANOUT

CONCRETE

CONNECTION

CONTINUOUS

CONTRACTING OFFICER'S REPRESENTATIVE

CONTRACTOR OPERATING AND STORAGE AREA

CLEANOUT-TO-GRADE

CUBIC

CUBIC YARDS

L

C

CB

CBMH

CFS/cfs

CI

CLR

CMU

CO

CONC

CONN

CONT

COR

COSA

COTG

CU

CU YD

DETAIL

DUCTILE IRON, DRAIN INLET, DROP INLET

DIAMETER

DRAIN MANHOLE

DEPARTMENT OF PUBLIC WORKS

DRAIN

DRAWING

DET

DI

DIA / Ø

DMH

DPW

DR

DWG

EAST, ELECTRICAL

EXIST DRAIN

EXISTING GROUND

EXPANSION JOINT

ELEVATION

EXIST SEWER

END OF WALL

EXIST WATER / EACH WAY

EXISTING

E

ED

EG

EJ

EL, ELEV

ES

EOW

EW

EXIST

F6

E5

B-1

BORING LOCATION

AND NUMBER

BLDG502

B O

W E

B

O T

A

M A

N A

G E

M E

N T

A

K O

K I

S

T R

E E

T

W A

I P

A H

U

H

I

O P

T I O

N

T

I T

P

T I O

N

F

I E of Engineers ®

SHEET ID

S I Z

E

A N

S I

D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M

Y

C

O R

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

B U

I L D

I N

G

K

A W

A M

U R

A

H

A L L

F Y

R

E P

A

I L D

I N

G

W A

D

H O

N O

L U

S

T R

I C

T

F O

A

F T

E R

H

I

J U

W A

D

N O

M L

H W

O P

T I O

N

F

I E

P

T I O

N

T

I T

T

A

S

U B

M I T

T A

L

L E

G E

B

R E

V I A

T I O

N

C-002

APPROXIMATE

PROJECT LIMITS

20.00'

STABILIZED CONSTRUCTION

ENTRANCE-1, SEE NOTE 1

AND DETAIL

COMPOST

FILTER SOCK,

SEE DETAIL

Y

C A S E Y S T R E E T

STABILIZED CONSTRUCTION

ENTRANCE-2, SEE NOTES 1 & 2

AND DETAIL

COMPOST FILTER SOCK

AROUND DRAIN INLET

APPROXIMATE

PROJECT LIMITS

DRAIN INLET

PROTECTION

SEE DETAIL

TYP.

A7

C-003

PROVIDE

COMPOST FILTER

SOCK AROUND

DRAIN INLET

A15

C-003

H1

C-004

J10

C-004

CURB INLET

PROTECTION,

SEE DETAIL

K16

C-003

CURB INLET

PROTECTION

FILTER FABRIC SPECIFICATIONS:

MECHANICAL PROPERTIES

GRAB TENSILE STRENGTH

GRAB TENSILE ELONGATION

PUNCTURE STRENGTH

MULLEN BURST STRENGTH

TRAPEZOIDAL TEAR STRENGTH

UV RESISTANCE

APPARENT OPENING SIZE

FLOW RATE

PERMITTIVITY

TEST METHOD

ASTM D 4632

ASTM D 4632

ASTM D 4833

ASTM D 3786

ASTM D 4533

ASTM D 4355

ASTM D 4751

ASTM D 4491

ASTM D 4491

l/min/m

(gal/min/ft sec

-1 mm (US Std Sieve) kN (lbs) kPa (psi) kN (lbs) kN (lbs)

TEST METHOD

MINIMUM AVERAGE

ROLL VALUE

1.62 (365) X 0.89 (200)

24 x 10

0.40 (90)

3097 (450)

0.51 (115) x 0.33 (75)

0.425 (40)

5907 (145)

2.1

VELCRO

CLOSURE

DRAIN INLET

GRATE

LIFT STRAPS

USED FOR EASY

MOVEMENT AND

INSPECTION OF

UNIT

PLAN

SECTION

DRAIN INLET

GRATE

WRAP SEDIMENT

FILTER AROUND

GRATE

DRAIN

INLET

NOTE:

SEE SPECIFICATIONS THIS SHEET.

A7

NOT TO SCALE

DRAIN INLET PROTECTION DETAIL

NOTES:

1. THE CONTRACTOR SHALL REMOVE FILTERS DURING TIMES OF ABOVE

NORMAL RAINFALL EVENTS AND REPLACE THEM AFTER EVENT HAS

PASSED.

2. THE CONTRACTOR SHALL INSPECT ALL CATCH BASIN/INLETS AND

REMOVE ACCUMULATED SILT AND DEBRIS. FLUSHING IS PROHIBITED.

OVERFLOW GAP

VARIES WITH DIAMETER OR

DAM & HOOD HEIGHT

CURB INLET

INLET

CURB

3" DIA. DAM

AGGREGATE POUCH

K16

NOT TO SCALE

CURB INLET PROTECTION DETAIL

FILL POUCH

HALF-FULL WITH #3

COARSE AGGREGATE

LOW PROFILE WITH

GUTTER FOR SAFETY &

CURB APPEAL

WOVEN MONOFILAMENT

24.00' MIN.

3" MIN. TO 6" COARSE AGGREGATE

OR LARGER (7" MAX), 12" THICK

M

I N

24.00'' MIN.

GEOTEXTILE FILTER FABRIC

(SEE TABLE BELOW)

EXIST. PAVED AREA

EXIST. CONC.

DRIVEWAY

EXIST. BASE

COURSE

GEOTEXTILE REQUIREMENTS

PHYSICAL PROPERTY REQUIREMENTS

GRAB TENSILE STRENGTH

ELONGATION FAILURE

MULLEN BURST STRENGTH

PUNCTURE STRENGTH

EQUIVALENT OPENING

220 LB (ASTM D1682)

60% (ASTM D1682)

430 LB (ASTM D3768)

125 LB (ASTM D751, MODIFIED)

SIZE 40-80 (U.S. STD SIEVE, CW-02215)

A15

NOT TO SCALE

STABILIZED CONSTRUCTION ENTRANCE-1

3" MIN. TO 6" COARSE

AGGREGATE OR LARGER

(7" MAX), 12" THICK

(SEE NOTE BELOW)

EXIST. PAVED AREA

PLAN SECTION A-A

12" COARSE AGGREGATE LAYER SHALL BE REMOVED IMMEDIATELY PRIOR TO INSTALLATION

OF ROADWAY BASE COURSE.

NOTE:

A A

MAINTENANCE REQUIREMENTS:

1. INSPECT MONTHLY AND AFTER EACH RAINFALL EXCEEDING 0.25 INCH IN A 24-HOUR

PERIOD.

2. REMOVE ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS BY SWEEPING OR VACUUMING

EACH DAY BEFORE LEAVING THE JOB SITE.

3. REMOVE AGGREGATES, AND FILTER FABRIC AT COMPLETION OF CONSTRUCTION.

D4

SCALE: 1"=20'

EROSION CONTROL PLAN

APPROXIMATE PROJECT LIMITS

COMPOST FILTER SOCK

EXIST. SURFACE FLOW

DRAIN INLET PROTECTION

STABILIZED CONSTRUCTION ENTRANCE

LEGEND:

NOTES:

1. THE CONTRACTOR SHALL PROVIDE A STABILIZED CONSTRUCTION ENTRANCE WHERE CONSTRUCTION

VEHICLES WILL BE TRAVELING FROM PAVED TO UNPAVED SURFACES AND VISE VERSA.

2. REMOVE PORTION OF EXISTING CURB BETWEEN LANDSCAPE AREA AND DRIVEWAY TO INSTALL STABILIZED

CONSTRUCTION ENTRANCE. RESTORE CURB AT THE END OF CONSTRUCTION.

3. SEE SHEET C-001 FOR NPDES NOTES.

E R

O S

I O

N

C

O N

T R

A

N

C-003

GRAPHIC SCALE:

40'0 20'

BLDG502

B O

W E

B

O T

A

M A

N A

G E

M E

N T

A

K O

K I

S

T R

E E

T

W A

I P

A H

U

H

I

O P

T I O

N

T

I T

P

T I O

N

F

I E of Engineers ®

SHEET ID

S I Z

E

A N

S I

D

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

M

Y

C

O R

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

B U

I L D

I N

G

K

A W

A M

U R

A

H

A L L

F Y

R

E P

A

I L D

I N

G

W A

D

H O

N O

L U

S

T R

I C

T

F O

A

F T

E R

H

I

J U

W A

D

N O

M L

H W

O P

T I O

N

F

I E

P

T I O

N

T

I T

T

A

S

U B

M I T

T A

L

B

U

I L

D

I

B

U

I

L

D

I

ENTRANCE

M A

X

M I N

LIMITS OF GRADING

STAKE ANCHOR WHERE REQUIRED

SEE NOTES 3 AND 4, TYP.

