The file's text, extracted by GovTribe without its formatting.
Region 2 Grnds Maint ELINS
| ATTACHMENT J-0200000-07 – Municipal Services (MS) |
| - 1503050 GROUNDS MAINTENANCE - |
| EXHIBIT LINE ITEM NUMBER SPREADSHEET |
63rd Readiness Division - Region 2
| Site List Information | | | | |
| FAC ID | Site Name | Site Address | County | Site Code |
| TX056 | Midland ARC | 2414 Windecker St., Midland, TX 79711-0197 | Midland | 48793 |
| TX068 | Seagoville ARC | 701 W Simonds Rd., Seagoville, TX 75159-3201 | Dallas | 48837 |
| TX114 | Grand Prairie Reserve Complex | 397 Armed Forces Dr., Grand Prairie, TX 75051-2473 | Dallas | 48941 |
| TX184 | COL James L. Stone ARC | 11280 White Settlement Rd., Fort Worth, TX 76108-4716 | Tarrant | 48878 |
| TX187 | Amarillo AFRC | 4511 NE 24th Ave., Amarillo, TX 79107 | Potter | 48277 |
| TX189 | Lewisville AFRC | 1860 Summit Ave., Lewisville, TX 75077-2501 | Denton | 48622 |
| TX190 | Denton ARC | 3250 Jim Christal Rd., Denton, TX 76207-2602 | Denton | 48797 |
| TX195 | Huntsville AFRC | 1901 Veterans Memorial Parkway, Huntsville, TX 77340-8818 | Walker | 48437 |
| TX196 | Tyler AFRC | 13592 State Highway 31 W, Tyler, TX 75709-5151 | Smith | 48057 |
| TX209 | Lufkin AFRC | 4201 N Medford Dr, Lufkin, TX 75901-1353 | Angelina | 48763 |
| TX213 | Bryan ARC | 2350 N Harvey Mitchell Parkway, Bryan, TX 77807-1204 | Brazos | 48275 |
| Workbook Legend | |
| Sheet Information or Tab instructions |
| Contractor Input Required |
| Autopopulated Cells |
| U.S. Ability One Commission Input |
| Reserved - No input required |
| Revision History: (Latest revision should be color coded. When adding revision, remove color coding on previous revisions.) | |
| Date | Description |
| 28-Mar-2022 | REV- Initial Release of ELINS for Solicitation No. W9127S-22-Q-0029 (revised: W9127S-22-R-6029) |
4-May-2022 REV1 Revised to reflect 3Yr Base + 2 Option Years.
24-May-2022 REV2 Release of ELINS revises the Solicitation No. to W9127S-22-R-6029
&F
CLIN Summary
| ATTACHMENT J-0200000-07 – Municipal Services (MS) |
| - 1503050 GROUNDS MAINTENANCE - |
| EXHIBIT LINE ITEM NUMBER SPREADSHEET |
THIS SHEET POPULATES AUTOMATICALLY AS SHADED CELLS ON SUBSEQUENT SHEETS ARE FILLED OUT. PLEASE VERIFY AMOUNTS FOR CLINS 0003 - 0006, 1003 - 1006, 2003 - 2006, 3003 - 3006, 4003 - 4006, and 5003 - 5006 AT SHADED CELLS BELOW.
