00 01 10 - 1 PROJECT TABLE OF CONTENTS
SPECIFICATIONS FOR CONSTRUCTION
REPLACE FUEL STORAGE TANKS
DESC1704
DEFENSE FUEL SUPPLY POINT KWAJALEIN ATOLL
MARSHALL ISLANDS
PROJECT TABLE OF CONTENTS
VOLUME 1 OF 2 – DIVISION 00 - 21
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 10 PROJECT TABLE OF CONTENTS
DIVISION 00 SPECIFICATIONS ARE UNDER SEPARATE COVER
DIVISION 01 - GENERAL REQUIREMENTS
01 32 00 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
REGISTER SUBMITTAL REGISTER
01 33 29 SUSTAINABILITY REPORTING
01 33 29AT HIGH PERFORMANCE SUSTAINABLE BUILDING PERFORMANCE CHECKLIST
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMINATED SITES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 RMS3 - CONTRACTOR MODE (RMS3/CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 45 35AT STATEMENT OF AND SCHEDULE OF SPECIAL INSPECTIONS
01 57 20 ENVIRONMENTAL PROTECTION
01 57 23 STORM WATER POLLUTION PREVENTION MEASURES
01 62 35 RECYCLE/RECOVERED MATERIAL
01 74 19 CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL SYSTEMS
01 90 00 MISCELLANEOUS PROVISIONS
01 90 00DPA DIG PERMIT APPLICATION
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 41 00AT SPI 1264 - SOLID WASTE SEGREGATION, STORAGE AND COLLECTION
PLAN
02 82 13.00 10 ASBESTOS ABATEMENT
02 82 13.00 10LAB LEAD AND ASBESTOS SURVEY
02 83 13.00 20 LEAD IN CONSTRUCTION
Am #0003
00 01 10 - 2 PROJECT TABLE OF CONTENTS
DIVISION 03 - CONCRETE
03 01 30.71 CONCRETE REHABILITATION
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS (BREAK AND
LAUNDRY ROOMS)
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 60 00 FLASHING AND SHEET METAL
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 16 ALUMINUM DOORS AND FRAMES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
00 01 10 - 3 PROJECT TABLE OF CONTENTS
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 90 COLOR SCHEDULE
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 PORCELAIN TILING
09 51 00 ACOUSTICAL CEILINGS
09 90 00 PAINTS AND COATINGS
09 97 02.05 PAINTING: COATING CONTAINMENT WALLS AND GENERAL COATING OF
EXTERIOR CONTRETE WALLS
09 97 02.05AT1 RECLAIMED WATER MONTHLY MONITORING REPORT-SEPT 2016
09 97 02.05AT2 WATER STATISTICS-SEPTEMBER 2016
09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL PETROLEUM
FUEL TANKS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 14 00.20AT INTERIOR SIGNAGE ATTACHMENTS
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
[*Am-3]
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 35 70 LABORATORY CASEWORK
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
VOLUME 2 OF 2 – DIVISION 22 - 46
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
00 01 10 - 4 PROJECT TABLE OF CONTENTS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 23 00 REFRIGERANT PIPING
23 82 02.00 10 UNITARY COOLING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 01 01 DEEP SOIL MIXING
31 05 21 GEOGRID SOIL REINFORCEMENT
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 15 00 AGGREGATE SURFACE COURSE
32 16 13 CONCRETE SIDEWALKS AND CURBS
32 31 13.53 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 01 50.01 CLEANING FUEL STORAGE TANKS
33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP
33 09 53 AVIATION FUEL ANNUNCIATOR / EPDS SYSTEM
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 32 13.10 24 LIFT STATION
33 40 00 CONTAINMENT DRAINAGE SYSTEM
33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT
00 01 10 - 5 PROJECT TABLE OF CONTENTS
33 52 43.13 AVIATION FUEL PIPING
33 52 43.14 AVIATION FUEL CONTROL VALVES
33 52 43.23 AVIATION FUEL PUMPS
33 52 43.28 FILTER SEPARATOR, AVIATION FUELING SYSTEM
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 56 13.13 STEEL TANKS WITH FIXED ROOFS
33 56 13.15 UNDERTANK INTERSTITIAL SPACE
33 56 19 FUEL IMPERMEABLE LINER SYSTEM
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
[*Am-3] Appendix A – Final Geotechnical Report and Deep Soil Mixing Report Appendix B – API 653 Tank Inspection Reports (Available Information)
-- End of Project Table of Contents --
This page was intentionally left blank for duplex printing.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 73 PAGES
Replace Fuel StorageTanks, Kwajalein Atoll, Marshall Islands
01 32 00 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
SD-06 Test Reports 3.5.2Narrative Report 3.5.1Schedule Reports 3.6.2Periodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
3.1 GSubmittal Register
3.5.1Monthly Updates
01 33 29 SD-01 Preconstruction Submittals
1.5.2.1 GPreliminary Sustainability
Notebook 1.5.2.1Preliminary High Performance and Sustainable Building Checklist SD-11 Closeout Submittals
1.5.2.1 GFinal Sustainability Notebook
1.5.2.1 GFinal High Performance and
Sustainable Building Checklist 01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 73 PAGES
01 35 26 SD-07 Certificates 1.6.1.5Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8 GActivity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance
01 35 29.13 SD-02 Shop Drawings
1.16.1 G ROWork Zones
1.17.1 G RODecontamination Facilities
SD-03 Product Data
1.22 G ROSafety and Health Phase-Out
Report 1.16.2Site Control Log 1.12.4Employee Certificates
01 45 04 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control Plan
01 45 35 SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1Steel Joist Institute Membership 2.1Certificate of Compliance
1.5 G OMASpecial Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 73 PAGES
01 45 35 SD-11 Closeout Submittals
3.1.2 G OMAComprehensive Final Report
01 57 20 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
1.8Joint Condition Survey
3.8 GArchaeological Monitor
3.8 GArchaeological Monitoring Plan
3.15.1 GContaminated Media
Management Work Plan
3.15.6 GActivity Hazard Analysis (AHA)
01 57 23 SD-07 Certificates 2.1.3Mill Certificate or Affidavit
01 74 19 SD-01 Preconstruction Submittals 1.4Material dismantling sequence plan 1.4Schedule of removal 1.4Estimated quantity of recyclable materials SD-09 Manufacturer’s Field Reports Solid Waste Disposal and Diversion
01 78 00 SD-03 Product Data 1.6.1Warranty Management Plan 1.6.5Warranty Tags 1.3.5.1Spare Parts Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 73 PAGES
01 78 00 SD-08 Manufacturer’s Instructions 1.4Preventative Maintenance 1.4Condition Monitoring (Predictive
Testing) 1.4Inspection 1.6.1Instructions
SD-10 Operation and Maintenance Data
1.8.1Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.3.1Record Drawings 1.5Certification of EPA Designated
Items 01 78 23.33 SD-10 Operation and Maintenance
Data
2.1.1 G OMASystem Instructions
01 90 00 SD-01 Preconstruction Submittals 1.3.2Organization Plan 1.13.3Dig Permit 1.14Contractor's Operations or
Storage Area SD-06 Test Reports
1.8Inspection 1.9Dust Control
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 73 PAGES
01 90 00 1.6Materials 02 41 00 SD-01 Preconstruction Submittals
1.2.1 G RODemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.7 G RONotification
SD-11 Closeout Submittals 3.3.3Receipts
02 82 13.00 10 SD-03 Product Data
3.11.3.1 G ROAsbestos Waste Shipment
Records 1.1Weight Bills and Delivery Tickets
2.1 G ROEncapsulants
1.9.1 G RORespiratory Protection Program
3.11 G ROCleanup and Disposal
1.6.1 G ROQualifications
1.11Training Program 1.8.1Licenses, Permits and
Notifications SD-06 Test Reports
3.9Exposure Assessment and Air Monitoring
1.7.3Local Exhaust System SD-07 Certificates
1.7.3Local Exhaust System
2.1 G ROEncapsulants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 73 PAGES
02 82 13.00 10 1.9Medical Surveillance Requirements
02 83 13.00 20 SD-01 Preconstruction Submittals
1.5.2.2 G ROLead Compliance Plan
1.5.1.1 G ROCompetent Person
1.5.1.2 G ROTraining Certification
1.5.2.8 G ROLead Waste Management Plan
1.5.2.4 G ROMedical Examinations
SD-06 Test Reports
1.5.2.3 G ROSampling Results
1.5.2.3 G ROOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.3 G ROTesting Laboratory
SD-11 Closeout Submittals
3.5.2.1 G ROturn-in documents or weight
tickets
03 01 30.71 SD-05 Design Data 1.4.1.1Job Mix Formula
SD-06 Test Reports 2.1.2Aggregate 2.1.1.1Epoxy Resin Binder 2.1.1.2Epoxy Grout
SD-07 Certificates 2.1.1.1Epoxy Resin Binder 2.1.1.2Epoxy Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 73 PAGES
03 01 30.71 SD-08 Manufacturer’s Instructions 2.1.1Epoxy
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 G OMAFormwork
3.1.1 G OMAFormwork
2.2.1 G ROForm Removal Schedule
SD-03 Product Data 2.2Form Materials
SD-05 Design Data 2.1Calculations
SD-06 Test Reports 3.2Inspection
03 15 00.00 10 SD-02 Shop Drawings
2.4 G OMAWaterstops
SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops
SD-04 Samples 2.3.2Lubricant for Preformed
Compression Seals 2.3.3Field-Molded Type 2.4Waterstops
2.5.1 G OMASplicing Waterstops
SD-07 Certificates 2.2Preformed Expansion Joint Filler
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 73 PAGES
03 15 00.00 10 2.3Sealant 2.4Waterstops
03 20 00.00 10 SD-02 Shop Drawings
3.1 G OMAReinforcement
SD-03 Product Data
2.1 G OMAReinforcing Steel
SD-04 Samples 2.1.1Epoxy-Coated Bars
SD-07 Certificates 2.1Reinforcing Steel
03 30 00.00 10 SD-01 Preconstruction Submittals
1.4.2 G OMAQuality Control Plan
1.4.1Laboratory Accreditation
3.8.5.5 G OMASampling Plan
SD-03 Product Data Part 2Recycled Content Products 2.2Cementitious Materials 2.9Vapor Barrier 2.1.6Floor Finish 2.4Chemical Admixtures
2.4.6 G OMAMigratory Corrosion Inhibitor
SD-04 Samples 2.4.4Surface Retarder
SD-05 Design Data
2.1.1 G OMAMixture Proportions
3.3Lightweight Aggregate Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 73 PAGES
03 30 00.00 10 SD-06 Test Reports
2.1.1 G OMAMixture Proportions
3.8 G OMATesting and Inspection for CQC
2.2.3Fly Ash 2.2.6Ground Granulated
Blast-Furnace (GGBF) Slag 2.3Aggregates 3.8.5.1Air Content 3.8.5.2Slump 3.8.5.5Compressive Strength 2.5Water
SD-07 Certificates 1.4Contractor Quality Control personnel 3.2.1Ready-Mix Plant
03 35 00.00 10 SD-04 Samples 1.3.1Field Test Panels
03 39 00.00 10 SD-03 Product Data 2.1Curing Materials
SD-06 Test Reports 3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions 2.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.2.1 G OMACut CMU
3.4.1.1 G OMAReinforcement Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 73 PAGES
04 20 00 SD-03 Product Data
1.5.1 G ROHot Weather Procedures
2.2.2.2.1 G OMACement
2.4.1.1 G OMACementitious Materials
2.6.7 G OMAInsulation
SD-04 Samples
1.3.1.1 G ROMock-Up Panel
2.2.2.2 G ROConcrete Masonry Units (CMU)
2.4.1.4 G OMAAdmixtures for Masonry Mortar
2.6.2 G OMAAnchors, Ties, and Bar
Positioners
2.6.3 G OMAJoint Reinforcement
2.6.7 G ROInsulation
SD-05 Design Data
2.1.2 G OMAMasonry Compressive Strength
3.2.5 G OMABracing Calculations