RUNOFF

FLOW

WORK AREA

COMPOST FILTER SOCK

8" MINIMUM DIAMETER

6" MIN

OVERLAP

WORK AREA

RUNOFF

FLOW

COMPOST FILTER

SOCK, TYP

STAKE ANCHOR,

(TYP) SEE NOTE 3

STAKE ANCHOR,

SPACING SEE NOTE 4

LIMITS OF

GRADING

ON > 2H:1V SLOPE

STAKE ON WORK AREA

SIDE TO BE INSTALLED

IN CENTER OF COMPOST

FILTER SOCK

SECTION

PLAN

1. COMPOST SHALL NOT CONTAIN BIOSOLIDS.

2. REMOVE SEDIMENT FROM THE UP SLOPE SIDE OF THE COMPOST FILTER SOCK WHEN ACCUMULATION HAS REACHED 1/3 OF THE

EFFECTIVE HEIGHT.

3. 3/4"x3/4"x16" MINIMUM WOODEN STAKE ANCHOR. FOR PAVEMENT AREAS USE SAND BAGS (18"x12"x3" MIN) IN PLACE OF STAKES.

4. ON < 4H:1V SLOPE, NO STAKE ANCHOR REQUIRED.

ON 4H:1V TO 3H:1V SLOPE, STAKE AT 10 FT ON CENTER.

ON 3H:1V TO 2H:1V SLOPE, STAKE AT 5 FT TO 10 FT ON CENTER.

ON > 2H:1V SLOPE, STAKE AT 5 FT ON CENTER, STAKES ON WORK AREA SIDE SHALL BE INSTALLED IN CENTER OF COMPOST FILTER SOCK.

NOTES:

O

R

M A

X

A

L L O

W E

D

T

E

20.00' MIN

CORRUGATED

STEEL PANELS

DIRECTION

OF TRAVEL

PLAN SECTION A-A

FILTER

FABRIC

9" MIN. THICK

BEACH SAND

CORRUGATED

STEEL PANELS

INSTALLATION/APPLICATION CRITERIA:

1. CONSTRUCT ON LEVEL GROUND WHERE POSSIBLE.

2. PROIVIDE 9"MIN. THICK BEACH SAND UNDER STABILIZED CONSTRUCTION ENTRANCE,

TAPERED TO GRADE AT EDGES TO PROTECT LARGE SURFACE ROOTS.

3. LENGTH SHOULD BE 24' MIN. OR MAX. ALLOWED BY THE SITE, AND COVERED THE ENTIRE

WIDTH (20' MIN.)

4. PROVIDE ADEQUATE PROTECTION FOR ANY UNDERGROUND UTILITIES.

MAINTENANCE REQUIREMENTS:

1. INSPECT MONTHLY AND AFTER EACH RAINFALL EXCEEDING 0.25 INCH IN A 24-HOUR

PERIOD.

2. REMOVE ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS WITHIN 24 HOURS.

3. REMOVE CORRUGATED STEEL PANELS, SAND, AND FILTER FABRIC AT COMPLETION OF

CONSTRUCTION.

PAVED AREA/ROAD

UNPAVED AREA

A

A

H1

NOT TO SCALE

COMPOST FILTER SOCK DETAIL

J10

NOT TO SCALE

STABILIZED CONSTRUCTION ENTRANCE-2

1. STREET SWEEPING AND VACUUMING. ALL POLLUTANTS DISCHARGED

FROM CONSTRUCTION SITE TO OFF-SITE AREAS MUST BE SWEPT OR

VACUUMED EACH DAY BEFORE LEAVING THE JOB SITE.

2. MATERIALS DELIVERY, STORAGE AND USE MANAGEMENT. PREVENT OR

ELIMINATE THE DISCHARGE OF POLLUTANTS FROM MATERIAL DELIVERY,

STORAGE, AND USE TO THE STORM WATER SYSTEM OR WATERCOURSES

BY MINIMIZING THE STORAGE OF HAZARDOUS MATERIALS ONSITE,

STORING MATERIALS IN A DESIGNATED AREA, INSTALLING SECONDARY

CONTAINMENT. CONSTRUCTION MATERIALS, WASTE, TOXIC AND

HAZARDOUS SUBSTANCES, STOCKPILES AND OTHER SOURCES OF

POLLUTION SHALL NOT BE STORED IN BUFFER AREAS, NEAR AREAS OF

CONCENTRATED FLOW, OR AREAS ABUTTING THE EXISTING MS4,

RECEIVING WATERS, OR DRAINAGE IMPROVEMENTS THAT DISCHARGE

OFF-SITE. PRIMARY AND SECONDARY CONTAINMENT CONTROLS AND

COVERS SHALL BE IMPLEMENTED TO THE MAXIMUM EXTENT POSSIBLE.

3. SPILL PREVENTION AND CONTROL. CREATE AND IMPLEMENT SPILL

PREVENTION AND RESPONSE PLANS TO ELIMINATE AND MINIMIZE THE

DISCHARGE OF POLLUTANTS TO THE MS4 AND RECEIVING WATERS FROM

LEAKS AND SPILLS BY REDUCING THE CHANCE FOR SPILLS, ABSORBING,

CONTAINING, AND CLEANING UP SPILLS AND PROPERLY DISPOSING OF

SPILL MATERIALS. AT A MINIMUM, ALL PROJECTS SHALL CLEANUP ALL

LEAKS AND SPILLS IMMEDIATELY.

4. HAZARDOUS MATERIALS. PREVENT OR REDUCE THE DISCHARGE OF

POLLUTANTS TO STORM WATER FROM HAZARDOUS WASTE THROUGH

PROPER MATERIAL USE AND WASTE DISPOSAL. IN THE EVENT THAT

HAZARDOUS MATERIALS ARE DISCHARGED TO THE MS4, THE

CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING

OFFICER'S REPRESENTATIVE (COR).

5. VEHICLE AND EQUIPMENT CLEANING. ELIMINATE AND MINIMIZE THE

DISCHARGE OF POLLUTANTS TO STORM WATER FROM VEHICLE AND

EQUIPMENT CLEANING OPERATIONS BY USING OFF-SITE FACILITIES

WHEN FEASIBLE, WASHING IN DESIGNATED, CONTAINED AREAS ONLY,

AND ELIMINATING DISCHARGES TO THE MS4 BY EVAPORATING AND/OR

TREATING WASH WATER, AS APPROPRIATE OR INFILTRATING WASH

WATER FOR EXTERIOR CLEANING ACTIVITIES THAT USE WATER ONLY.

6. VEHICLE AND EQUIPMENT FUELING. PREVENT FUEL SPILLS AND LEAKS BY

USING OFF-SITE FACILITIES, FUELING ONLY IN DESIGNATED AREAS,

ENCLOSING OR COVERING STORED FUEL, AND IMPLEMENTING SPILL

CONTROLS SUCH AS SECONDARY CONTAINMENT AND ACTIVE MEASURES

USING SPILL RESPONSE KITS.

7. VEHICLE AND EQUIPMENT MAINTENANCE. ELIMINATE AND MINIMIZE THE

DISCHARGE OF POLLUTANTS TO STORM WATER FROM VEHICLE AND

GOOD HOUSKEEPING BMPS:

EQUIPMENT MAINTENANCE OPERATIONS BY USING OFF-SITE FACILITIES

WHEN FEASIBLE, PERFORMING WORK IN DESIGNATED AREAS ONLY,

USING SPILL PADS UNDER VEHICLES AND EQUIPMENT, CHECKING FOR

LEAKS AND SPILLS, AND CONTAINING AND CLEANING UP SPILLS

IMMEDIATELY.

8. SOLID WASTE MANAGEMENT. PREVENT OR REDUCE DISCHARGE OF

POLLUTANTS TO THE LAND, GROUNDWATER, AND IN STORM WATER

FROM SOLID WASTE OR CONSTRUCTION AND DEMOLITION WASTE BY

PROVIDING DESIGNATED WASTED COLLECTION AREAS, COLLECT SITE

TRASH DAILY, AND ENSURING THAT CONSTRUCTION WASTE IS

COLLECTED, REMOVED, AND DISPOSED OF ONLY AT AUTHORIZED

DISPOSAL AREAS.

9. SANITARY/SEPTIC WASTE MANAGEMENT. TEMPORARY AND PORTABLE

SANITARY AND SEPTIC WASTE SYSTEMS SHALL BE MOUNTED OR STAKED

IN, WELL-MAINTAINED AND SCHEDULE FOR REGULAR WASTE DISPOSAL

AND SERVICING. SOURCES OF SANITARY AND/OR SEPTIC WASTE SHALL

NOT BE STORED NEAR THE MS4 OR RECEIVING WATERS.