Grounds Maintenance CLIN Summary
| Service Code: 404 | | |
| CLIN | DESCRIPTION | TOTAL |
| 0003 | Base Year 1 Grounds Maintenance Firm Fixed-Price | $ 31,320.00 |
| 0004 | Base Year 1 Grounds Maintenance Indefinite Quantity | $70,000.00 |
| 0005 | Base Year 1 Contractor Manpower Reporting | $0.00 |
| 0006 | Base Year 1 Contractor Submittals | $0.00 |
| 1003 | Base Year 2 Grounds Maintenance Firm Fixed-Price | $ 31,320.00 |
| 1004 | Base Year 2 Grounds Maintenance Indefinite Quantity | $70,000.00 |
| 1005 | Base Year 2 Contractor Manpower Reporting | $0.00 |
| 1006 | Base Year 2 Contractor Submittals | $0.00 |
| 2003 | Base Year 3 Grounds Maintenance Firm Fixed-Price | $ 31,320.00 |
| 2004 | Base Year 3 Grounds Maintenance Indefinite Quantity | $70,000.00 |
| 2005 | Base Year 3 Contractor Manpower Reporting | $0.00 |
| 2006 | Base Year 3 Contractor Submittals | $0.00 |
| 3003 | First Option Year Grounds Maintenance Firm Fixed-Price | $ 31,320.00 |
| 3004 | First Option Year Grounds Maintenance Indefinite Quantity | $70,000.00 |
| 3005 | First Option Year Contractor Manpower Reporting | $0.00 |
| 3006 | First Option Year Contractor Submittals | $0.00 |
| 4003 | Second Option Year Grounds Maintenance Firm Fixed-Price | $ 31,320.00 |
| 4004 | Second Option Year Grounds Maintenance Indefinite Quantity | $70,000.00 |
| 4005 | Second Option Year Contractor Manpower Reporting | $0.00 |
| 4006 | Second Option Year Contractor Submittals | $0.00 |
TOTAL MUNICIPAL SERVICES - GROUNDS MAINTENANCE $ 506,600.00
| CLIN | DESCRIPTION | TOTAL |
| 5003 | 6 Month Extension Grounds Maintenance Firm Fixed Price | $15,660.00 |
| 5004 | 6 Month Extension Grounds Maintenance Indefinite Quantity | $35,000.00 |
| 5005 | 6 Month Extension Contractor Manpower Reporting | $0.00 |
| 5006 | 6 Month Extension Contractor Submittals | $0.00 |
Total 6 Month Extension Municipal Services - Grounds Maintenance $50,660.00
&F
&A &P of &N
Site Summary Sheet
| ATTACHMENT J-0200000-07 – Municipal Services (MS) | Return to ELIN Summary |
| - 1503050 GROUNDS MAINTENANCE - | |
| EXHIBIT LINE ITEM NUMBER SPREADSHEET | |
THIS SHEET POPULATES AUTOMATICALLY AS SHADED CELLS ON SUBSEQUENT SHEETS ARE FILLED OUT. PLEASE VERIFY AMOUNTS FOR CLINS & SUBCLINS AT SHADED CELLS BELOW.
Site Summary Sheet
| CLIN 0003 | Base Year 1 Grounds Maintenance Firm Fixed-Price | | |
| SUBCLIN | FAC ID | ELINs | Total Price |
| 0003AA | TX056 | (Items A001 Through A006) | $0.00 |
| 0003AB | TX068 | (Items A007 Through A012) | $0.00 |
| 0003AC | TX114 | (Items A013 Through A018) | $0.00 |
| 0003AD | TX184 | (Items A019 Through A024) | $0.00 |
| 0003AE | TX187 | (Items A025 Through A030) | $0.00 |
| 0003AF | TX189 | (Items A031 Through A036) | $0.00 |
| 0003AG | TX190 | (Items A037 Through A042) | $0.00 |
| 0003AH | TX195 | (Items A043 Through A048) | $31,320.00 |
| 0003AJ | TX196 | (Items A049 Through A054) | $0.00 |
| 0003AK | TX209 | (Items A055 Through A060) | $0.00 |
| 0003AL | TX213 | (Items A061 Through A066) | $0.00 |
| | TOTAL BASE YEAR 1 FFP | $31,320.00 |
| CLIN 1003 | Base Year 2 Grounds Maintenance Firm Fixed-Price | | |
| SUBCLIN | FAC ID | ELINs | Total Price |
| 1003AA | TX056 | (Items B001 Through B006) | $0.00 |
| 1003AB | TX068 | (Items B007 Through B012) | $0.00 |
| 1003AC | TX114 | (Items B013 Through B018) | $0.00 |
| 1003AD | TX184 | (Items B019 Through B024) | $0.00 |
| 1003AE | TX187 | (Items B025 Through B030) | $0.00 |
| 1003AF | TX189 | (Items B031 Through B036) | $0.00 |
| 1003AG | TX190 | (Items B037 Through B042) | $0.00 |
| 1003AH | TX195 | (Items B043 Through B048) | $31,320.00 |
| 1003AJ | TX196 | (Items B049 Through B054) | $0.00 |
| 1003AK | TX209 | (Items B055 Through B060) | $0.00 |
| 1003AL | TX213 | (Items B061 Through B066) | $0.00 |
| | TOTAL BASE YEAR 2 FFP | $31,320.00 |
| CLIN 2003 | Base Year 3 Grounds Maintenance Firm Fixed-Price | | |
| SUBCLIN | FAC ID | ELINs | Total Price |
| 2003AA | TX056 | (Items C001 Through C006) | $0.00 |
| 2003AB | TX068 | (Items C007 Through C012) | $0.00 |
| 2003AC | TX114 | (Items C013 Through C018) | $0.00 |
| 2003AD | TX184 | (Items C019 Through C024) | $0.00 |
| 2003AE | TX187 | (Items C025 Through C030) | $0.00 |
| 2003AF | TX189 | (Items C031 Through C036) | $0.00 |
| 2003AG | TX190 | (Items C037 Through C042) | $0.00 |
| 2003AH | TX195 | (Items C043 Through C048) | $31,320.00 |
| 2003AJ | TX196 | (Items C049 Through C054) | $0.00 |
| 2003AK | TX209 | (Items C055 Through C060) | $0.00 |
| 2003AL | TX213 | (Items C061 Through C066) | $0.00 |
| | TOTAL BASE YEAR 3 FFP | $31,320.00 |
| CLIN 3003 | First Option Year Grounds Maintenance Firm Fixed-Price | | |
| SUBCLIN | FAC ID | ELINs | Total Price |
| 3003AA | TX056 | (Items D001 Through D006) | $0.00 |
| 3003AB | TX068 | (Items D007 Through D012) | $0.00 |
| 3003AC | TX114 | (Items D013 Through D018) | $0.00 |
| 3003AD | TX184 | (Items D019 Through D024) | $0.00 |
| 3003AE | TX187 | (Items D025 Through D030) | $0.00 |
| 3003AF | TX189 | (Items D031 Through D036) | $0.00 |
| 3003AG | TX190 | (Items D037 Through D042) | $0.00 |
| 3003AH | TX195 | (Items D043 Through D048) | $31,320.00 |
| 3003AJ | TX196 | (Items D049 Through D054) | $0.00 |
| 3003AK | TX209 | (Items D055 Through D060) | $0.00 |
| 3003AL | TX213 | (Items D061 Through D066) | $0.00 |
| | TOTAL FIRST OPTION YEAR FFP | $31,320.00 |
| CLIN 4003 | Second Option Year Grounds Maintenance Firm Fixed-Price | | |
| SUBCLIN | FAC ID | ELINs | Total Price |
| 4003AA | TX056 | (Items E001 Through E006) | $0.00 |
| 4003AB | TX068 | (Items E007 Through E012) | $0.00 |
| 4003AC | TX114 | (Items E013 Through E018) | $0.00 |
| 4003AD | TX184 | (Items E019 Through E024) | $0.00 |
| 4003AE | TX187 | (Items E025 Through E030) | $0.00 |
| 4003AF | TX189 | (Items E031 Through E036) | $0.00 |
| 4003AG | TX190 | (Items E037 Through E042) | $0.00 |
| 4003AH | TX195 | (Items E043 Through E048) | $31,320.00 |
| 4003AJ | TX196 | (Items E049 Through E054) | $0.00 |
| 4003AK | TX209 | (Items E055 Through E060) | $0.00 |
| 4003AL | TX213 | (Items E061 Through E066) | $0.00 |
| | TOTAL SECOND OPTION YEAR FFP | $31,320.00 |
| CLIN 5003 | 6 Month Extension Grounds Maintenance Firm Fixed-Price | | |
| SUBCLIN | FAC ID | ELINs | Total Price |
| 5003AA | TX056 | (Items F001 Through F006) | $0.00 |
| 5003AB | TX068 | (Items F007 Through F012) | $0.00 |
| 5003AC | TX114 | (Items F013 Through F018) | $0.00 |
| 5003AD | TX184 | (Items F019 Through F024) | $0.00 |
| 5003AE | TX187 | (Items F025 Through F030) | $0.00 |
| 5003AF | TX189 | (Items F031 Through F036) | $0.00 |
| 5003AG | TX190 | (Items F037 Through F042) | $0.00 |
| 5003AH | TX195 | (Items F043 Through F048) | $15,660.00 |
| 5003AJ | TX196 | (Items F049 Through F054) | $0.00 |
| 5003AK | TX209 | (Items F055 Through F060) | $0.00 |
| 5003AL | TX213 | (Items F061 Through F066) | $0.00 |
| | TOTAL 6 MONTH EXTENSION FFP | $15,660.00 |
&F
&P of &N
ELINS BASE YEAR 1 FFP
| ATTACHMENT J-0200000-07 – Municipal Services (MS) | Return to ELIN Summary |
| - 1503050 GROUNDS MAINTENANCE - | |
| EXHIBIT LINE ITEM NUMBER SPREADSHEET | |
MOST CELLS ON THIS SHEET POPULATE AUTOMATICALLY AS SHADED DATA ENTRY CELLS ARE FILLED OUT.
PLEASE ENTER AMOUNTS FOR CLIN 0003 (ELINS A001 THRU A066), CLIN 0005, CLIN 0006 AT SHADED CELLS BELOW.
INSTRUCTIONS: ENTER PRICES ($) IN "UNIT PRICE" COLUMN & PERCENTAGES (%) IN "ADMIN FEE-SOURCE AMERICA (%)" COLUMN, TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 THROUGH A066. MANDATORY SOURCE AMERICA SITES WILL REQUIRE AN ADMIN FEE(%) ONLY, AS MONTHLY PRICING SET BY U.S. ABILITYONE COMMISION IS PROVIDED AND MAY CHANGE.
| CLIN 0003 - Base Year 1 - Grounds Maintenance Firm Fixed Price Work | | | | | | |
| FACID | SITE NAME | SITE CODE | | | | |
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | Admin Fee Source America (%) | TOTAL |
| TX056 | Midland ARC | 48793 | | | | |
| A001 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A002 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| A003 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| A004 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A005 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| A006 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AA (Items A001 Through A006) | $ - 0 |
| TX068 | Seagoville ARC | 48837 | | | | |
| A007 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A008 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| A009 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| A010 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A011 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Months | $ - 0 | | $ - 0 |
| A012 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AB (Items A007 Through A012) | $ - 0 |
| TX114 | Grand Prairie Reserve Complex | 48491 | | | | |
| A013 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A014 | Semi-Improved Grounds (Spec Item C 3.2) | 0.0 | Months | | | |
| A015 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| A016 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A017 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Months | $ - 0 | | $ - 0 |
| A018 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AC (Items A013 Through A018) | $ - 0 |
| TX184 | COL James L. Stone ARC | 48878 | | | | |
| A019 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A020 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| A021 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| A022 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A023 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Months | $ - 0 | | $ - 0 |
| A024 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AD (Items A019 Through A024) | $ - 0 |
| TX187 | Amarillo AFRC | 48277 | | | | |
| A025 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A026 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| A027 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ - 0 | | $ - 0 |
| A028 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A029 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| A030 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AE (Items A025 Through A030) | $ - 0 |
| TX189 | Lewisville AFRC | 48622 | | | | |
| A031 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A032 | Semi-Improved Grounds (Spec Item C 3.2) | 0.0 | Months | | | |
| A033 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ - 0 | | $ - 0 |
| A034 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A035 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| A036 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AF (Items A031 Through A036) | $ - 0 |
| TX190 | Denton ARC | 48797 | | | | |
| A037 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A038 | Semi-Improved Grounds (Spec Item C 3.2) | 0.0 | Months | | | |
| A039 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| A040 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A041 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| A042 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AG (Items A036 Through A042) | $ - 0 |
| TX195 | Huntsville AFRC | 48437 | | | 0.00% | |
| A043 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ 1,420.00 | | $ 17,040.00 |
| A044 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ 270.00 | | $ 3,240.00 |
| A045 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ 140.00 | | $ 1,680.00 |
| A046 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ 390.00 | | $ 4,680.00 |
| A047 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| A048 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ 390.00 | | $ 4,680.00 |
| | | | | Total CLIN 0003AH (Items A043 Through A048) | $ 31,320.00 |
| TX196 | Tyler AFRC | 48057 | | | | |
| A049 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A050 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| A051 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ - 0 | | $ - 0 |
| A052 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A053 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| A054 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AJ (Items A049 Through A054) | $ - 0 |
| TX209 | LUFKIN AFRC | 48763 | | | | |
| A055 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A056 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| A057 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ - 0 | | $ - 0 |
| A058 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A059 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| A060 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AK (Items A055 Through A060) | $ - 0 |
| TX213 | Bryan ARC | 48275 | | | | |
| A061 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| A062 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| A063 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| A064 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| A065 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| A066 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 0003AL (Items A061 Through A066) | $ - 0 |
TOTAL CLIN 0003 - Base Year 1 - Grounds Maintenance Firm Fixed Price Work $ 31,320.00
| CLIN 0005 - Base Year 1 - Contractor Manpower Reporting | | | | | |
| CLIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | |
| 0005 | Contractor Manpower Reporting; Section C 0200000 Mgmt & Admin Spec 2.15 | 1 | Each | $ - 0 | $ - 0 |
| CLIN 0006 - Base Year 1 - Contractor Pre-Work Submittals | | | | | |
| CLIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | |
| 0006 | Contractor Pre-Work Submittals; Section F Submittals | 1 | Each | $ - 0 | $ - 0 |
&F
&P of &N
ELINS BASE YEAR 1 IQ
| ATTACHMENT J-0200000-07 – Municipal Services (MS) | Return to ELIN Summary |
| - 1503050 GROUNDS MAINTENANCE - | |
| EXHIBIT LINE ITEM NUMBER SPREADSHEET | |
PLEASE ENTER AMOUNTS IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 CLIN 0004 (ELINS A701 - A728) AT SHADED CELLS BELOW.
| | CLIN 0004 - Base Year 1 - Grounds Maintenance Indefinite Quantity Work | | | | | |
| | ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | UNIT PRICE | UNIT OF ISSUE | MIN ORDER QTY |
| | A701 | Tree and Stump Removal | | | | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | | | | | |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | $ - 0 | Each | 1 |
| | A702 | Tree and Stump Removal |
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | $ - 0 | Each | 1 |
| | A703 | Tree and Stump Removal |
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| | A704 | Shrub and Stump Removal |
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| | A705 | Shrub and Stump Removal |
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| | A706 | Shrub and Stump Removal |
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 1 |
| | A707 | Complete Tree Pruning |
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | | |
| Work shall be completed within 1 calendar day. | $ - 0 | Each | 1 |
| | A708 | Complete Tree Pruning |
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | | |
| Work shall be completed within 2 calendar days. | $ - 0 | Each | 1 | | | | |
| | A709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | $ - 0 | Each | 1 |
| | A710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. | | | |
| Seed species will be identified in the task order. | $ - 0 | SF | 50 | |
| | A711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | |
| | A712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | |
| | A713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | | | | |
| | A714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 10 |
| | A715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. | | | |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 | |
| | A716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 | | | | |
| | A717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 |
| | A718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | | | |
| Work shall be completed within 14 calendar days. | $ - 0 | SF | 100 | | | | |
| | A719 | Aerate | Grass shall be aerated to promote health and growth. | | | |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 | |
| | A720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 5 | |
| | A721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | L.F. | 100 | | | | |
| | A722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | $ - 0 | SF | 50 |
| | A723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 |
| | A724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | $ - 0 | SF | 5,000 |
| | A725 | Control Undesired Vegetation | Remove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | | | |
| Work shall be completed within 10 calendar days. | $ - 0 | LF | 100 | | | | |
| | A726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. | | | |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 50 | |
| | A727 | Plant Native Vegetation | All native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape. |
| Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 10 |
| | A728 | Special Event Servicing |
| (ELINs A728A thru A728L) | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. | | |
Price provided for Special Event Servicing by site.
| A728A | TX056 - Special Event Servicing | $ - 0 | Each | 1 |
| A728B | TX068 - Special Event Servicing | $ - 0 | Each | 1 |
| A728C | TX114 - Special Event Servicing | $ - 0 | Each | 1 |
| A728D | TX184 - Special Event Servicing | $ - 0 | Each | 1 |
| A728E | TX187 - Special Event Servicing | $ - 0 | Each | 1 |
| A728F | TX189 - Special Event Servicing | $ - 0 | Each | 1 |
| A728G | TX190 - Special Event Servicing | $ - 0 | Each | 1 |
| A728H | TX195 - Special Event Servicing | $ - 0 | Each | 1 |
| A728J | TX196 - Special Event Servicing | $ - 0 | Each | 1 |
| A728K | TX209 - Special Event Servicing | $ - 0 | Each | 1 |
| A728L | TX213 - Special Event Servicing | $ - 0 | Each | 1 |
TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A728 $70,000.00
&F
&P of &N
ELINS BASE YEAR 2 FFP
| ATTACHMENT J-0200000-07 – Municipal Services (MS) | Return to ELIN Summary |
| - 1503050 GROUNDS MAINTENANCE - | |
| EXHIBIT LINE ITEM NUMBER SPREADSHEET | |
MOST CELLS ON THIS SHEET POPULATE AUTOMATICALLY AS SHADED DATA ENTRY CELLS ARE FILLED OUT.
PLEASE ENTER AMOUNTS FOR CLIN 1003 (ELINS B001 THRU B066), CLIN 1005, CLIN 1006 AT SHADED CELLS BELOW.
INSTRUCTIONS: ENTER PRICES ($) IN "UNIT PRICE" COLUMN & PERCENTAGES (%) IN "ADMIN FEE-SOURCE AMERICA (%)" COLUMN, TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 THROUGH B066. MANDATORY SOURCE AMERICA SITES WILL REQUIRE AN ADMIN FEE(%) ONLY, AS MONTHLY PRICING SET BY U.S. ABILITYONE COMMISION IS PROVIDED AND MAY CHANGE.
| CLIN 1003 - Base Year 2 - Grounds Maintenance Firm Fixed Price Work | | | | | | |
| FACID | SITE NAME | SITE CODE | | | | |
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | Admin Fee Source America (%) | TOTAL |
| TX056 | Midland USARC | 48793 | | | | |
| B001 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B002 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| B003 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| B004 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B005 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| B006 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AA (Items B001 Through B006) | $ - 0 |
| TX068 | Seagoville USARC | 48837 | | | | |
| B007 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B008 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| B009 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| B010 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B011 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Months | $ - 0 | | $ - 0 |
| B012 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AB (Items B007 Through B012) | $ - 0 |
| TX114 | Grand Prairie Reserve Complex | 48491 | | | | |
| B013 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B014 | Semi-Improved Grounds (Spec Item C 3.2) | 0.0 | Months | | | |
| B015 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| B016 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B017 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Months | $ - 0 | | $ - 0 |
| B018 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AC (Items B013 Through B018) | $ - 0 |
| TX184 | Fort Worth AFRC/OMS/Storage | 48878 | | | | |
| B019 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B020 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| B021 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| B022 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B023 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Months | $ - 0 | | $ - 0 |
| B024 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AD (Items B019 Through B024) | $ - 0 |
| TX187 | Amarillo AFRC | 48277 | | | | |
| B025 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B026 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| B027 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ - 0 | | $ - 0 |
| B028 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B029 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| B030 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AE (Items B025 Through B030) | $ - 0 |
| TX189 | Lewisville AFRC | 48622 | | | | |
| B031 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B032 | Semi-Improved Grounds (Spec Item C 3.2) | 0.0 | Months | | | |
| B033 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ - 0 | | $ - 0 |
| B034 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B035 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| B036 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AF (Items B031 Through B036) | $ - 0 |
| TX190 | Denton USARC | 48797 | | | | |
| B037 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B038 | Semi-Improved Grounds (Spec Item C 3.2) | 0.0 | Months | | | |
| B039 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| B040 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B041 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| B042 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AG (Items B037 Through B042) | $ - 0 |
| TX195 | Huntsville AFRC | 48437 | | | 0.00% | |
| B043 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ 1,420.00 | | $ 17,040.00 |
| B044 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ 270.00 | | $ 3,240.00 |
| B045 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ 140.00 | | $ 1,680.00 |
| B046 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ 390.00 | | $ 4,680.00 |
| B047 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| B048 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ 390.00 | | $ 4,680.00 |
| | | | | Total CLIN 1003AH (Items B043 Through B048) | $ 31,320.00 |
| TX196 | Tyler AFRC | 48057 | | | | |
| B049 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B050 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| B051 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ - 0 | | $ - 0 |
| B052 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B053 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| B054 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AJ (Items B049 Through B054) | $ - 0 |
| TX209 | LUFKIN AFRC | 48763 | | | | |
| B055 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B056 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| B057 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Months | $ - 0 | | $ - 0 |
| B058 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B059 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| B060 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AK (Items B055 Through B060) | $ - 0 |
| TX213 | Bryan USARC/OMS/Storage | 48275 | | | | |
| B061 | Improved Grounds (Spec Item C 3.1) | 12.0 | Months | $ - 0 | | $ - 0 |
| B062 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Months | $ - 0 | | $ - 0 |
| B063 | Xeriscape Grounds (Spec Item C 3.3) | 0.0 | Months | | | |
| B064 | Paved Areas (Spec Item C 3.4) | 12.0 | Months | $ - 0 | | $ - 0 |
| B065 | Un-Paved Areas (Spect Item C 3.5) | 0.0 | Months | | | |
| B066 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Months | $ - 0 | | $ - 0 |
| | | | | Total CLIN 1003AL (Items B061 Through B066) | $ - 0 |
TOTAL CLIN 1003 - Base Year 2 - Grounds Maintenance Firm Fixed Price Work $ 31,320.00
| CLIN 1005 - Base Year 2 - Contractor Manpower Reporting | | | | | |
| CLIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | |
| 1005 | Contractor Manpower Reporting; Section C 0200000 Mgmt & Admin Spec 2.15 | 1 | Each | $ - 0 | $ - 0 |
| CLIN 1006 - Base Year 2 - Contractor Pre-Work Submittals | | | | | |
| CLIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | |
| 1006 | Contractor Pre-Work Submittals; Section F Submittals | 1 | Each | $ - 0 | $ - 0 |
&F
&P of &N
ELINS BASE YEAR 2 IQ
| ATTACHMENT J-0200000-07 – Municipal Services (MS) | Return to ELIN Summary |
| - 1503050 GROUNDS MAINTENANCE - | |
| EXHIBIT LINE ITEM NUMBER SPREADSHEET | |
PLEASE ENTER AMOUNTS IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 CLIN 1004 (ELINS B701 - B728) AT SHADED CELLS BELOW.
| | CLIN 1004 - Base Year 2 - Grounds Maintenance Indefinite Quantity Work | | | | | |
| | ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | UNIT PRICE | UNIT OF ISSUE | MIN ORDER QTY |
| | B701 | Tree and Stump Removal | | | | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | | | | | |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | $ - 0 | Each | 1 |
| | B702 | Tree and Stump Removal |
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | $ - 0 | Each | 1 |
| | B703 | Tree and Stump Removal |
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| | B704 | Shrub and Stump Removal |
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| | B705 | Shrub and Stump Removal |
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| | B706 | Shrub and Stump Removal |
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | | |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 1 |
| | B707 | Complete Tree Pruning |
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | | |
| Work shall be completed within 1 calendar day. | $ - 0 | Each | 1 |
| | B708 | Complete Tree Pruning |
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. | | |
| Work shall be completed within 2 calendar days. | $ - 0 | Each | 1 | | | | |
| | B709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | $ - 0 | Each | 1 |
| | B710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. | | | |
| Seed species will be identified in the task order. | $ - 0 | SF | 50 | |
| | B711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | |
| | B712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | |
| | B713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | | | | |
| | B714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 10 |
| | B715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. | | | |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 | |
| | B716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 | | | | |
| | B717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 |
| | B718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | | | |
| Work shall be completed within 14 calendar days. | $ - 0 | SF | 100 | | | | |
| | B719 | Aerate | Grass shall be aerated to promote health and growth. | | | |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 | |
| | B720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 5 | |
| | B721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | L.F. | 100 | | | | |
This is the start of the file's text. The full file is on GovTribe.