00 01 10 - 1 PROJECT TABLE OF CONTENTS

SPECIFICATIONS FOR CONSTRUCTION

REPLACE FUEL STORAGE TANKS

DESC1704

DEFENSE FUEL SUPPLY POINT KWAJALEIN ATOLL

MARSHALL ISLANDS

PROJECT TABLE OF CONTENTS

VOLUME 1 OF 2 – DIVISION 00 - 21

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 PROJECT TABLE OF CONTENTS

DIVISION 00 SPECIFICATIONS ARE UNDER SEPARATE COVER

DIVISION 01 - GENERAL REQUIREMENTS

01 32 00 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

REGISTER SUBMITTAL REGISTER

01 33 29 SUSTAINABILITY REPORTING

01 33 29AT HIGH PERFORMANCE SUSTAINABLE BUILDING PERFORMANCE CHECKLIST

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMINATED SITES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 RMS3 - CONTRACTOR MODE (RMS3/CM)

01 45 04 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 45 35AT STATEMENT OF AND SCHEDULE OF SPECIAL INSPECTIONS

01 57 20 ENVIRONMENTAL PROTECTION

01 57 23 STORM WATER POLLUTION PREVENTION MEASURES

01 62 35 RECYCLE/RECOVERED MATERIAL

01 74 19 CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL SYSTEMS

01 90 00 MISCELLANEOUS PROVISIONS

01 90 00DPA DIG PERMIT APPLICATION

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 41 00AT SPI 1264 - SOLID WASTE SEGREGATION, STORAGE AND COLLECTION

PLAN

02 82 13.00 10 ASBESTOS ABATEMENT

02 82 13.00 10LAB LEAD AND ASBESTOS SURVEY

02 83 13.00 20 LEAD IN CONSTRUCTION

Am #0003

00 01 10 - 2 PROJECT TABLE OF CONTENTS

DIVISION 03 - CONCRETE

03 01 30.71 CONCRETE REHABILITATION

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS (BREAK AND

LAUNDRY ROOMS)

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 60 00 FLASHING AND SHEET METAL

07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 16 ALUMINUM DOORS AND FRAMES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

00 01 10 - 3 PROJECT TABLE OF CONTENTS

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 PORCELAIN TILING

09 51 00 ACOUSTICAL CEILINGS

09 90 00 PAINTS AND COATINGS

09 97 02.05 PAINTING: COATING CONTAINMENT WALLS AND GENERAL COATING OF

EXTERIOR CONTRETE WALLS

09 97 02.05AT1 RECLAIMED WATER MONTHLY MONITORING REPORT-SEPT 2016

09 97 02.05AT2 WATER STATISTICS-SEPTEMBER 2016

09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL PETROLEUM

FUEL TANKS

09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 14 00.20AT INTERIOR SIGNAGE ATTACHMENTS

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

[*Am-3]

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 35 70 LABORATORY CASEWORK

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

VOLUME 2 OF 2 – DIVISION 22 - 46

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

00 01 10 - 4 PROJECT TABLE OF CONTENTS

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 82 02.00 10 UNITARY COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 01 01 DEEP SOIL MIXING

31 05 21 GEOGRID SOIL REINFORCEMENT

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS

32 15 00 AGGREGATE SURFACE COURSE

32 16 13 CONCRETE SIDEWALKS AND CURBS

32 31 13.53 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 01 50.01 CLEANING FUEL STORAGE TANKS

33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP

33 09 53 AVIATION FUEL ANNUNCIATOR / EPDS SYSTEM

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERS

33 32 13.10 24 LIFT STATION

33 40 00 CONTAINMENT DRAINAGE SYSTEM

33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT

00 01 10 - 5 PROJECT TABLE OF CONTENTS

33 52 43.13 AVIATION FUEL PIPING

33 52 43.14 AVIATION FUEL CONTROL VALVES

33 52 43.23 AVIATION FUEL PUMPS

33 52 43.28 FILTER SEPARATOR, AVIATION FUELING SYSTEM

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 56 13.13 STEEL TANKS WITH FIXED ROOFS

33 56 13.15 UNDERTANK INTERSTITIAL SPACE

33 56 19 FUEL IMPERMEABLE LINER SYSTEM

33 58 00 LEAK DETECTION FOR FUELING SYSTEMS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