SD-06 Test Reports 3.6.1.1Prism Tests
SD-07 Certificates 2.2.2.2Concrete Masonry Units (CMU) 2.2.3Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar
Positioners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 73 PAGES
04 20 00 2.6.3Joint Reinforcement 2.6.7Insulation
SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G OMAErection Drawings
SD-02 Shop Drawings
1.4.2 G OMAFabrication drawings
SD-03 Product Data 2.5.2Shop primer 2.4.1Welding electrodes and rods 2.4.2Non-Shrink Grout
SD-06 Test Reports 2.3Bolts, nuts, and washers 3.7.1.2Weld Inspection Reports 3.7.2Embrittlement Test Reports
SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers 1.4.3.1Welding procedures and qualifications 2.4.1Welding electrodes and rods
05 21 19 SD-01 Preconstruction Submittals 1.5.2Welder qualification 1.5.2Material Safety Data Sheet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 73 PAGES
05 21 19 SD-02 Shop Drawings
1.5.1 G OMASteel joist framing
SD-06 Test Reports 3.4.1Erection inspection 3.4.1Welding inspections
SD-07 Certificates 2.1Accessories 1.5.2Certification of Compliance
05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings 2.3.1.1Cant Strips 2.3.1.2Ridge and Valley Plates 2.3.1.3Metal Closure Strips
SD-03 Product Data 2.2Accessories 1.3.1Deck Units 2.1.3Joint Sealant Material 2.2.10Mechanical Fasteners 1.3.2Powder-Actuated Tool Operator 2.3.3Repair Paint 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
SD-04 Samples 2.3Metal Roof Deck Units 2.1.4Flexible Closure Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 73 PAGES
05 30 00 2.3Flexible Closure Strips SD-05 Design Data
1.3.1Deck Units SD-07 Certificates
1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance
05 50 13 SD-02 Shop Drawings
2.6 G ROAccess doors and panels
2.3 G ROSteel Stairs
2.5 G ROSteel Handrails/Guardrails
2.8 G OMAangles and plates
SD-03 Product Data 2.6Access doors and panels
06 10 00 SD-02 Shop Drawings
3.2.1 G RONailers
3.2.1.1 G ROStrips
SD-03 Product Data 1.8Fire-retardant treatment
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates 1.9.1Certificates of grade 1.7Preservative treatment
SD-11 Closeout Submittals 2.3.2Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 73 PAGES
06 20 00 SD-02 Shop Drawings 1.3Detail Drawings
SD-03 Product Data
2.1 G ROWood
SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance
06 41 16.00 10 SD-02 Shop Drawings
1.5.2 G OMAShop Drawings
2.9 G OMAShop Drawings
3.1 G OMAInstallation
SD-03 Product Data
2.1 G OMAWood Materials
1.5.3Certification
SD-04 Samples
2.3 G OMAPlastic Laminates
2.6 G ROCabinet Hardware
SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework
SD-11 Closeout Submittals 1.3LEED Documentation
06 61 16 SD-02 Shop Drawings
1.5.2 G OMADetail Drawings
3.1 G OMAInstallation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 73 PAGES
06 61 16 2.1Solid polymer material 1.5.1Qualifications 2.3Fabrications 1.5.3Certification 1.5.3VOC Content
SD-04 Samples
2.1 G ROMaterial
2.3.5 G ROCounter and Vanity Tops
SD-06 Test Reports 2.1Solid polymer material
SD-07 Certificates 2.3Fabrications 1.5.1Qualifications
SD-10 Operation and Maintenance Data
3.2Clean-up SD-11 Closeout Submittals
1.3LEED Documentation 07 05 23 SD-01 Preconstruction Submittals
1.4 G ROWork Plan
SD-03 Product Data
2.1 G ROThermal Imaging Camera
SD-07 Certificates
1.6.2.1Air Barrier Inspection Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 73 PAGES
07 05 23 1.6.3Date Of Last Calibration SD-06 Test Reports
3.3 G ROPressure Test Procedures
3.4.5 G RODiagnostic Test Report
07 21 13 SD-03 Product Data
2.1 G OMABlock or board insulation
2.2Vapor retarder 2.3Pressure sensitive tape 2.4Protection board or coating 2.5Accessories
SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.5.1Adhesive
07 21 16 SD-03 Product Data 2.1Blanket insulation 2.2Sill sealer insulation 2.4Vapor retarder 2.5Pressure sensitive tape 2.6Accessories 1.3Certification
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 27 10.00 10 SD-06 Test Reports
1.8 G OMADesign Review Report
3.1.2 G ROTesting and Inspection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 73 PAGES
07 27 10.00 10 1.7 G ROAir Barrier Inspector 07 60 00 SD-02 Shop Drawings
3.1.13 G ROGutters
3.1.14 G RODownspouts
3.1.17 G ROExpansion joints;
3.1.18 G ROFlashing at Roof Penetrations
3.1.11 G ROFascias
3.1.12 G RODrip edge
3.1.10 G ROCounterflashing
3.1.15 G ROOpen Valley Flashing
3.1.16 G ROEave Flashing
SD-11 Closeout Submittals 3.5Quality Control Plan
07 61 15.00 20 SD-02 Shop Drawings
2.1 G OMARoofing panels
SD-03 Product Data
2.1 G OMARoofing panels
2.2Attachment clips 2.3.1Closures 2.3Accessories 2.4Underlayment
1.8 G OMAwarranty
SD-04 Samples 2.1Roofing panels 2.3Accessories
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 73 PAGES
07 61 15.00 20 1.5 G OMALoad calculations SD-06 Test Reports
1.3.2.5 G OMAStructural performance
2.5 G ROPanel finish
3.5 G ROManufacturer's field inspection
SD-07 Certificates 1.6.2Technical representative 1.6.3Qualification of Installer
2.1.1.5 G ROCoil stock
SD-08 Manufacturer’s Instructions 2.3.3Sealant
3.3 G ROInstallation
SD-11 Closeout Submittals 3.7Information card
07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials
SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications 3.3Inspection
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 73 PAGES
07 92 00 3.3.6Sealant 08 11 16 SD-02 Shop Drawings
1.5.1 G OMADoors, windows and frames
SD-04 Samples
1.5.2.1Finish sample SD-05 Design Data
1.2.1 G OMAcalculations
SD-08 Manufacturer’s Instructions
2.1Doors and frames 08 51 13 SD-02 Shop Drawings
2.1 G OMAWindows
1.10Fabrication Drawings
SD-03 Product Data
2.1 G OMAWindows
2.2.5.1 G OMAHardware
2.2.3 G OMAFasteners
1.11 G OMAWindow performance
2.3 G OMAThermal-Barrier Windows
2.2.7 G OMAScreens
2.2.2 G OMAWeatherstripping
2.2.5 G OMAAccessories
1.11.4Thermal performance
SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 73 PAGES
08 51 13 2.1 G OMAStructural calculations for deflection
SD-10 Operation and Maintenance Data
2.1 G ROWindows
1.7.1Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 G ROHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 G OMAHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.3 G ROHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting 08 81 00 SD-02 Shop Drawings
G ROInstallation SD-03 Product Data
2.1.3 G ROLaminated Glass
1.3 G ROGlazing Accessories
SD-04 Samples
2.1.3 G ROLaminated Glass
2.2.4 G ROTape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 73 PAGES
08 81 00 2.2.2.1 G ROSealant SD-07 Certificates
2.1.3 G ROLaminated Glass
SD-08 Manufacturer’s Instructions
2.2 G ROSetting and sealing materials
3.2 G ROGlass setting
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SD-04 Samples
1.4 G ROWall louvers
1.5 G ROWall louvers
09 22 00 SD-02 Shop Drawings
2.1 G ROMetal support systems
09 29 00 SD-03 Product Data 2.1.3Cementitious backer units 2.1.8Accessories 2.1.2Water-Resistant Gypsum
Backing Board 2.1.4Glass Mat Water-Resistant
Gypsum Tile Backing Board 2.1.5Joint Treatment Materials
SD-07 Certificates
2.1 G ROAsbestos Free Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 73 PAGES
09 29 00 SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
3.8Waste Management SD-11 Closeout Submittals
2.1.1Gypsum Board 2.1.7Adhesives
09 30 10 SD-02 Shop Drawings
3.2 G OMADetail Drawings
SD-03 Product Data
2.1 G OMATile
2.2 G ROSetting-Bed
2.4 G ROMortar and Grout
2.1 G ROAccessories
2.1 G ROTransition Strips
2.5 G ROTransition Strips
SD-04 Samples
2.1 G OMATile
2.4 G OMAGrout
SD-07 Certificates 2.1Tile 2.4Mortar and Grout
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 73 PAGES
09 30 10 3.6Maintenance Instructions SD-10 Operation and Maintenance Data
3.2 G ROInstallation
SD-11 Closeout Submittals
1.2LEED Documentation 09 51 00 SD-02 Shop Drawings
1.2 G ROApproved Detail Drawings
SD-03 Product Data
1.2 G ROAcoustical Ceiling Systems
1.4Certification
SD-04 Samples
2.1 G ROAcoustical Units
2.1.1 G ROAcoustic Ceiling Tiles
SD-06 Test Reports
1.2.1 G ROCeiling Attenuation Class and
Test SD-07 Certificates
2.1 G ROAcoustical Units
2.1.1 G ROAcoustic Ceiling Tiles
09 90 00 SD-02 Shop Drawings
3.10 G ROPiping identification
3.10stencil
SD-03 Product Data 1.4.2Certification
2.1 G ROCoating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 73 PAGES
09 90 00 2.1 G ROManufacturer's Technical Data Sheets
SD-04 Samples
1.10 G ROColor
SD-07 Certificates 1.3Applicator's qualifications
1.4.1.2 G ROQualification Testing
SD-08 Manufacturer’s Instructions 2.1Application instructions 3.6.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 G ROCoatings:
SD-11 Closeout Submittals
2.1Materials 09 97 02.05 SD-01 Preconstruction Submittals
1.2 G ROSafety, Health, and
Environmental Requirements
1.2.1 G ROSafety Plan
1.2.1.6 G ROConfined Spaces Plan
1.2.1.7 G RORespiratory Protection Plan
1.2.2.1 G ROAirborne Sampling Plan
1.2.1 G ROVentilation Assessment Plan
1.2.2 G ROMedical Surveillance Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 73 PAGES
09 97 02.05 1.2.2.2 G ROWorker Protection Plan
1.2.3 G ROEnvironmental Protection Plan
3.2.4 G ROTemperature Control Plan
1.2.3.1 G ROWaste Manifest
1.2.3.1 G ROWaste Disposal Plan
1.2.3.2 G ROContainment Plan
1.4.1 G ROCorrective Action Procedures
1.6 G OMAEnvironmental Control System
1.2.3.3 G ROVisible Emissions Monitoring
Plan
1.5 G ROCOATING WORK PLAN
1.2.3.4 G ROSoil Quality Plan
1.3 G ROQuality Assurance
SD-03 Product Data Part 2 G OMAManufacturer's Product Data
Sheet
2.1 G OMAPolyurea
3.3.3 G OMASystem 33 Modified- Polyurea
SD-04 Samples Part 2 G OMAProduct Samples Part 2 G OMASolvents or Thinners
SD-06 Test Reports
1.2.3.4 G ROSoil Quality Test Report
3.4 G OMAInspection Reports
1.2.2.2 G ROMedical Status Report
1.2.2.3 G ROChange in Medical Status Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 73 PAGES
09 97 02.05 1.2.2.1 G ROAir Monitoring Test Plan
1.2.2.1 G ROAir Monitoring Test Report
3.3.3 G OMAIndex Tests
SD-07 Certificates
1.8.1 G ROCertified EHS Professional
1.8.2 G OMACertified Lead Laboratory
1.8.3 G OMASSPC QP 1 Certificate
1.8.9 G OMACoating Thickness Gage
Qualification
1.8.4 G OMAQualified Paint Applicator
1.8.5 G OMAQualifications of Individuals
Operating Plural Component Equipment
1.8.6 G OMAQualifications of Testing
Laboratory for Coatings
1.8.7 G OMAQualifications of Testing
Laboratory for Abrasive
1.8.8 G OMAQualifications of Coating
Contractors
3.1.11 G OMANACE III inspector, PCS or a
QP-5 firm
09 97 13.17 SD-03 Product Data
2.1 G OMATank Bottom to Foundation
Sealant SD-05 Design Data
1.4.4.1Environmental Control System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 73 PAGES
09 97 13.17 SD-06 Test Reports 1.4.5.1Metallic Abrasive Qualification
