A.07.23_RFP_W9127S18R0011.pdf

PDF 1 MB Posted

Attached to
Greers Ferry - Park Maintenance Federal contract opportunity
Solicitation number
W9127S18R0011
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

Request for Proposal W9127S18R0011

View the file

Other files for this federal contract opportunity

Other files attached to Greers Ferry - Park Maintenance, newest first.
File Type Posted
A.07.23_RFP_W9127S18R0011_Amendment_2.pdf PDF
A.07.23_RFP_W9127S18R0011_Amendment_1.pdf PDF
A.04.36_Wage_Rates.pdf PDF
A.01.30_PWS_Including_All_Technical_Exhibits.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9127S18R0011 20-Dec-2017

b. TELEPHONE NUMBER

501.340.1271

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 08 Jan 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9127S9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JOSEPH D SHERWOOD

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

USACE, LITTLE ROCK (W9127S)

700 W. CAPITOL AVE, RM 7315

LITTLE ROCK AR 72201-3225

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 967116 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

GREERS FERRY PROJECT OFFICE

700 HEBER SPRINGS ROAD NORTH

HEBER SPRINGS AR 72543-1088

TEL: 501.362.2416 FAX: 501.324.6985

(501) 324-5196FAX:

TEL: (501) 340-5720 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$15,000,000

NAICS:

238990

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF144

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9127S18R0011

Section SF 1449 - CONTINUATION SHEET

RFP ISSUED IAW

This is notification this RFP shall be issued utilizing Simplified Acquisition Procedures (SAP) IAW FAR 13.500(a).

Further instructions to offerors is identified under the INSTRUCTIONS TO OFFERORS / PROPOSAL SUBMISSION INSTRUCTIONS and evaluation criteria identified under PROPOSAL EVALUATION

SUMMARY.

END OF RFP ISSUED IAW

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 50 Each Service Call

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all attachments FOB: Destination

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 20 Each Emergency Service Call

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0003 250 Hours Unscheduled Labor Hours

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0004 5,000 Each Materials Cost

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0005 50 Each Replace/Install Lantern Hanger

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0006 50 Each Replace/Install Fire Ring Grill

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0007 10 Each Replace/Install Pedestal BBQ Grill

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0008 100 Each Replace/Install Single Post Sign

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0009 50 Each Replace/Installl Double Post Sign

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0010 300 Cubic Yard

Place/Spread Topsoil

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0011 300 Cubic

Place/Spread Fill Material

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0012 300 Ton Miles

Place/Spread Screenings

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0013 500 Ton

Place/Spread Aggregate Base Material

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0014 500 Ton

Place/Spread Sand

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0015 300 Ton

Place/Spread Quarry Run Stone

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0016 300 Ton

Place/Spread B-Stone

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0017 100 Each Remove Tree 4-12"

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0018 50 Each Remove Tree 12-30"

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0019 1,000 Linear Foot

Replace/Install Bottom Layer Landscape

Park Maintenance - Replace/Install Bottom Layer Landscape Timbers, Performed IAW the PWS, contract requirements, and all attachments

UNIT UNIT PRICE MAX AMOUNT

0020 3,000 Linear

Replace/Install Top Layer Landscape Timb

Park Maintenance - Replace/Install Top Layer Landscape Timbers, Performed

UNIT UNIT PRICE MAX AMOUNT

0021 2,500 Square

Place 4" Concrete Slab

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0022 2,000 Square

Place 6" Concrete Slab

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0023 2,000 Square

Place Launch Ramp Concrete

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0024 30 Each Replace/Install Aluminum Picnic Table

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0025 50 Each Replace/Install Concrete Wheel Stop

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0026 1,000 Cubic

Cleanup Storm/Highwater Debris

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0027 400 Hours Dump Truck with Driver

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0028 500 Hours Backhoe with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0029 500 Hours Bulldozer with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0030 40 Hours Vibratory Plate Compactor with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0031 100 Hours Vibratory Roller with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0032 20 Hours Concrete/Asphalt Saw with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

0033 100 Each Service Call

FFP

Electrical - Performed IAW the PWS, contract requirements, and all attachments

UNIT UNIT PRICE MAX AMOUNT

0034 20 Each Emergency Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

0035 300 Hours Unscheduled Labor Hours

FFP

UNIT UNIT PRICE MAX AMOUNT

0036 50,000 Each Materials Cost

FFP

UNIT UNIT PRICE MAX AMOUNT

0037 40 Each Replace/Install 50amp electric pedestal

FFP

UNIT UNIT PRICE MAX AMOUNT

0038 20 Each Replace/Install 30amp electric pedestal

FFP

UNIT UNIT PRICE MAX AMOUNT

0039 1 Each Park Preseason Electrical Check

FFP

UNIT UNIT PRICE MAX AMOUNT

0040 5,000 Linear

Excavation for Electrical Lines

UNIT UNIT PRICE MAX AMOUNT

0041 1,000 Linear

Excavation for Utility Company Lines

UNIT UNIT PRICE MAX AMOUNT

0042 10 Each Replace/Install Electric Riser

FFP

UNIT UNIT PRICE MAX AMOUNT

0043 10 Each Replace/Install Electric Panelboard

FFP

UNIT UNIT PRICE MAX AMOUNT

0044 10 Each Replace/Install Electric Wireway

FFP

UNIT UNIT PRICE MAX AMOUNT

0045 10 Each Replace/Install Electric Safety Disconne

FFP

Electrical - Replace/Install Electric Safety Disconnect, Performed IAW the PWS, contract requirements, and all attachments

UNIT UNIT PRICE MAX AMOUNT

0046 10 Each Replace/Install Electric Meter Base

FFP

UNIT UNIT PRICE MAX AMOUNT

0047 500 Linear

Utility Road Crossing

UNIT UNIT PRICE MAX AMOUNT

0048 500 Linear

Rock Excavation for Utility Lines

UNIT UNIT PRICE MAX AMOUNT

0049 25 Each Sewer Lift Station Electrical Check

FFP

UNIT UNIT PRICE MAX AMOUNT

0050 100 Each Service Call

FFP

Plumbing - Performed IAW the PWS, contract requirements, and all attachments

UNIT UNIT PRICE MAX AMOUNT

0051 30 Each Emergency Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

0052 300 Hours Unscheduled Labor Hours

FFP

UNIT UNIT PRICE MAX AMOUNT

0053 50,000 Each Materials Cost

FFP

UNIT UNIT PRICE MAX AMOUNT

0054 20 Each Repair Water Leak

FFP

UNIT UNIT PRICE MAX AMOUNT

0055 12 Each Unplug Sewer System

FFP

UNIT UNIT PRICE MAX AMOUNT

0056 12 Each Replace Sewer Pump

FFP

UNIT UNIT PRICE MAX AMOUNT

0057 1 Each Start Up Water System

FFP

UNIT UNIT PRICE MAX AMOUNT

0058 1 Each Shut Down Water System

FFP

UNIT UNIT PRICE MAX AMOUNT

0059 5,000 Linear

Replace/Install Underground Water Line 3

Plumbing - Replace/Install Underground Water Line 3/4 - 2", Performed IAW the PWS, contract requirements, and all attachments

UNIT UNIT PRICE MAX AMOUNT

0060 1,000 Linear

Replace/Install Underground Water Line 2

Plumbing - Replace/Install Underground Water Line 2 - 4", Performed IAW the

UNIT UNIT PRICE MAX AMOUNT

0061 500 Linear

Replace/Install Underground sewer line 2

Plumbing - Replace/Install Underground sewer line 2 - 4", Performed IAW the

UNIT UNIT PRICE MAX AMOUNT

0062 500 Linear

Utility Road Crossing

UNIT UNIT PRICE MAX AMOUNT

0063 500 Linear

Rock Excavation for Utility Lines

UNIT UNIT PRICE MAX AMOUNT

0064 40 Each Replace Freeze Reistant Water Hydrant

FFP

UNIT UNIT PRICE MAX AMOUNT

0065 10 Each Sewer System Inspection

FFP

UNIT UNIT PRICE MAX AMOUNT

0066 20 Each Inspect Reduce Pressure Zone Assembly

FFP

UNIT UNIT PRICE MAX AMOUNT

1001 50 Each OPTION Service Call

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1002 20 Each OPTION Emergency Service Call

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1003 250 Hours OPTION Unscheduled Labor Hours

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1004 5,000 Each OPTION Materials Cost

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1005 50 Each OPTION Replace/Install Lantern Hanger

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1006 50 Each OPTION Replace/Install Fire Ring Grill

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1007 10 Each OPTION Replace/Install Pedestal BBQ Grill

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1008 100 Each OPTION Replace/Install Single Post Sign

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1009 50 Each OPTION Replace/Installl Double Post Sign

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1010 300 Cubic

OPTION Place/Spread Topsoil

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1011 300 Cubic

OPTION Place/Spread Fill Material

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1012 300 Ton

OPTION Place/Spread Screenings

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1013 500 Ton

OPTION Place/Spread Aggregate Base Material

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1014 500 Ton

OPTION Place/Spread Sand

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1015 300 Ton

OPTION Place/Spread Quarry Run Stone

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1016 300 Ton

OPTION Place/Spread B-Stone

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1017 100 Each OPTION Remove Tree 4-12"

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1018 50 Each OPTION Remove Tree 12-30"

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1019 1,000 Linear

OPTION Replace/Install Bottom Layer Landscape

Park Maintenance - Replace/Install Bottom Layer Landscape Timbers, Performed

UNIT UNIT PRICE MAX AMOUNT

1020 3,000 Linear

OPTION Replace/Install Top Layer Landscape Timb

Park Maintenance - Replace/Install Top Layer Landscape Timbers, Performed

UNIT UNIT PRICE MAX AMOUNT

1021 2,500 Square

OPTION Place 4" Concrete Slab

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1022 2,000 Square

OPTION Place 6" Concrete Slab

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1023 2,000 Square

OPTION Place Launch Ramp Concrete

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1024 30 Each OPTION Replace/Install Aluminum Picnic Table

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1025 50 Each OPTION Replace/Install Concrete Wheel Stop

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1026 1,000 Cubic

OPTION Cleanup Storm/Highwater Debris

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1027 400 Hours OPTION Dump Truck with Driver

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1028 500 Hours OPTION Backhoe with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1029 500 Hours OPTION Bulldozer with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1030 40 Hours OPTION Vibratory Plate Compactor with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1031 100 Hours OPTION Vibratory Roller with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1032 20 Hours OPTION Concrete/Asphalt Saw with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

1033 100 Each OPTION Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

1034 20 Each OPTION Emergency Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

1035 300 Hours OPTION Unscheduled Labor Hours

FFP

UNIT UNIT PRICE MAX AMOUNT

1036 50,000 Each OPTION Materials Cost

FFP

UNIT UNIT PRICE MAX AMOUNT

1037 40 Each OPTION Replace/Install 50amp electric pedestal

FFP

UNIT UNIT PRICE MAX AMOUNT

1038 20 Each OPTION Replace/Install 30amp electric pedestal

FFP

UNIT UNIT PRICE MAX AMOUNT

1039 1 Each OPTION Park Preseason Electrical Check

FFP

UNIT UNIT PRICE MAX AMOUNT

1040 5,000 Linear

OPTION Excavation for Electrical Lines

UNIT UNIT PRICE MAX AMOUNT

1041 1,000 Linear

OPTION Excavation for Utility Company Lines

UNIT UNIT PRICE MAX AMOUNT

1042 10 Each OPTION Replace/Install Electric Riser

FFP

UNIT UNIT PRICE MAX AMOUNT

1043 10 Each OPTION Replace/Install Electric Panelboard

FFP

UNIT UNIT PRICE MAX AMOUNT

1044 10 Each OPTION Replace/Install Electric Wireway

FFP

UNIT UNIT PRICE MAX AMOUNT

1045 10 Each OPTION Replace/Install Electric Safety Disconne

FFP

Electrical - Replace/Install Electric Safety Disconnect, Performed IAW the PWS, UNIT UNIT PRICE MAX AMOUNT