[*Am-3] Appendix A – Final Geotechnical Report and Deep Soil Mixing Report Appendix B – API 653 Tank Inspection Reports (Available Information)

-- End of Project Table of Contents --

This page was intentionally left blank for duplex printing.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 73 PAGES

Replace Fuel StorageTanks, Kwajalein Atoll, Marshall Islands

01 32 00 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

SD-06 Test Reports 3.5.2Narrative Report 3.5.1Schedule Reports 3.6.2Periodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

3.1 GSubmittal Register

3.5.1Monthly Updates

01 33 29 SD-01 Preconstruction Submittals

1.5.2.1 GPreliminary Sustainability

Notebook 1.5.2.1Preliminary High Performance and Sustainable Building Checklist SD-11 Closeout Submittals

1.5.2.1 GFinal Sustainability Notebook

1.5.2.1 GFinal High Performance and

Sustainable Building Checklist 01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 73 PAGES

01 35 26 SD-07 Certificates 1.6.1.5Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8 GActivity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance

01 35 29.13 SD-02 Shop Drawings

1.16.1 G ROWork Zones

1.17.1 G RODecontamination Facilities

SD-03 Product Data

1.22 G ROSafety and Health Phase-Out

Report 1.16.2Site Control Log 1.12.4Employee Certificates

01 45 04 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

01 45 35 SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Steel Joist Institute Membership 2.1Certificate of Compliance

1.5 G OMASpecial Inspector

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 73 PAGES

01 45 35 SD-11 Closeout Submittals

3.1.2 G OMAComprehensive Final Report

01 57 20 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

1.8Joint Condition Survey

3.8 GArchaeological Monitor

3.8 GArchaeological Monitoring Plan

3.15.1 GContaminated Media

Management Work Plan

3.15.6 GActivity Hazard Analysis (AHA)

01 57 23 SD-07 Certificates 2.1.3Mill Certificate or Affidavit

01 74 19 SD-01 Preconstruction Submittals 1.4Material dismantling sequence plan 1.4Schedule of removal 1.4Estimated quantity of recyclable materials SD-09 Manufacturer’s Field Reports Solid Waste Disposal and Diversion

01 78 00 SD-03 Product Data 1.6.1Warranty Management Plan 1.6.5Warranty Tags 1.3.5.1Spare Parts Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 73 PAGES

01 78 00 SD-08 Manufacturer’s Instructions 1.4Preventative Maintenance 1.4Condition Monitoring (Predictive

Testing) 1.4Inspection 1.6.1Instructions

SD-10 Operation and Maintenance Data

1.8.1Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.3.1Record Drawings 1.5Certification of EPA Designated

Items 01 78 23.33 SD-10 Operation and Maintenance

Data

2.1.1 G OMASystem Instructions

01 90 00 SD-01 Preconstruction Submittals 1.3.2Organization Plan 1.13.3Dig Permit 1.14Contractor's Operations or