Test Reports 3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.11.2.2Inspection Report Forms 3.11.2.3Daily Inspection Reports 1.4.5.2Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly) SD-07 Certificates
1.4.1Contract Errors, Omissions, and Other Discrepancies
1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH) 1.4.6.6Qualifications Of Individuals
Performing Abrasive Blasting 1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating Inspection Company
1.4.6.4Qualifications of CQCSM Manager/ Specialist Coating Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 73 PAGES
09 97 13.17 1.4.6.7Qualifications of Testing Laboratory for Coatings
1.4.6.8Qualifications of Testing Laboratory for Abrasive
1.4.6.9Qualifications of Coating Contractors
1.4.6.10Epoxy Coating Materials 1.4.6.11Non-metallic Abrasive 1.4.6.12Metallic Abrasive
SD-08 Manufacturer’s Instructions 1.5.1Coating System Instructions
SD-11 Closeout Submittals
3.8.6 G RODisposal of Used Abrasive
3.11.2.4 G ROInspection Logbook
09 97 13.27 SD-05 Design Data 1.4.4.1Containment System
SD-06 Test Reports 1.4.5.1Joint Sealant Qualification Test
Reports 1.4.5.2Coatings Qualification Test
Reports 1.4.5.3Metallic Abrasive Qualification
Test Reports 3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.9.2.2Inspection Report Forms
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 73 PAGES
09 97 13.27 3.9.2.3Daily Inspection Reports 1.4.5.4Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly) SD-07 Certificates
1.4.1Contract Errors, Omissions, and Other Discrepancies
1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH) 1.4.6.6Qualifications Of Individuals
Performing Abrasive Blasting 1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating Inspection Company
1.4.6.4Qualifications of CQCSM Manager/Specialist Coating Inspector
1.4.6.7Qualifications of Testing Laboratory for Coatings
1.4.6.8Qualifications of Testing Laboratory for Abrasive
1.4.6.9Qualifications of Coating Contractors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 73 PAGES
09 97 13.27 1.4.6.10Joint Sealant Materials 1.4.6.11Coating Materials 1.4.6.12Coating System Component
Compatibility 1.4.6.13Non-metallic Abrasive 1.4.6.14Metallic Abrasive
SD-08 Manufacturer’s Instructions 1.5.1Joint Sealant Instructions
1.5.2 G OMACoating System Instructions
SD-11 Closeout Submittals 3.6.6Disposal of Used Abrasive
3.9.2.4 G ROInspection Logbook
10 14 00.20 SD-02 Shop Drawings
1.5.2 G OMADetail Drawings
SD-03 Product Data
3.1 G OMAInstallation
1.7 G ROWarranty
SD-04 Samples
1.5.1 G OMAInterior Signage
1.4Software
SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 73 PAGES
10 21 13 1.2Fabrication Drawings
3.2 G OMAInstallation Drawings
SD-03 Product Data 1.2Cleaning and Maintenance
Instructions 2.6Colors And Finishes 2.1.1Galvanized Steel Sheet 2.1.2Sound-Deadening Cores 2.1.3Anchoring Devices and
Fasteners 2.1.5Hardware and Fittings 2.1.4Brackets 2.1.6Door Hardware 2.2.1Toilet Enclosures
SD-04 Samples
2.6 G OMAColors and Finishes
2.1.5Hardware and Fittings 2.1.3Anchoring Devices and
Fasteners SD-10 Operation and Maintenance Data
3.7Waste Management Plan 10 28 13 SD-03 Product Data
2.1.2 G OMAFinishes
2.2 G OMAAccessory Items
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 73 PAGES
10 28 13 2.1.2 G ROFinishes 2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
SD-10 Operation and Maintenance Data
2.2.11 G ROElectric Hand Dryer
SD-11 Closeout Submittals
1.2 G ROLEED Documentation
10 44 16 SD-01 Preconstruction Submittals
2.1 G ROManufacturer's Data
SD-02 Shop Drawings
2.1 G ROFire Extinguishers
1.3.1Accessories Part 2 G ROCabinets
SD-03 Product Data 2.1Fire Extinguishers 1.3.1Accessories Part 2Cabinets 3.2.1Replacement Parts
SD-04 Samples 1.3.1Fire Extinguisher 1.3.1Cabinet 1.3.1Accessories
SD-07 Certificates 2.1Fire Extinguishers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 73 PAGES
10 44 16 2.1Manufacturer's Warranty with Inspection Tag
10 51 13 SD-02 Shop Drawings 2.1Types 1.4Location 3.1Installation
SD-03 Product Data 2.2Material 2.3.3Handles 2.2.3Finish 2.3components 3.1Assembly
SD-04 Samples
1.5.1 G ROColor chips
12 21 00 SD-02 Shop Drawings
3.3 G OMAInstallation
SD-03 Product Data
2.1 G OMAWindow Blinds
3.3Installation
SD-04 Samples
2.1 G OMAWindow Blinds
SD-06 Test Reports 2.1Window Blinds
SD-08 Manufacturer’s Instructions 2.1Window Blinds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 73 PAGES
12 21 00 SD-10 Operation and Maintenance Data
2.1Window Blinds 12 35 70 SD-02 Shop Drawings
2.1 G OMAApproved Detail Drawings
SD-03 Product Data
2.1Casework SD-04 Samples
2.1 G ROCasework
3.1.1 G ROWall Hung Cabinets
3.1.2 G ROFloor Mounted Cabinets
3.1.3 G OMACountertops
SD-07 Certificates 2.1Casework
13 48 00 SD-02 Shop Drawings
3.1 G OMABracing
3.4 G OMAResilient Vibration Isolation
Devices
2.1 G OMAEquipment Requirements
SD-03 Product Data
3.1 G OMABracing
2.1 G OMAEquipment Requirements
SD-06 Test Reports
3.3 G OMAAnchor Bolts
13 48 00.00 10 SD-02 Shop Drawings 3.1Coupling and Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 73 PAGES
13 48 00.00 10 3.2Flexible Couplings or Joints 2.1Equipment Requirements
1.2.4 G OMAContractor Designed Bracing
SD-03 Product Data
3.1 G ROCoupling and Bracing
2.1 G ROEquipment Requirements
1.2.4 G ROContractor Designed Bracing
SD-07 Certificates 2.3Flexible Ball Joints
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 G OMAShop Drawings
3.9As-Built Drawings
SD-03 Product Data 1.4.1Fire Protection Related
Submittals
2.3 G OMAMaterials and Equipment
1.6Spare Parts
3.8 G ROPreliminary Tests
3.9 G ROFinal Acceptance Test
3.10 G OMAOnsite Training
1.4.1 G OMAFire Protection Specialist
1.4.2 G OMASprinkler System Installer
SD-05 Design Data
1.4.3 G OMASway Bracing
1.2.1.3 G OMAHydraulic Calculations
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 73 PAGES
21 13 13.00 10 3.8Preliminary Test Report 3.9Final Acceptance Test Report
SD-07 Certificates 3.3Inspection by Fire Protection
Specialist SD-10 Operation and Maintenance Data
3.10 G ROOperating and Maintenance
Manuals
22 00 00 SD-02 Shop Drawings
3.7.1 G ROPlumbing System
SD-03 Product Data 2.4Fixtures
2.4.1 G ROFlush valve urinals (UR-1)
2.4.2 G ROFlush tank water closets (WC-1)
2.4.3Countertop lavatories 2.4.4Lab/Break Room sinks (SK-1) 2.4.6Mop sinks
2.4.5 G ROElectric water coolers (EWC-1)
2.7 G ROElectric Water heaters (EWH-1)
2.5.2 G ROShower Valve Assembly
1.5.1Welding 3.7.1Plumbing System
SD-06 Test Reports 3.7Tests, Flushing and Disinfection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 73 PAGES
22 00 00 1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.7.1 G ROPlumbing System
23 00 00 SD-02 Shop Drawings
1.4.5 G OMADetail Drawings
SD-03 Product Data
2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts 2.9.1.2Duct Connectors
2.9.2 G RODuct Access Doors
2.9.3Fire Dampers
2.9.4 G ROManual Balancing Dampers
2.9.7.1Diffusers 2.9.7.2Registers and Grilles 2.9.8Louvers 2.9.9Penthouses 2.10.1.1Centrifugal Fans 2.10.1.2In-Line Centrifugal Fans 2.10.1.3Ceiling Exhaust Fans 1.4.6Test Procedures
1.2.1.2 G RODiagrams
SD-06 Test Reports
3.11 G ROPerformance…