1046 10 Each OPTION Replace/Install Electric Meter Base

FFP

UNIT UNIT PRICE MAX AMOUNT

1047 500 Linear

OPTION Utility Road Crossing

UNIT UNIT PRICE MAX AMOUNT

1048 500 Linear

OPTION Rock Excavation for Utility Lines

UNIT UNIT PRICE MAX AMOUNT

1049 25 Each OPTION Sewer Lift Station Electrical Check

FFP

UNIT UNIT PRICE MAX AMOUNT

1050 100 Each OPTION Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

1051 30 Each OPTION Emergency Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

1052 300 Hours OPTION Unscheduled Labor Hours

FFP

UNIT UNIT PRICE MAX AMOUNT

1053 50,000 Each OPTION Materials Cost

FFP

UNIT UNIT PRICE MAX AMOUNT

1054 20 Each OPTION Repair Water Leak

FFP

UNIT UNIT PRICE MAX AMOUNT

1055 12 Each OPTION Unplug Sewer System

FFP

UNIT UNIT PRICE MAX AMOUNT

1056 12 Each OPTION Replace Sewer Pump

FFP

UNIT UNIT PRICE MAX AMOUNT

1057 1 Each OPTION Start Up Water System

FFP

UNIT UNIT PRICE MAX AMOUNT

1058 1 Each OPTION Shut Down Water System

FFP

UNIT UNIT PRICE MAX AMOUNT

1059 5,000 Linear

OPTION Replace/Install Underground Water Line 3

Plumbing - Replace/Install Underground Water Line 3/4 - 2", Performed IAW the

UNIT UNIT PRICE MAX AMOUNT

1060 1,000 Linear

OPTION Replace/Install Underground Water Line 2

Plumbing - Replace/Install Underground Water Line 2 - 4", Performed IAW the

UNIT UNIT PRICE MAX AMOUNT

1061 500 Linear

OPTION Replace/Install Underground sewer line 2

Plumbing - Replace/Install Underground sewer line 2 - 4", Performed IAW the

UNIT UNIT PRICE MAX AMOUNT

1062 500 Linear

UNIT UNIT PRICE MAX AMOUNT

1063 500 Linear

UNIT UNIT PRICE MAX AMOUNT

1064 40 Each OPTION Replace Freeze Reistant Water Hydrant

FFP

UNIT UNIT PRICE MAX AMOUNT

1065 10 Each OPTION Sewer System Inspection

FFP

UNIT UNIT PRICE MAX AMOUNT

1066 20 Each OPTION Inspect Reduce Pressure Zone Assembly

FFP

UNIT UNIT PRICE MAX AMOUNT

2001 50 Each OPTION Service Call

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2002 20 Each OPTION Emergency Service Call

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2003 250 Hours OPTION Unscheduled Labor Hours

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2004 5,000 Each OPTION Materials Cost

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2005 50 Each OPTION Replace/Install Lantern Hanger

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2006 50 Each OPTION Replace/Install Fire Ring Grill

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2007 10 Each OPTION Replace/Install Pedestal BBQ Grill

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2008 100 Each OPTION Replace/Install Single Post Sign

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2009 50 Each OPTION Replace/Installl Double Post Sign

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2010 300 Cubic

OPTION Place/Spread Topsoil

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2011 300 Cubic

OPTION Place/Spread Fill Material

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2012 300 Ton

OPTION Place/Spread Screenings

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2013 500 Ton

OPTION Place/Spread Aggregate Base Material

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2014 500 Ton

OPTION Place/Spread Sand

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2015 300 Ton

OPTION Place/Spread Quarry Run Stone

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2016 300 Ton

OPTION Place/Spread B-Stone

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2017 100 Each OPTION Remove Tree 4-12"

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2018 50 Each OPTION Remove Tree 12-30"

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2019 1,000 Linear

OPTION Replace/Install Bottom Layer Landscape

Park Maintenance - Replace/Install Bottom Layer Landscape Timbers, Performed

UNIT UNIT PRICE MAX AMOUNT

2020 3,000 Linear

OPTION Replace/Install Top Layer Landscape Timb

Park Maintenance - Replace/Install Top Layer Landscape Timbers, Performed

UNIT UNIT PRICE MAX AMOUNT

2021 2,500 Square

OPTION Place 4" Concrete Slab

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2022 2,000 Square

OPTION Place 6" Concrete Slab

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2023 2,000 Square

OPTION Place Launch Ramp Concrete

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2024 30 Each OPTION Replace/Install Aluminum Picnic Table

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2025 50 Each OPTION Replace/Install Concrete Wheel Stop

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2026 1,000 Cubic

OPTION Cleanup Storm/Highwater Debris

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2027 400 Hours OPTION Dump Truck with Driver

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2028 500 Hours OPTION Backhoe with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2029 500 Hours OPTION Bulldozer with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2030 40 Hours OPTION Vibratory Plate Compactor with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2031 100 Hours OPTION Vibratory Roller with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2032 20 Hours OPTION Concrete/Asphalt Saw with Operator

FFP

Park Maintenance - Performed IAW the PWS, contract requirements, and all

UNIT UNIT PRICE MAX AMOUNT

2033 100 Each OPTION Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

2034 20 Each OPTION Emergency Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

2035 300 Hours OPTION Unscheduled Labor Hours

FFP

UNIT UNIT PRICE MAX AMOUNT

2036 50,000 Each OPTION Materials Cost

FFP

UNIT UNIT PRICE MAX AMOUNT

2037 40 Each OPTION Replace/Install 50amp electric pedestal

FFP

UNIT UNIT PRICE MAX AMOUNT

2038 20 Each OPTION Replace/Install 30amp electric pedestal

FFP

UNIT UNIT PRICE MAX AMOUNT

2039 1 Each OPTION Park Preseason Electrical Check

FFP

UNIT UNIT PRICE MAX AMOUNT

2040 5,000 Linear

OPTION Excavation for Electrical Lines

UNIT UNIT PRICE MAX AMOUNT

2041 1,000 Linear

OPTION Excavation for Utility Company Lines

UNIT UNIT PRICE MAX AMOUNT

2042 10 Each OPTION Replace/Install Electric Riser

FFP

UNIT UNIT PRICE MAX AMOUNT

2043 10 Each OPTION Replace/Install Electric Panelboard

FFP

UNIT UNIT PRICE MAX AMOUNT

2044 10 Each OPTION Replace/Install Electric Wireway

FFP

UNIT UNIT PRICE MAX AMOUNT

2045 10 Each OPTION Replace/Install Electric Safety Disconne

FFP

Electrical - Replace/Install Electric Safety Disconnect, Performed IAW the PWS, UNIT UNIT PRICE MAX AMOUNT

2046 10 Each OPTION Replace/Install Electric Meter Base

FFP

UNIT UNIT PRICE MAX AMOUNT

2047 500 Linear

UNIT UNIT PRICE MAX AMOUNT

2048 500 Linear

UNIT UNIT PRICE MAX AMOUNT

2049 25 Each OPTION Sewer Lift Station Electrical Check

FFP

UNIT UNIT PRICE MAX AMOUNT

2050 100 Each OPTION Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

2051 30 Each OPTION Emergency Service Call

FFP

UNIT UNIT PRICE MAX AMOUNT

2052 300 Hours OPTION Unscheduled Labor Hours

FFP

UNIT UNIT PRICE MAX AMOUNT

2053 50,000 Each OPTION Materials Cost

FFP

UNIT UNIT PRICE MAX AMOUNT

2054 20 Each OPTION Repair Water Leak

FFP

UNIT UNIT PRICE MAX AMOUNT

2055 12 Each OPTION Unplug Sewer System

FFP

UNIT UNIT PRICE MAX AMOUNT

2056 12 Each OPTION Replace Sewer Pump

FFP

UNIT UNIT PRICE MAX AMOUNT

2057 1 Each OPTION Start Up Water System

FFP

UNIT UNIT PRICE MAX AMOUNT

2058 1 Each OPTION Shut Down Water System

FFP

UNIT UNIT PRICE MAX AMOUNT

2059 5,000 Linear

OPTION Replace/Install Underground Water Line 3

Plumbing - Replace/Install Underground Water Line 3/4 - 2", Performed IAW the

UNIT UNIT PRICE MAX AMOUNT

2060 1,000 Linear

OPTION Replace/Install Underground Water Line 2

Plumbing - Replace/Install Underground Water Line 2 - 4", Performed IAW the

UNIT UNIT PRICE MAX AMOUNT

2061 500 Linear

OPTION Replace/Install Underground sewer line 2

Plumbing - Replace/Install Underground sewer line 2 - 4", Performed IAW the

UNIT UNIT PRICE MAX AMOUNT

2062 500 Linear

UNIT UNIT PRICE MAX AMOUNT

2063 500 Linear

UNIT UNIT PRICE MAX AMOUNT

2064 40 Each OPTION Replace Freeze Reistant Water Hydrant

FFP

UNIT UNIT PRICE MAX AMOUNT

2065 10 Each OPTION Sewer System Inspection

FFP

UNIT UNIT PRICE MAX AMOUNT

2066 20 Each OPTION Inspect Reduce Pressure Zone Assembly

FFP

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government

0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 0025 Destination Government Destination Government 0026 Destination Government Destination Government 0027 Destination Government Destination Government 0028 Destination Government Destination Government 0029 Destination Government Destination Government 0030 Destination Government Destination Government 0031 Destination Government Destination Government 0032 Destination Government Destination Government 0033 Destination Government Destination Government 0034 Destination Government Destination Government 0035 Destination Government Destination Government 0036 Destination Government Destination Government 0037 Destination Government Destination Government 0038 Destination Government Destination Government 0039 Destination Government Destination Government 0040 Destination Government Destination Government 0041 Destination Government Destination Government 0042 Destination Government Destination Government 0043 Destination Government Destination Government 0044 Destination Government Destination Government 0045 Destination Government Destination Government 0046 Destination Government Destination Government 0047 Destination Government Destination Government 0048 Destination Government Destination Government 0049 Destination Government Destination Government 0050 Destination Government Destination Government 0051 Destination Government Destination Government 0052 Destination Government Destination Government 0053 Destination Government Destination Government 0054 Destination Government Destination Government 0055 Destination Government Destination Government 0056 Destination Government Destination Government 0057 Destination Government Destination Government 0058 Destination Government Destination Government 0059 Destination Government Destination Government 0060 Destination Government Destination Government 0061 Destination Government Destination Government 0062 Destination Government Destination Government 0063 Destination Government Destination Government

0064 Destination Government Destination Government 0065 Destination Government Destination Government 0066 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 1020 Destination Government Destination Government 1021 Destination Government Destination Government 1022 Destination Government Destination Government 1023 Destination Government Destination Government 1024 Destination Government Destination Government 1025 Destination Government Destination Government 1026 Destination Government Destination Government 1027 Destination Government Destination Government 1028 Destination Government Destination Government 1029 Destination Government Destination Government 1030 Destination Government Destination Government 1031 Destination Government Destination Government 1032 Destination Government Destination Government 1033 Destination Government Destination Government 1034 Destination Government Destination Government 1035 Destination Government Destination Government 1036 Destination Government Destination Government 1037 Destination Government Destination Government 1038 Destination Government Destination Government 1039 Destination Government Destination Government 1040 Destination Government Destination Government 1041 Destination Government Destination Government 1042 Destination Government Destination Government 1043 Destination Government Destination Government 1044 Destination Government Destination Government 1045 Destination Government Destination Government 1046 Destination Government Destination Government 1047 Destination Government Destination Government 1048 Destination Government Destination Government 1049 Destination Government Destination Government 1050 Destination Government Destination Government 1051 Destination Government Destination Government 1052 Destination Government Destination Government

1053 Destination Government Destination Government 1054 Destination Government Destination Government 1055 Destination Government Destination Government 1056 Destination Government Destination Government 1057 Destination Government Destination Government 1058 Destination Government Destination Government 1059 Destination Government Destination Government 1060 Destination Government Destination Government 1061 Destination Government Destination Government 1062 Destination Government Destination Government 1063 Destination Government Destination Government 1064 Destination Government Destination Government 1065 Destination Government Destination Government 1066 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 2020 Destination Government Destination Government 2021 Destination Government Destination Government 2022 Destination Government Destination Government 2023 Destination Government Destination Government 2024 Destination Government Destination Government 2025 Destination Government Destination Government 2026 Destination Government Destination Government 2027 Destination Government Destination Government 2028 Destination Government Destination Government 2029 Destination Government Destination Government 2030 Destination Government Destination Government 2031 Destination Government Destination Government 2032 Destination Government Destination Government 2033 Destination Government Destination Government 2034 Destination Government Destination Government 2035 Destination Government Destination Government 2036 Destination Government Destination Government 2037 Destination Government Destination Government 2038 Destination Government Destination Government 2039 Destination Government Destination Government 2040 Destination Government Destination Government 2041 Destination Government Destination Government

2042 Destination Government Destination Government 2043 Destination Government Destination Government 2044 Destination Government Destination Government 2045 Destination Government Destination Government 2046 Destination Government Destination Government 2047 Destination Government Destination Government 2048 Destination Government Destination Government 2049 Destination Government Destination Government 2050 Destination Government Destination Government 2051 Destination Government Destination Government 2052 Destination Government Destination Government 2053 Destination Government Destination Government 2054 Destination Government Destination Government 2055 Destination Government Destination Government 2056 Destination Government Destination Government 2057 Destination Government Destination Government 2058 Destination Government Destination Government 2059 Destination Government Destination Government 2060 Destination Government Destination Government 2061 Destination Government Destination Government 2062 Destination Government Destination Government 2063 Destination Government Destination Government 2064 Destination Government Destination Government 2065 Destination Government Destination Government 2066 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-FEB-2018 TO

31-JAN-2019

N/A GREERS FERRY PROJECT OFFICE

700 HEBER SPRINGS ROAD NORTH

HEBER SPRINGS AR 72543-1088

501.362.2416

967116

0002 POP 01-FEB-2018 TO

31-JAN-2019

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0016 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0017 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0019 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0020 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0021 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0022 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0023 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0024 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0025 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0026 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0027 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0028 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0029 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0030 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0031 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0032 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0033 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0034 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0035 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0036 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0037 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0038 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0039 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0040 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0041 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0042 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0043 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0044 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0045 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0046 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0047 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0048 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0049 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0050 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0051 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0052 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0053 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0054 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0055 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0056 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0057 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0058 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0059 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0060 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0061 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0062 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0063 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0064 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0065 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0066 POP 01-FEB-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 01-FEB-2019 TO

31-JAN-2020

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1012 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1015 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1016 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1017 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1018 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1019 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1020 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1021 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1022 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1023 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1024 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1025 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1026 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1027 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1028 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1029 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1030 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1031 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1032 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1033 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1034 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1035 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1036 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1037 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1038 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1039 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1040 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1041 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1042 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1043 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1044 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1045 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1046 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1047 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1048 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1049 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1050 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1051 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1052 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1053 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1054 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1055 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1056 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1057 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1058 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1059 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1060 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1061 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1062 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1063 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1064 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1065 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

1066 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-FEB-2020 TO

31-JAN-2021

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2007 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2008 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2009 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2010 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2011 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2012 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2013 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2014 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2015 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2016 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2017 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2018 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2019 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2020 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2021 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2022 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2023 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2024 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2025 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2026 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2027 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2028 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2029 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2030 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2031 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2032 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2033 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2034 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2035 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2036 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2037 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2038 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2039 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2040 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2041 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2042 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)

2043 POP 01-FEB-2020 TO

N/A (SAME AS PREVIOUS LOCATION)