Storage Area SD-06 Test Reports

1.8Inspection 1.9Dust Control

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 73 PAGES

01 90 00 1.6Materials 02 41 00 SD-01 Preconstruction Submittals

1.2.1 G RODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 G RONotification

SD-11 Closeout Submittals 3.3.3Receipts

02 82 13.00 10 SD-03 Product Data

3.11.3.1 G ROAsbestos Waste Shipment

Records 1.1Weight Bills and Delivery Tickets

2.1 G ROEncapsulants

1.9.1 G RORespiratory Protection Program

3.11 G ROCleanup and Disposal

1.6.1 G ROQualifications

1.11Training Program 1.8.1Licenses, Permits and

Notifications SD-06 Test Reports

3.9Exposure Assessment and Air Monitoring

1.7.3Local Exhaust System SD-07 Certificates

1.7.3Local Exhaust System

2.1 G ROEncapsulants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 73 PAGES

02 82 13.00 10 1.9Medical Surveillance Requirements

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.2 G ROLead Compliance Plan

1.5.1.1 G ROCompetent Person

1.5.1.2 G ROTraining Certification

1.5.2.8 G ROLead Waste Management Plan

1.5.2.4 G ROMedical Examinations

SD-06 Test Reports

1.5.2.3 G ROSampling Results

1.5.2.3 G ROOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.3 G ROTesting Laboratory

SD-11 Closeout Submittals

3.5.2.1 G ROturn-in documents or weight

tickets

03 01 30.71 SD-05 Design Data 1.4.1.1Job Mix Formula

SD-06 Test Reports 2.1.2Aggregate 2.1.1.1Epoxy Resin Binder 2.1.1.2Epoxy Grout

SD-07 Certificates 2.1.1.1Epoxy Resin Binder 2.1.1.2Epoxy Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 73 PAGES

03 01 30.71 SD-08 Manufacturer’s Instructions 2.1.1Epoxy

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G OMAFormwork

3.1.1 G OMAFormwork

2.2.1 G ROForm Removal Schedule

SD-03 Product Data 2.2Form Materials

SD-05 Design Data 2.1Calculations

SD-06 Test Reports 3.2Inspection

03 15 00.00 10 SD-02 Shop Drawings

2.4 G OMAWaterstops

SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops

SD-04 Samples 2.3.2Lubricant for Preformed

Compression Seals 2.3.3Field-Molded Type 2.4Waterstops

2.5.1 G OMASplicing Waterstops

SD-07 Certificates 2.2Preformed Expansion Joint Filler

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 73 PAGES

03 15 00.00 10 2.3Sealant 2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

3.1 G OMAReinforcement

SD-03 Product Data

2.1 G OMAReinforcing Steel

SD-04 Samples 2.1.1Epoxy-Coated Bars

SD-07 Certificates 2.1Reinforcing Steel

03 30 00.00 10 SD-01 Preconstruction Submittals

1.4.2 G OMAQuality Control Plan

1.4.1Laboratory Accreditation

3.8.5.5 G OMASampling Plan

SD-03 Product Data Part 2Recycled Content Products 2.2Cementitious Materials 2.9Vapor Barrier 2.1.6Floor Finish 2.4Chemical Admixtures

2.4.6 G OMAMigratory Corrosion Inhibitor

SD-04 Samples 2.4.4Surface Retarder

SD-05 Design Data

2.1.1 G OMAMixture Proportions

3.3Lightweight Aggregate Concrete

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 73 PAGES

03 30 00.00 10 SD-06 Test Reports

2.1.1 G OMAMixture Proportions

3.8 G OMATesting and Inspection for CQC

2.2.3Fly Ash 2.2.6Ground Granulated

Blast-Furnace (GGBF) Slag 2.3Aggregates 3.8.5.1Air Content 3.8.5.2Slump 3.8.5.5Compressive Strength 2.5Water

SD-07 Certificates 1.4Contractor Quality Control personnel 3.2.1Ready-Mix Plant

03 35 00.00 10 SD-04 Samples 1.3.1Field Test Panels

03 39 00.00 10 SD-03 Product Data 2.1Curing Materials

SD-06 Test Reports 3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions 2.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.2.1 G OMACut CMU

3.4.1.1 G OMAReinforcement Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 73 PAGES

04 20 00 SD-03 Product Data

1.5.1 G ROHot Weather Procedures

2.2.2.2.1 G OMACement

2.4.1.1 G OMACementitious Materials

2.6.7 G OMAInsulation

SD-04 Samples

1.3.1.1 G ROMock-Up Panel

2.2.2.2 G ROConcrete Masonry Units (CMU)

2.4.1.4 G OMAAdmixtures for Masonry Mortar

2.6.2 G OMAAnchors, Ties, and Bar

Positioners

2.6.3 G OMAJoint Reinforcement

2.6.7 G ROInsulation

SD-05 Design Data

2.1.2 G OMAMasonry Compressive Strength

3.2.5 G OMABracing Calculations

SD-06 Test Reports 3.6.1.1Prism Tests

SD-07 Certificates 2.2.2.2Concrete Masonry Units (CMU) 2.2.3Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 73 PAGES

04 20 00 2.6.3Joint Reinforcement 2.6.7Insulation

SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G OMAErection Drawings

SD-02 Shop Drawings

1.4.2 G OMAFabrication drawings

SD-03 Product Data 2.5.2Shop primer 2.4.1Welding electrodes and rods 2.4.2Non-Shrink Grout

SD-06 Test Reports 2.3Bolts, nuts, and washers 3.7.1.2Weld Inspection Reports 3.7.2Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers 1.4.3.1Welding procedures and qualifications 2.4.1Welding electrodes and rods

05 21 19 SD-01 Preconstruction Submittals 1.5.2Welder qualification 1.5.2Material Safety Data Sheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 73 PAGES

05 21 19 SD-02 Shop Drawings

1.5.1 G OMASteel joist framing

SD-06 Test Reports 3.4.1Erection inspection 3.4.1Welding inspections

SD-07 Certificates 2.1Accessories 1.5.2Certification of Compliance

05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings 2.3.1.1Cant Strips 2.3.1.2Ridge and Valley Plates 2.3.1.3Metal Closure Strips

SD-03 Product Data 2.2Accessories 1.3.1Deck Units 2.1.3Joint Sealant Material 2.2.10Mechanical Fasteners 1.3.2Powder-Actuated Tool Operator 2.3.3Repair Paint 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.3Metal Roof Deck Units 2.1.4Flexible Closure Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 73 PAGES

05 30 00 2.3Flexible Closure Strips SD-05 Design Data

1.3.1Deck Units SD-07 Certificates

1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance

05 50 13 SD-02 Shop Drawings

2.6 G ROAccess doors and panels

2.3 G ROSteel Stairs

2.5 G ROSteel Handrails/Guardrails

2.8 G OMAangles and plates

SD-03 Product Data 2.6Access doors and panels

06 10 00 SD-02 Shop Drawings

3.2.1 G RONailers

3.2.1.1 G ROStrips

SD-03 Product Data 1.8Fire-retardant treatment

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.9.1Certificates of grade 1.7Preservative treatment

SD-11 Closeout Submittals 2.3.2Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 73 PAGES

06 20 00 SD-02 Shop Drawings 1.3Detail Drawings

SD-03 Product Data

2.1 G ROWood

SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance

06 41 16.00 10 SD-02 Shop Drawings

1.5.2 G OMAShop Drawings

2.9 G OMAShop Drawings

3.1 G OMAInstallation

SD-03 Product Data

2.1 G OMAWood Materials

1.5.3Certification

SD-04 Samples

2.3 G OMAPlastic Laminates

2.6 G ROCabinet Hardware

SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework

SD-11 Closeout Submittals 1.3LEED Documentation

06 61 16 SD-02 Shop Drawings

1.5.2 G OMADetail Drawings

3.1 G OMAInstallation

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 73 PAGES

06 61 16 2.1Solid polymer material 1.5.1Qualifications 2.3Fabrications 1.5.3Certification 1.5.3VOC Content

SD-04 Samples

2.1 G ROMaterial

2.3.5 G ROCounter and Vanity Tops

SD-06 Test Reports 2.1Solid polymer material

SD-07 Certificates 2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up SD-11 Closeout Submittals

1.3LEED Documentation 07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.1 G ROThermal Imaging Camera

SD-07 Certificates

1.6.2.1Air Barrier Inspection Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 73 PAGES

07 05 23 1.6.3Date Of Last Calibration SD-06 Test Reports

3.3 G ROPressure Test Procedures

3.4.5 G RODiagnostic Test Report

07 21 13 SD-03 Product Data

2.1 G OMABlock or board insulation

2.2Vapor retarder 2.3Pressure sensitive tape 2.4Protection board or coating 2.5Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.5.1Adhesive

07 21 16 SD-03 Product Data 2.1Blanket insulation 2.2Sill sealer insulation 2.4Vapor retarder 2.5Pressure sensitive tape 2.6Accessories 1.3Certification

SD-08 Manufacturer’s Instructions 3.3.1Insulation

07 27 10.00 10 SD-06 Test Reports

1.8 G OMADesign Review Report

3.1.2 G ROTesting and Inspection

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 73 PAGES

07 27 10.00 10 1.7 G ROAir Barrier Inspector 07 60 00 SD-02 Shop Drawings

3.1.13 G ROGutters

3.1.14 G RODownspouts

3.1.17 G ROExpansion joints;

3.1.18 G ROFlashing at Roof Penetrations

3.1.11 G ROFascias

3.1.12 G RODrip edge

3.1.10 G ROCounterflashing

3.1.15 G ROOpen Valley Flashing

3.1.16 G ROEave Flashing

SD-11 Closeout Submittals 3.5Quality Control Plan

07 61 15.00 20 SD-02 Shop Drawings

2.1 G OMARoofing panels

SD-03 Product Data

2.1 G OMARoofing panels

2.2Attachment clips 2.3.1Closures 2.3Accessories 2.4Underlayment

1.8 G OMAwarranty

SD-04 Samples 2.1Roofing panels 2.3Accessories

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 73 PAGES

07 61 15.00 20 1.5 G OMALoad calculations SD-06 Test Reports

1.3.2.5 G OMAStructural performance

2.5 G ROPanel finish

3.5 G ROManufacturer's field inspection

SD-07 Certificates 1.6.2Technical representative 1.6.3Qualification of Installer

2.1.1.5 G ROCoil stock

SD-08 Manufacturer’s Instructions 2.3.3Sealant

3.3 G ROInstallation

SD-11 Closeout Submittals 3.7Information card

07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials

SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications 3.3Inspection

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 73 PAGES

07 92 00 3.3.6Sealant 08 11 16 SD-02 Shop Drawings

1.5.1 G OMADoors, windows and frames

SD-04 Samples

1.5.2.1Finish sample SD-05 Design Data

1.2.1 G OMAcalculations

SD-08 Manufacturer’s Instructions

2.1Doors and frames 08 51 13 SD-02 Shop Drawings

2.1 G OMAWindows

1.10Fabrication Drawings

SD-03 Product Data

2.1 G OMAWindows

2.2.5.1 G OMAHardware

2.2.3 G OMAFasteners

1.11 G OMAWindow performance

2.3 G OMAThermal-Barrier Windows

2.2.7 G OMAScreens

2.2.2 G OMAWeatherstripping

2.2.5 G OMAAccessories

1.11.4Thermal performance

SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 73 PAGES

08 51 13 2.1 G OMAStructural calculations for deflection

SD-10 Operation and Maintenance Data

2.1 G ROWindows

1.7.1Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 G ROHardware schedule

2.3.5Keying system

SD-03 Product Data

2.3 G OMAHardware items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.3 G ROHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 08 81 00 SD-02 Shop Drawings

G ROInstallation SD-03 Product Data

2.1.3 G ROLaminated Glass

1.3 G ROGlazing Accessories

SD-04 Samples

2.1.3 G ROLaminated Glass

2.2.4 G ROTape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 73 PAGES

08 81 00 2.2.2.1 G ROSealant SD-07 Certificates

2.1.3 G ROLaminated Glass

SD-08 Manufacturer’s Instructions

2.2 G ROSetting and sealing materials

3.2 G ROGlass setting

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

SD-04 Samples

1.4 G ROWall louvers

1.5 G ROWall louvers

09 22 00 SD-02 Shop Drawings

2.1 G ROMetal support systems

09 29 00 SD-03 Product Data 2.1.3Cementitious backer units 2.1.8Accessories 2.1.2Water-Resistant Gypsum

Backing Board 2.1.4Glass Mat Water-Resistant

Gypsum Tile Backing Board 2.1.5Joint Treatment Materials

SD-07 Certificates

2.1 G ROAsbestos Free Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 73 PAGES

09 29 00 SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets

SD-10 Operation and Maintenance Data

2.1Manufacturer maintenance instructions

3.8Waste Management SD-11 Closeout Submittals

2.1.1Gypsum Board 2.1.7Adhesives

09 30 10 SD-02 Shop Drawings

3.2 G OMADetail Drawings

SD-03 Product Data

2.1 G OMATile

2.2 G ROSetting-Bed

2.4 G ROMortar and Grout

2.1 G ROAccessories

2.1 G ROTransition Strips

2.5 G ROTransition Strips

SD-04 Samples

2.1 G OMATile

2.4 G OMAGrout

SD-07 Certificates 2.1Tile 2.4Mortar and Grout

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 73 PAGES

09 30 10 3.6Maintenance Instructions SD-10 Operation and Maintenance Data

3.2 G ROInstallation

SD-11 Closeout Submittals

1.2LEED Documentation 09 51 00 SD-02 Shop Drawings

1.2 G ROApproved Detail Drawings

SD-03 Product Data

1.2 G ROAcoustical Ceiling Systems

1.4Certification

SD-04 Samples

2.1 G ROAcoustical Units

2.1.1 G ROAcoustic Ceiling Tiles

SD-06 Test Reports

1.2.1 G ROCeiling Attenuation Class and

Test SD-07 Certificates

2.1 G ROAcoustical Units

2.1.1 G ROAcoustic Ceiling Tiles

09 90 00 SD-02 Shop Drawings

3.10 G ROPiping identification

3.10stencil

SD-03 Product Data 1.4.2Certification

2.1 G ROCoating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 73 PAGES

09 90 00 2.1 G ROManufacturer's Technical Data Sheets

SD-04 Samples

1.10 G ROColor

SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 G ROQualification Testing

SD-08 Manufacturer’s Instructions 2.1Application instructions 3.6.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 G ROCoatings:

SD-11 Closeout Submittals

2.1Materials 09 97 02.05 SD-01 Preconstruction Submittals

1.2 G ROSafety, Health, and

Environmental Requirements

1.2.1 G ROSafety Plan

1.2.1.6 G ROConfined Spaces Plan

1.2.1.7 G RORespiratory Protection Plan

1.2.2.1 G ROAirborne Sampling Plan

1.2.1 G ROVentilation Assessment Plan

1.2.2 G ROMedical Surveillance Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 73 PAGES

09 97 02.05 1.2.2.2 G ROWorker Protection Plan

1.2.3 G ROEnvironmental Protection Plan

3.2.4 G ROTemperature Control Plan

1.2.3.1 G ROWaste Manifest

1.2.3.1 G ROWaste Disposal Plan

1.2.3.2 G ROContainment Plan

1.4.1 G ROCorrective Action Procedures

1.6 G OMAEnvironmental Control System

1.2.3.3 G ROVisible Emissions Monitoring

Plan

1.5 G ROCOATING WORK PLAN

1.2.3.4 G ROSoil Quality Plan

1.3 G ROQuality Assurance

SD-03 Product Data Part 2 G OMAManufacturer's Product Data

Sheet

2.1 G OMAPolyurea

3.3.3 G OMASystem 33 Modified- Polyurea

SD-04 Samples Part 2 G OMAProduct Samples Part 2 G OMASolvents or Thinners

SD-06 Test Reports

1.2.3.4 G ROSoil Quality Test Report

3.4 G OMAInspection Reports

1.2.2.2 G ROMedical Status Report

1.2.2.3 G ROChange in Medical Status Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 73 PAGES

09 97 02.05 1.2.2.1 G ROAir Monitoring Test Plan

1.2.2.1 G ROAir Monitoring Test Report

3.3.3 G OMAIndex Tests

SD-07 Certificates

1.8.1 G ROCertified EHS Professional

1.8.2 G OMACertified Lead Laboratory

1.8.3 G OMASSPC QP 1 Certificate

1.8.9 G OMACoating Thickness Gage

Qualification

1.8.4 G OMAQualified Paint Applicator

1.8.5 G OMAQualifications of Individuals

Operating Plural Component Equipment

1.8.6 G OMAQualifications of Testing

Laboratory for Coatings

1.8.7 G OMAQualifications of Testing

Laboratory for Abrasive

1.8.8 G OMAQualifications of Coating

Contractors

3.1.11 G OMANACE III inspector, PCS or a

QP-5 firm

09 97 13.17 SD-03 Product Data

2.1 G OMATank Bottom to Foundation

Sealant SD-05 Design Data

1.4.4.1Environmental Control System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 73 PAGES

09 97 13.17 SD-06 Test Reports 1.4.5.1Metallic Abrasive Qualification

Test Reports 3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.11.2.2Inspection Report Forms 3.11.2.3Daily Inspection Reports 1.4.5.2Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly) SD-07 Certificates

1.4.1Contract Errors, Omissions, and Other Discrepancies

1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH) 1.4.6.6Qualifications Of Individuals

Performing Abrasive Blasting 1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating Inspection Company

1.4.6.4Qualifications of CQCSM Manager/ Specialist Coating Inspector

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 73 PAGES

09 97 13.17 1.4.6.7Qualifications of Testing Laboratory for Coatings

1.4.6.8Qualifications of Testing Laboratory for Abrasive

1.4.6.9Qualifications of Coating Contractors

1.4.6.10Epoxy Coating Materials 1.4.6.11Non-metallic Abrasive 1.4.6.12Metallic Abrasive

SD-08 Manufacturer’s Instructions 1.5.1Coating System Instructions

SD-11 Closeout Submittals

3.8.6 G RODisposal of Used Abrasive

3.11.2.4 G ROInspection Logbook

09 97 13.27 SD-05 Design Data 1.4.4.1Containment System

SD-06 Test Reports 1.4.5.1Joint Sealant Qualification Test

Reports 1.4.5.2Coatings Qualification Test

Reports 1.4.5.3Metallic Abrasive Qualification

Test Reports 3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.9.2.2Inspection Report Forms

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 73 PAGES

09 97 13.27 3.9.2.3Daily Inspection Reports 1.4.5.4Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly) SD-07 Certificates

1.4.1Contract Errors, Omissions, and Other Discrepancies

1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH) 1.4.6.6Qualifications Of Individuals

Performing Abrasive Blasting 1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating Inspection Company

1.4.6.4Qualifications of CQCSM Manager/Specialist Coating Inspector

1.4.6.7Qualifications of Testing Laboratory for Coatings

1.4.6.8Qualifications of Testing Laboratory for Abrasive

1.4.6.9Qualifications of Coating Contractors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 73 PAGES

09 97 13.27 1.4.6.10Joint Sealant Materials 1.4.6.11Coating Materials 1.4.6.12Coating System Component

Compatibility 1.4.6.13Non-metallic Abrasive 1.4.6.14Metallic Abrasive

SD-08 Manufacturer’s Instructions 1.5.1Joint Sealant Instructions

1.5.2 G OMACoating System Instructions

SD-11 Closeout Submittals 3.6.6Disposal of Used Abrasive

3.9.2.4 G ROInspection Logbook

10 14 00.20 SD-02 Shop Drawings

1.5.2 G OMADetail Drawings

SD-03 Product Data

3.1 G OMAInstallation

1.7 G ROWarranty

SD-04 Samples

1.5.1 G OMAInterior Signage

1.4Software

SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 73 PAGES

10 21 13 1.2Fabrication Drawings

3.2 G OMAInstallation Drawings

SD-03 Product Data 1.2Cleaning and Maintenance

Instructions 2.6Colors And Finishes 2.1.1Galvanized Steel Sheet 2.1.2Sound-Deadening Cores 2.1.3Anchoring Devices and

Fasteners 2.1.5Hardware and Fittings 2.1.4Brackets 2.1.6Door Hardware 2.2.1Toilet Enclosures

SD-04 Samples

2.6 G OMAColors and Finishes

2.1.5Hardware and Fittings 2.1.3Anchoring Devices and

Fasteners SD-10 Operation and Maintenance Data

3.7Waste Management Plan 10 28 13 SD-03 Product Data

2.1.2 G OMAFinishes

2.2 G OMAAccessory Items

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 73 PAGES

10 28 13 2.1.2 G ROFinishes 2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

SD-10 Operation and Maintenance Data

2.2.11 G ROElectric Hand Dryer

SD-11 Closeout Submittals

1.2 G ROLEED Documentation

10 44 16 SD-01 Preconstruction Submittals

2.1 G ROManufacturer's Data

SD-02 Shop Drawings

2.1 G ROFire Extinguishers

1.3.1Accessories Part 2 G ROCabinets

SD-03 Product Data 2.1Fire Extinguishers 1.3.1Accessories Part 2Cabinets 3.2.1Replacement Parts

SD-04 Samples 1.3.1Fire Extinguisher 1.3.1Cabinet 1.3.1Accessories

SD-07 Certificates 2.1Fire Extinguishers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 73 PAGES

10 44 16 2.1Manufacturer's Warranty with Inspection Tag

10 51 13 SD-02 Shop Drawings 2.1Types 1.4Location 3.1Installation

SD-03 Product Data 2.2Material 2.3.3Handles 2.2.3Finish 2.3components 3.1Assembly

SD-04 Samples

1.5.1 G ROColor chips

12 21 00 SD-02 Shop Drawings

3.3 G OMAInstallation

SD-03 Product Data

2.1 G OMAWindow Blinds

3.3Installation

SD-04 Samples

2.1 G OMAWindow Blinds

SD-06 Test Reports 2.1Window Blinds

SD-08 Manufacturer’s Instructions 2.1Window Blinds

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 73 PAGES

12 21 00 SD-10 Operation and Maintenance Data

2.1Window Blinds 12 35 70 SD-02 Shop Drawings

2.1 G OMAApproved Detail Drawings

SD-03 Product Data

2.1Casework SD-04 Samples

2.1 G ROCasework

3.1.1 G ROWall Hung Cabinets

3.1.2 G ROFloor Mounted Cabinets

3.1.3 G OMACountertops

SD-07 Certificates 2.1Casework

13 48 00 SD-02 Shop Drawings

3.1 G OMABracing

3.4 G OMAResilient Vibration Isolation

Devices

2.1 G OMAEquipment Requirements

SD-03 Product Data

3.1 G OMABracing

2.1 G OMAEquipment Requirements

SD-06 Test Reports

3.3 G OMAAnchor Bolts

13 48 00.00 10 SD-02 Shop Drawings 3.1Coupling and Bracing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 73 PAGES

13 48 00.00 10 3.2Flexible Couplings or Joints 2.1Equipment Requirements

1.2.4 G OMAContractor Designed Bracing

SD-03 Product Data

3.1 G ROCoupling and Bracing

2.1 G ROEquipment Requirements

1.2.4 G ROContractor Designed Bracing

SD-07 Certificates 2.3Flexible Ball Joints

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 G OMAShop Drawings

3.9As-Built Drawings

SD-03 Product Data 1.4.1Fire Protection Related

Submittals

2.3 G OMAMaterials and Equipment

1.6Spare Parts

3.8 G ROPreliminary Tests

3.9 G ROFinal Acceptance Test

3.10 G OMAOnsite Training

1.4.1 G OMAFire Protection Specialist

1.4.2 G OMASprinkler System Installer

SD-05 Design Data

1.4.3 G OMASway Bracing

1.2.1.3 G OMAHydraulic Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 73 PAGES

21 13 13.00 10 3.8Preliminary Test Report 3.9Final Acceptance Test Report

SD-07 Certificates 3.3Inspection by Fire Protection

Specialist SD-10 Operation and Maintenance Data

3.10 G ROOperating and Maintenance

Manuals

22 00 00 SD-02 Shop Drawings

3.7.1 G ROPlumbing System

SD-03 Product Data 2.4Fixtures

2.4.1 G ROFlush valve urinals (UR-1)

2.4.2 G ROFlush tank water closets (WC-1)

2.4.3Countertop lavatories 2.4.4Lab/Break Room sinks (SK-1) 2.4.6Mop sinks

2.4.5 G ROElectric water coolers (EWC-1)

2.7 G ROElectric Water heaters (EWH-1)

2.5.2 G ROShower Valve Assembly

1.5.1Welding 3.7.1Plumbing System

SD-06 Test Reports 3.7Tests, Flushing and Disinfection

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 73 PAGES

22 00 00 1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.7.1 G ROPlumbing System

23 00 00 SD-02 Shop Drawings

1.4.5 G OMADetail Drawings

SD-03 Product Data

2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.9.1.2Duct Connectors

2.9.2 G RODuct Access Doors

2.9.3Fire Dampers

2.9.4 G ROManual Balancing Dampers

2.9.7.1Diffusers 2.9.7.2Registers and Grilles 2.9.8Louvers 2.9.9Penthouses 2.10.1.1Centrifugal Fans 2.10.1.2In-Line Centrifugal Fans 2.10.1.3Ceiling Exhaust Fans 1.4.6Test Procedures

1.2.1.2 G RODiagrams

SD-06 Test Reports

3.11 G ROPerformance…