10. STOCKPILE MANAGEMENT. STOCKPILES SHALL NOT BE LOCATED IN

DRAINAGE WAYS, AND WITHIN 50 FEET FROM AREAS OF CONCENTRATED

FLOWS. COMPOST FILTER SOCK OR SILT FENCES SHALL BE USED

AROUND THE BASE OF ALL STOCKPILES. STOCKPILES SHALL NOT

EXCEED 15 FEET IN HEIGHT. STOCKPILES GREATER THAN 15 FEET IN

HEIGHT SHALL REQUIRE 8 FOOT WIDE BENCHING. STOCKPILES MUST BE

COVERED WITH PLASTIC SHEETING OR A COMPARABLE MATERIAL IF

THEY WILL NOT BE ACTIVELY USED WITHIN 7 DAYS.

11. LIQUID WASTE MANAGEMENT. LIQUID WASTE SHALL BE CONTAINED IN A

CONTROLLED AREA SUCH AS A HOLDING PIT, SEDIMENT BASIN, ROLL-OFF

BIN, OR PORTABLE TANK OF SUFFICIENT VOLUME AND TO CONTAIN THE

LIQUID WASTES GENERATED. CONTAINMENT AREAS OR DEVICES MUST

BE IMPERMEABLE AND LEAK FREE AND SHOULD NOT BE LOCATED

WHERE ACCIDENTAL RELEASE OF THE CONTAINED LIQUID CAN

DISCHARGE TO WATER BODIES, CHANNELS, OR STORM DRAINS.

12. CONCRETE WASTE MANAGEMENT. PREVENT THE DISCHARGE OF

POLLUTANTS TO STORM WATER FROM CONCRETE WASTE BY

CONDUCTING WASHOUT OFFSITE OR PERFORMING ONSITE WASHOUT IN

A DESIGNATED AREA CONSTRUCTED AND MAINTAINED IN SUFFICIENT

QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE

GENERATED BY WASHOUT OPERATIONS. PLASTIC LINING MATERIAL

SHOULD BE A MINIMUM OF 10 MILLIMETER POLYETHYLENE SHEETING

AND SHOULD BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT

COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. CONTAINMENT

AREAS OR DEVICES SHOULD NOT BE LOCATED WHERE ACCIDENTAL

RELEASE OF THE CONTAINED LIQUID CAN DISCHARGE TO WATER BODIES,

CHANNELS, OR STORM DRAINS. WASHOUT FACILITIES MUST BE CLEANED,

OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE ONCE

THE WASHOUT IS 75 PERCENT FULL. ONCE

CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND

ALLOWED TO HARDEN, THE CONCRETE SHOULD BE BROKEN UP,

REMOVED, AND DISPOSED OF AS SOLID WASTES.

13. CONTAMINATED SOIL MANAGEMENT. AT MINIMUM CONTAIN

CONTAMINATED MATERIAL SOIL BY SURROUNDING WITH IMPERMEABLE

LINED BERMS OR COVER EXPOSED CONTAMINATED MATERIAL WITH

PLASTIC SHEETING. CONTAMINATED SOIL SHOULD BE DISPOSED OF

PROPERLY IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS.

1. CONSTRUCTION SHALL BE SEQUENCED WHERE APPLICABLE TO MINIMIZE THE

EXPOSURE TIME OF CLEARED SURFACE AREA.

2. MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS SHALL BE IN PLACE

AND FUNCTIONAL BEFORE THE COMMENCEMENT OF CLEARING, GRADING OR

EXCAVATION ACTIVITIES AND AT ALL TIMES DURING THE COURSE OF THE WORK.

3. MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS SHALL BE CHECKED

AND REPAIRED AS NECESSARY AT LEAST ONCE A WEEK AND DAILY AFTER ANY

RAINFALL EXCEEDING 0.25 INCH IN A 24-HOUR PERIOD.

4. ALL POLLUTANTS AND MATERIALS THAT ARE DROPPED, WASHED, TRACKED,

SPILLED, OR OTHERWISE DISCHARGED FROM THE PROJECT SITE TO OFF-SITE

STREETS, OTHER PAVED AREAS & SIDEWALKS MUST BE CLEANED USING DRY

METHODS SUCH AS SWEEPING OR VACUUMING .

5. DUST CONTROL SHALL BE IMPLEMENTED BY LIGHTLY SPRAYING EXPOSED SOIL

SURFACE WITH WATER. DO NOT OVERWATER.

6. FUELING AND/OR REPAIR OF CONSTRUCTION EQUIPMENT SHALL BE RESTRICTED

TO AN AREA WHERE SPILL CAN BE CONTROLLED AND CLEANED UP.

7. THE EROSION CONTROL PLAN ILLUSTRATES CONCEPTUAL EROSION CONTROL

MEASURES TO BE IMPLEMENTED DURING CONSTRUCTION AND PRIOR TO THE

COMMENCEMENT OF ANY GROUND DISTURBANCE, INCLUDING DEMOLITION WORK.

THE CONTRACTOR SHALL CREATE WORK-SPECIFIC EROSION CONTROL PLAN TO

PREVENT EROSION FROM CONSTRUCTION ACTIVITIES AND PREVENT POLLUTION

INTO STATE WATERS.

8. THE CONTRACTOR SHALL INSTALL DRAIN INLET PROTECTION TO ALL INLETS IN THE

VICINITY THAT MAY BE AFFECTED BY CONSTRUCTION RUNOFF PRIOR TO THE

COMMENCEMENT OF CONSTRUCTION WORK.

9. THE CONTRACTOR SHALL COORDINATE STAGING AREAS WITH THE COR. THE

CONTRACTOR SHALL PROVIDE A CONSTRUCTION INGRESS/EGRESS TO HIS

STAGING AREA.

10. EXPOSED TRENCHED AREAS SHALL BE PROTECTED FROM RUNOFF AND WIND

EROSION WITH STEEL PLATE COVERS UNTIL REPAVING CAN BE ACCOMPLISHED.

11. DRAIN INLET PROTECTION SHALL BE MONITORED PERIODICALLY AND/OR AFTER

SIGNIFICANT RAINFALL EVENTS 0.25 INCHES OR GREATER FOR STRUCTURAL

INTEGRITY AND SEDIMENT BUILD-UP. DAMAGE OR IMPROPERLY FUNCTIONING

FILTERS SHALL BE REPLACED (PAID FOR BY THE CONTRACTOR) AND SEDIMENT

ACCUMULATION SHALL BE REMOVED. AFTER EARTHWORK OPERATIONS EXISTING

CATCH BASINS AND DRAIN MANHOLES SURROUNDING THE PROJECT SITE SHALL BE

INSPECTED AND ACCUMULATED SEDIMENT SHALL BE REMOVED. FLUSHING INTO

THE CATCH BASINS AND DRAIN MANHOLES ARE PROHIBITED.

12. THE FINAL LIFT OF EACH DAY'S WORK SHALL BE COMPACTED TO PREVENT EROSION

OF FILL MATERIAL.

13. CONTRACTOR SHALL ENSURE ROADWAYS WILL BE PROTECTED FROM MUD, DIRT,

AND DEBRIS.

14. ALL BEST MANAGEMENT PRACTICES (BMPS) SHALL NOT BE REMOVED UNTIL

PROJECT COMPLETION.

15. WASTEWATER FROM WASHDOWNS OF CONSTRUCTION EQUIPMENT, VEHICLES, AND

CONCRETE TRUCK DRUMS SHALL NOT BE DISCHARGED INTO DRAINAGE SYSTEMS

OR STATE WATERS.

16. THE CONTRACTOR SHALL ENSURE THAT ALL TIRES OF CONSTRUCTION VEHICLES

ARE SUFFICIENTLY CLEANED OFF SO THAT DIRT OR DEBRIS IS NOT TRACKED OFF

THE CONSTRUCTION SITE. WASHING OFF TIRES WITH WATER WILL NOT BE

ACCEPTABLE UNLESS THE RUNOFF IS CONTAINED AND DOES NOT ENTER THE

STORM DRAIN SYSTEM.

17. AT THE CONCLUSION OF ALL PROJECT WORK, ALL BEST MANAGEMENT PRACTICES

SHALL BE REMOVED AND THE AREA SHALL BE RESTORED TO ITS ORIGINAL

CONDITION, OR BETTER, UPON ACCEPTANCE OF THE PROJECT BY THE

CONTRACTING OFFICER.

18. ALL DISTURBED AREAS SHALL RECEIVE TEMPORARY STABILIZATION WITHIN 14

CALENDAR DAYS OF INITIAL DISTURBANCE.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .