9r15.pdf
PDF 2 MB Posted
- Solicitation number
- W9128A-09-R-0015
About this file
9r15.pdf is the solicitation part I of 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9r15-am4.pdf | ||
| 9r15-am3.pdf | ||
| 9r15-am2.pdf | ||
| 5r9-am1.pdf | ||
| DB-Am1.pdf | ||
| DBIDIQ.pdf | ||
| DBBIDIQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS NO. W9128A-09-R-0015
Multiple Award Task Order Contract (MATOC) for
Construction Services to include Design Build
Construction Services Within the Honolulu Engineer
District Area of Responsibility
U.S. Army Corps of Engineers
HONOLULU DISTRICT
W9128A-09-R-0015 TOC-1
REQUEST FOR PROPOSALS NO. W9128A-09-R-0015
MAIN TABLE OF CONTENTS
Multiple Award Task Order Contract (MATOC) for Construction Services to include Design Build Construction Services Within the Honolulu Engineer District Area of Responsibility
Section 00010 SF 1442, Proposal Schedule
Section 00100 Instructions to Offerors
Section 00120 Proposal Submission Requirements and
Evaluation Factors
Section 00600 Representations & Certifications Appendix A (SF LLL)
Section 00700 Contract Clauses Appendix A (Wage Rates)
Section 00800 Special Contract Requirements Appendix A (Project Signs)
Instruction to Offerors
1. Offerors are required to COMPLETE AND RETURN the following sections of this solicitation: Sections 00010 and 00600 (ALL) and all Appendices. Offerors shall also follow instructions in Section 00120, “Proposal Submission Requirements and Evaluation Factors”. Please note that the representations and certifications must also be completed electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. Contractors shall also follow instructions in Section 00120, “Proposal Submission Requirements and Evaluation Factors”.
2. See Section 00700, DFARS clause 252.204-7004, Alternate A, regarding registration in the CCR database. Lack of registration in the CCR database will make an offeror ineligible for award.
W9128A-09-R-0015 00010-3
SOLICITATION NO. W9182A-09-R-0015
PROPOSAL SCHEDULE
CLIN DESCRIPTION RATES MANDAYS TOTAL
0001 Project Engineer $_______ 200 $_______________
0002 Quality Control Representative $_______ 200 $_______________
0003 Site Safety and Health Officer $_______ 200 $_______________
Subtotal $_______________
Home Office Overhead Rate ________% $_______________
Total $_______________
_____ Proposals for task order solicitations will include Facilities Capital Cost of Money
_____ Proposals for task order solicitations will not include Facilities Capital Cost of Money
W9128A-09-R-0015 00010-4
NOTES:
1. The Offeror agrees that the rates included in Section 00010 shall be used in the pricing of all task orders and modifications issued for the life of the contract. At the end of an ordering period, the Offeror may request an equitable adjustment to the rates in Section 00010 if the new rate differs by 10% for the labor rates and 2% for the home office overhead rate. The Offeror must submit back-up documentation substantiating the proposed rate and the adjusted rate.
Approval of the revised rate is subject to the approval of the Contracting Officer.
2. Multiple awards will be made to 8(a) firms serviced by the SBA district offices in the Region IX states of California, Nevada, Arizona and Hawaii, and other construction firms with a bona fide place of business (as defined by SBA) within the geographical boundaries of the relevant competitive area. An 8(a) firm not serviced by the Region IX offices must consult its servicing district office regarding the establishment of a bona fide place of business or status of a previously established bona fide place of business. All other firms may be deemed ineligible to submit offers.
3. MEASUREMENT AND PAYMENT. Compensation for all work to be performed under this contract will be made under the payment item(s) listed in the task order. Prices(s) and payment(s) for the item(s) shall cover all work, complete and finished in accordance with the specifications, schedules, and drawings, and shall be full compensation for all work in connection therewith, including quality control and the cost of performance-and payment-bond premiums as specified in the CONTRACT CLAUSES. Price(s) and payment(s) shall constitute full and final compensation for furnishing all materials, equipment, management, supervision, labor, transportation, fuel, power, water, and all incidental items necessary to complete the work, except as otherwise specified to be furnished by the Government. For the purpose of CONTRACT CLAUSE entitled "PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS", the term "designated billing office" and "designated payment office" are as follows:
a. Billing Office
U.S. Army Engineer District, Honolulu Fort Shafter Area Office, Bldg 230 Fort Shafter, HI, 96858-5440
b. Payment Office
USACE Finance Center Attn: CEFC-FP 5722 Integrity Drive Millington, TN 380554-5005
W9128A-09-R-0015 00100-1
Section 00100 - Instructions to Offerors
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
* (As applicable, in accordance with individual task orders)
Any contract awarded as a result of this solicitation will be * DX rated order; * DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.] (End of provision)
52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (JAN 2004)—ALTERNATE I
(OCT 1997)
(a) Definitions. As used in this provision—
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
In writing, writing, or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs ©(1)(i) and ©(1)(ii) of this provision.
(2) The first page of the proposal must show—
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
W9128A-09-R-0015 00100-2
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revisions of proposals. (i) Offerors are responsible for submitting proposals, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
W9128A-09-R-0015 00100-3
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall—
(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government’s interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract after conducting discussions with offerors whose proposals have been determined to be within the competitive range. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
W9128A-09-R-0015 00100-4
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
52.215-16 FACILITIES CAPITAL COST OF MONEY (JUN 2003)
(a) Facilities capital cost of money will be an allowable cost under the contemplated contract, if the criteria for allowability in FAR 31.205-10(b) are met. One of the allowability criteria requires the prospective Contractor to propose facilities capital cost of money in its offer.
(b) If the prospective Contractor does not propose this cost, the resulting contract will include the clause Waiver of Facilities Capital Cost of Money.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of approximately 4-8 firm fixed price Multiple Award Task Order Contracts (MATOC) resulting from this solicitation.
52.216-27 SINGLE OR MULTIPLE AWARDS. (OCT 1995)
The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation.
52.222-5 DAVIS-BACON ACT—SECONDARY SITE OF THE WORK (JUL 2005)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
W9128A-09-R-0015 00100-5
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
69.1% 6.9%
These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
© The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance Requirements for Construction,” and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.
The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer’s identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is the entire State of Hawaii.
W9128A-09-R-0015 00100-6
52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT—CONSTRUCTION MATERIALS (FEB 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
© Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs © and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph © of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT—CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (FEB 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act— Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225- 11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before
W9128A-09-R-0015 00100-7 submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
© Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs © and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph © of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT—CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (FEB 2009) ALTERNATE II (AUG 2007)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act—Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
W9128A-09-R-0015 00100-8
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain or Mexico, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahrainian or Mexican construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs © and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph © of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahrainian or Mexican construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
52.225-22 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER MANUFACTURED
GOODS—BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAR 2009)
(a) Definitions. “Construction material,” “domestic construction material,” “foreign construction material,” “manufactured construction material,” “steel,” and “unmanufactured construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Required Use of Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-21).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21 in the request. If an offeror has not requested a determination regarding the inapplicability of 1605 of the Recovery Act or the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
© Evaluation of offers. (1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American Act by adding to the offered price of the contract—
(i) 25 percent of the offered price of the contract, if foreign iron, steel, or other manufactured goods are used as construction material based on unreasonable cost of comparable manufactured domestic construction material; and
(ii) 6 percent of the cost of foreign unmanufactured construction material included in the offer based on unreasonable cost of comparable domestic unmanufactured construction material.
W9128A-09-R-0015 00100-9
(2) If two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-21, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs © and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph © of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
US Army Engineer District, Honolulu Corps of Engineers, Building 230 Attn: Contracting Officer, Directorate of Contracting, CECT-POH-C Fort Shafter, Hawaii 96858-5440
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-8 OTHER CONTRACTS (APR 1984)
The Government may undertake or award other contracts for additional work at or near the site of the work under this contract. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.
(End of clause)
W9128A-09-R-0015 00100-10
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
* (As applicable, in accordance with individual task orders)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
* [Insert date and time] © Participants will meet at—
* [Insert location] (End of provision)
52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997)
(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.
(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including—
(1) Lump sum price;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.
© If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.
(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.
(End of provision)
252.215-7003 EXCESSIVE PASS-THROUGH CHARGES—IDENTIFICATION OF SUBCONTRACT EFFORT
(MAY 2008)
(a) Definitions. Added value, excessive pass-through charge, subcontract, and subcontractor, as used in this provision, are defined in the clause of this solicitation entitled “Excessive Pass-Through Charges”
(DFARS 252.215-7004).
(b) General. The offeror’s proposal shall exclude excessive pass-through charges.
© Performance of work by the Contractor or a subcontractor.
(1) The offeror shall identify in its proposal the total cost of the work to be performed by the offeror, and the total cost of the work to be performed by each subcontractor, under the contract, task order, or delivery order.
(2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery order, the offeror shall identify in its proposal—
(i) The amount of the offeror’s indirect costs and profit applicable to the work to be performed by the subcontractor(s); and
(ii) A description of the added value provided by the offeror as related to the work to be performed by the subcontractor(s).
(3) If any subcontractor proposed under the contract, task order, or delivery order intends to subcontract to a lower-tier subcontractor more than 70 percent of the total cost of work to be performed under its subcontract, the offeror shall identify in its proposal—
W9128A-09-R-0015 00100-11
(i) The amount of the subcontractor’s indirect costs and profit applicable to the work to be performed by the lower-tier subcontractor(s); and
(ii) A description of the added value provided by the subcontractor as related to the work to be performed by the lower-tier subcontractor(s).
252.236-7006 COST LIMITATION (JAN 1997)
(As applicable, in accordance with individual task orders)
(a)Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.
(b)An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.
©Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.
(d) Offers may be rejected which—
(1)Are materially unbalanced for the purpose of bringing items within cost limitations; or (2)Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.
S-1 POTENTIAL FOR ASBESTOS ABATEMENT (NOV 1998)
The Government is uncertain as to the presence of asbestos in the building(s) or structure(s) to be worked on by the Contractor. If asbestos is discovered during the work, it will be handled in accordance with statement entitled, “PRICE ADJUSTMENT FOR CONTINGENT SCOPE OF WORK”, found in Section 00800 of this solicitation.
[End of Statement]
S-2 ASBESTOS ABATEMENT (AUG 1996)
Asbestos abatement is part of the scope of work for the proposed contract. Refer to paragraphs entitled, “ASBESTOS --- (OCCUPATIONAL HEALTH AND ENVIRONMENTAL)” in Section 00800 and applicable sections of the technical specifications and drawings. The Contractor shall inform responsible representatives of their insurer(s)/surety(ies) that asbestos abatement is required for the proposed contract.
S-3 PRE-AWARD INFORMATION
Each bidder or offeror shall, upon request of the contracting officer, furnish information on whether he is now or ever has been engaged in any work similar to that covered by the specifications herein, the dollar value thereof, the year in which such work was performed, and the manner of its execution, and giving
W9128A-09-R-0015 00100-12 such other information as will tend to show the bidder’s or offeror’s ability to prosecute the required work. The ‘such other information’ referred to above shall include but is not limited to the following:
a. The name and address of the office or firm under which such similar work was performed.
b. A list of key personnel available for the instant project and their qualifications.
c. A copy of bidder’s or offeror’s last three (3) financial statements, including the names of banks or other financial institutions with which the bidder or offeror conducts business. If the latest financial statement is more than 60 days old, a certificate should be attached stating that the financial condition is substantially the same, or if not the same, the changes that have taken place. Such statement will be treated as confidential.
d. A list of present commitments, including the dollar value thereof, and name of office under which the work is being performed.
S-36.2 MAGNITUDE OF THE PROPOSED PROJECT [FAR 36.204]
(a) Physical Characteristics:
Work includes design bid build and design build construction projects to that involve but not limited to such areas as civil, architectural, structural, mechanical, electrical, security, communications, asbestos removal and lead abatement.
(b) Estimated Price Range: The estimated price range of this work is:
The maximum dollar value that the Government will order under all of the contracts awarded will be $100,000.000.00. There is no maximum obligation amount per base or option period. The guaranteed minimum quantity the Government intends to obligate to each awarded contract is $2,000.00.
S-36.33 NOTIFICATION TO OFFERORS – ACCESS TO ARMY INSTALLATIONS.
All vehicle operators must be prepared to provide a valid driver’s license, vehicle registration, certificate of insurance and current safety inspection to the security guard prior to entry to the Installation.
Offerors should anticipate a delay in entering the Installation and allow sufficient time when attending a site visit or pre-proposal conference or hand delivering an offer.
S-36.37 COST LIMITATION - JUNE 1999
The contract award for design and construction shall not exceed $____*____ for this project. Offerors are under no obligation to approach this amount.
S-36.38 COST LIMITATION - TARGET CEILING - JUNE 1999
W9128A-09-R-0015 00100-13
The target ceiling for contract award for design and construction is $_____*______, based on the funds made available for this project. The Government cannot guarantee that additional funds will be made available for award. Offerors are under no obligation to approach this ceiling.
S-36.4 PRE-PROPOSAL CONFERENCE (JUL 1995)
a. A pre-proposal conference will be conducted by the Government on July 13, 2009 starting at 0930 hrs (Hawaii Standard Time) in Building 230, Conference Rooms 322/323, Fort Shafter, Oahu, Hawaii. All planholders (prime contractors, subcontractors, and suppliers) are urged to attend this conference.
Planholders who plan to attend should notify the Government of the number of attendees before the date of the conference. Notification can be made as follows:
(1) Telephone: (808) 438-9700 Point of Contact: Kent Tamai
(2) Facsimile: (808) 438-8588
(3) Mail: U.S. Army Engineer District, Honolulu Corps of Engineers, Bldg 230 ATTN: CECT-POH-C (Kent Tamai) Fort Shafter, Hawaii 96858-5440
b. Any questions planholders may have concerning the project, plans, or specifications should be submitted in writing, on letterhead stationery, sufficiently in advance of the conference, to permit preparation of answers, which will be provided at the conference. The questions should be faxed as soon as possible, and followed by an original through mail. Use the facsimile number and address shown in paragraph a. above. During the conference, written, signed questions will be accepted, and will be answered during the conference if time permits.
c. A complete record of the conference, including questions raised by planholders and answers provided by the Government, will be made and a copy furnished to all planholders. However, any answer, clarification, or explanation given at the conference will not qualify or change the terms of the request for proposal (including the plans and specifications). Unless the request for proposal is amended in writing, it will remain unchanged. If an amendment to the request for proposal is issued as a result of the conference, normal procedures relating to issuance and acknowledgement of receipt will apply.
d. All costs incurred to attend and participate in the pre-proposal conference and any site visits (see paragraph e. below) will be at the expense of the planholder. This includes, but is not limited to, the cost of transportation, per diem, and hotel accommodations.
e. Refer to provision entitled SITE VISIT (CONSTRUCTION) in Section 00100 for information on the pre-proposal site visit.
S-4.1 JOINT VENTURE OFFERORS (JUN 2003)
All Offerors in a Joint Venture shall submit their executed joint venture agreement. In addition, Joint Venture firms must obtain/submit their tax identification number (TIN), Data Universal Numbering System (DUNS) No., Section 00600, Representations and Certifications and register in Central Contractor Registration (CCR) as a joint venture.
W9128A-09-R-0015 00120-1
SECTION 00120
PROPOSAL SUBMISSION REQUIREMENTS
AND EVALUATION FACTORS
1.0 GENERAL
1.1. Cost of Preparing Proposals
The Government will not reimburse any Offeror any costs incurred in responding to this Request for Proposal.
1.2. Inquiries
Address all inquiries regarding this Request for Proposals to:
U.S. Army Engineer District, Honolulu Attn: Kent Tamai (CECT-POH-C) Building 230 - Room 103 Fort Shafter, Hawaii 96858-5440 Phone No. (808) 438-9700 Fax No. (808) 438-8588 E-Mail: kent.a.tamai@usace.army.mil
1.3 Submittal of Proposals
Submit proposal packages to the US Army Corps of Engineers (“the Government”) as shown in Block 8 of Standard Form 1442.
Proposals received by the Government after the date and time set for receipt of proposals will be handled in accordance with the requirements of Provision “52.215-1, Instructions to Offerors⎯Competitive Acquisition (Jan 2004),” subparagraph (c), found in Section 00100.
1.4 Proposal Evaluation
Numerical scores and other point-scoring techniques will not be used in the evaluation process. Each factor will be rated on an adjectival rating system. The Government will evaluate offers in accordance with the NON-PRICE EVALUATION FACTORS described in paragraph 2.5 of this section and the offeror’s proposed total price.
1.5 Contract Award
The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the
W9128A-09-R-0015 00120-2
Government, price and other factors considered.
The Government intends to evaluate proposals and award the contract without discussions with offerors. However, the Government reserves the right to conduct discussions upon the determination and recommendation of the Source Selection Authority (SSA). Therefore, each initial offer should contain the offeror’s best terms from a technical and price standpoint.
The tradeoff process is selected as appropriate for this procurement. The government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror. This process permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal. The perceived benefits of the higher priced proposal shall merit the additional cost, and the rationale for tradeoffs must be documented in the file in accordance with FAR15.406.
2.0 PROPOSAL FORMAT
2.1 General
Proposals shall be submitted in two (2) separate envelopes. All proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g. bold face print or underlining. Proposal replacement pages shall be clearly marked “REVISED”, shall show the date of revision, and shall be submitted in the appropriate number of copies (e.g., if four copies of the original page was required, then four copies of the revised page will also be required).
2.1.1 Volume I, Non-Price Proposal
One envelope shall be clearly marked, “VOLUME I, NON-PRICE PROPOSAL, RFP NO.
W9128A-09-R-0015. It shall contain an original and five (5) copies of the items provided in response to the Non-Price Factors described in paragraph 2.5.
Volume I shall also include the following:
• Original and two copies (certified as a true copy) of the Offeror’s executed joint venture agreement (if the Offeror is a joint venture).
• Non-price Factors I and II
2.1.2 Volume II, Price Proposal
The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .