JFHQ Question Sets 1-6.v.1 Aug 1.pdf

PDF 601 KB Posted

Attached to
Joint Force Readiness Headquarters
Solicitation number
W9127P-11-B-0001
Issued by

About this file

Consolidated File with Question and Answer Sets 1-6

View the file

Other files

File Type Posted
Optional Form 1419 - Abstract of Bids.pdf PDF
JFHQ Bid Sign-in.pdf PDF
VI-JFHQ-E-601.pdf PDF
VI_JFHQ_Bid_Questions Set 7.V.3 Aug 3.pdf PDF
VI_JFHQ_Bid_Questions Set 7.V.2 Aug 1.pdf PDF
JFHQ Question Sets 7.v.1 Aug 1.pdf PDF
SF 30 MOD 0002 to Solicitation.pdf PDF
SF 30 MOD 0002 to Solicitation.pdf PDF
SF 30 MOD 0001 to Solicitation.pdf PDF
vi-jfhq-c-102.zip ZIP file
vi-jfhq-c-102 —
vi-jfhq-c-101 —
vi-jfhq-c-101.zip ZIP file
VI_JFHQ_Bid_Questions Set 3.pdf PDF
vi-jfhq-c-101.zip ZIP file
VIARNG JFHQ - Jacobs ELECTRONIC DATA DISCLAIMER.pdf PDF
vi-jfhq-c-131.zip ZIP file
vi-jfhq-c-102.zip ZIP file
VI-JFHQ-C-101 —
VI-JFHQ-C-102 —
JFHQ Q A.r.2.pdf PDF
JFHQ Q A.r.1.docx DOCX document
Attendance Sheet.PDF PDF
Pre-Bid JFHQ.ppt PPT presentation
JFHQ 1442 - IFB Document-30June.pdf PDF
VIARNG JFHQ Specifications Volume 2_Bid-Final 100 _re-issue to Guard 060311.pdf PDF
JFHQ 1442 - IFB Document.PDF PDF
Telecom-Drawings.zip ZIP file
Arch-Drawings.zip ZIP file
Life-Safety-Drawings.zip ZIP file
Electrical-Drawings.zip ZIP file
Mech-Drawings.zip ZIP file
Structural-Drawings.zip ZIP file
General-Drawings.zip ZIP file
Fire-Drawings.zip ZIP file
Landscaping-Drawings.zip ZIP file
Plumbing-Drawings.zip ZIP file
Civil-Drawings.zip ZIP file
Bid Package JFHQ.pdf PDF
VIARNG JFHQ_Geotechnical Report_Bid Final 100 _050611.pdf PDF
VIARNG JFHQ Commissioning Plan_Bid-Final 100 _re-issue to Guard 060311.pdf PDF
JFHQ 1442 - IFB Document.PDF PDF
VIARNG JFHQ Specifications Volume 1_Bid-Final 100 _re-issue to Guard 060311.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127P-11-B-0001 Amendment #1 -- Joint Force Readiness Headquarters Questions and Answers Sets #1-6

VIARNG - JFHQ Bid Questions

FDWD3900

Question Reply Date

Q u e st io n s Se t #1

"In reading the solicitation and specifications for division 14, I note that there is a restricted field of identified manufacturers for the hydraulic elevator. Is this an intentional restriction (with defined basis) or was there an administrative oversight in failing to add to the specification that "or equal" would be acceptable?"

Response: Division 14 Specification is correct. For multiple reasons evaluated during the design phase, the number of acceptable elevator manufacturers was limited to the ones listed and will be the only ones to be accepted. In this particular case no manufacturers outside the list will be allowed.

7/5/2011 u e st io n s Se

#2

There is no Audio Visual or Command and Control specification listed. Are there to be AV systems provided for in this bid or is there is a plan to add them in the future?

Response: AV Equipment is not to be provided in this bid. The infrastructure (such as conduit, J-boxes, etc., required to support such AV equipment), as indicated in the contract drawings and specifications, is to be provided in this bid such that the AV Equipment can be installed in the future.

7/5/2011

I didn't read anything on this that a Bond is required. What will the estimated amounts?

Response: In the solicitation document there are requirements for a Bid Guarantee (20%) and Payment and Performance Bonds. ref: FAR clauses included in the solicitation 52.228-1 BID GUARANTEE Sep 96 and 52.228- 15 Performance and Payment Bonds -- Construction Oct 10 7/5/2011 u e st io n s Se

#3

1 On the sheet C-131, grading plan, there is no existing elevation data. Please provide the existing elevation for site work.

Response: This issue was identified by our design team. The level/layer for the existing contour lines was incorrectly turned off. The Contracting Officer uploaded sheets C-101 “OVERALL EXISTING CONDITIONS SITE PLAN” and C-102 “ENLARGED EXISTING CONDITIONS SITE PLAN” and are now showing the existing topography.

7/19/11

2 Detail C4/S-534 references bottom of slab at EL 9’-0” and B3/S-502 references bottom of slab EL 8’-0”. Which elevation is correct?

Response: El 8'-0" is the correct elevation. 7/20/11

3 Detail A2/A-313 and drawing A-112 shows drywall at the inside north wall of the elevator shaft. Please confirm if this is required and if so, at this location only.

Response: The north wall in the elevator shaft is also an exterior wall envelope boundary that is required to have insulation.

7/20/11

4 The floor plans reference a partition type 02A, yet there is no corresponding detail on drawing A-501. Please advise.

Response: There is no partition 02A. This should be partition 02. 7/20/11

5 Please confirm that the restroom ceilings on the 2nd floor are exposed to the structure above – Rooms A-252, A-251, A- 242, A-243, A-230 and A-231.

Response: These areas have gypsum ceilings. Reference finish schedule.

There is an error in the sheet with the gypsum pattern not showing up.

7/20/11

6 Drawing A-132 shows the entrance vestibule at the North entrance of General Admin. A-204 as exposed to the structure above while detail D5/A-503 shows a drywall ceiling.

Response: This area has a gypsum ceiling. Reference finish schedule. There is an error in the sheet with the gyp pattern not showing up.

7/20/11

7 Please confirm if plaster is required at the inside concrete walls of the stairwells and all concrete walls that are not shown as drywall.

Response: No plaster is required. Reference finish schedule. 7/20/11

8 Landscape plans specify that turf areas are to be seeded, but does not provide for a particular species. The specifications (Section 329200 Turf and Grasses) states that solid sod (Zoysia) is to be installed.

Please clarify turf species and that seed is to be required and not sod. Sod will be prohibitively expensive if required at all green areas.

Response: Seeding is acceptable to establish lawns. Based on soils report adjust soil ph so that it falls between 6.0 and 7.0. Seed with Argentine Bahia grass at a rate of 3 lbs./1000 sf., sewing half the amount in one direction and half in a perpendicular direction. Do not allow germinating seed to dry, watering daily if necessary; do not allow the top ½” of soil to dry.

7/20/11

9 Are Irrigation plans going to be issued in an Addendum?

Response: No. Irrigation is no longer within the scope of this project. 7/20/11

10 What are the species of the trees and shrubs for OLI No. 10?

Response:

Trees: 5 West Indies Mahogany (Swietena mahogany) Shrubs: 13 Dwarf Yellow Ixora (Ixora ssp)

7/20/11

11 Please confirm that the flagpole designated ‘RTI Flagpole’ on detail B5/L-101 is not by others and to be included in this contract.

Response: Flagpole is not by others and should be included with this project. Flagpole model is to be coordinated with owner; installation per manufacturer’s recommendation. Recommend minimum height of main pole (American Flag) to be 40’.

7/20/11

12 Please confirm that precast concrete wheel stops are to be provided at every parking space, both MV parking and POV parking.

Response: Precast Concrete wheel stops, as indicated in sheet C-511, are to be provided in the POV parking spaces only.

7/19/11

13 Drawing C-512 detail 6 references concrete pavement. Please confirm that there is no concrete pavement on this project.

Response: There is no concrete pavement required in this project. 7/19/11

14 Drawing C-122 calls for electrical generator by others, please confirm that the (2) concrete pads per drawing C-520 detail C1 are still to be included in this contract.

Response: The Electrical Emergency Generator is not part of the scope.

There are two (2) concrete pads indicated in detail C1 on sheet C-520. The pad that has dimensions of 30’-0” long by 10’-0” wide can be disregarded.

The concrete pad that is 14’-0” long by 7’-0” wide is part of the scope. This pad is for the Generator Switchboard GEN-1. Please refer to sheet ES-001.

The dimensions of all concrete pads shall be verified with the final vendor drawings for all electrical, mechanical and any pad mounted equipments , but the minimum dimensions are the ones specified in the details.

7/19/11

15 Drawing C-122 shows (1) concrete pad for the antenna in this contract. Drawing C- 520 detail C3 shows a pad for electrical equipment and C.U.–6 as well. Please confirm that these (2) additional pads are to be included and just were not shown on C-122.

Response: Not all concrete pads were identified in sheet C-122 for clarity purposes but the basic graphic shape was. The additional two (2) concrete pads, identified in sheet C-520, along with all other concrete pads, were indicated in sheet C-123 where the points were called for. Therefore, as indicated in sheet C-123, these two (2) concrete pads are to be included.

The dimensions of all concrete pads shall be verified with the final vendor drawings for all electrical, mechanical and any pad mounted equipments , but the minimum dimensions are the ones specified in the details.

7/19/11

16 Can you please provide a specification for the Xypex cistern waterproofing product called out for in note 3, drawing C-523.

Response: The CSI Specification 07160 Coating, may be found at:

Part 1 - GENERAL:

"http://www.xypex.com/specs/csi_c.php?t=general&pageID=48" Part 2 - PRODUCTS:

"http://www.xypex.com/specs/csi_c.php?t=products&pageID=49" Part 3 - EXECUTION:

"http://www.xypex.com/specs/csi_c.php?t=execution&pageID=50"

7/19/11

17 Can you please provide a specification for the exterior waterproofing membrane called out for in note 4, drawing C-523.

Response: Please use as a Basis of Design "Bituthene System 4000 for below grade applications, by W.R. Grace, following all the instructions and recommendations for surface preparation, installation and testing, among others, from the manufacturer.

CSI Specification 071300 Sheet Waterproofing, may be found at:

"http://www.na.graceconstruction.com/waterproofing/download/BIT- 012W_21.pdf". Contractor may submit a US made equivalent as indicated, but it will be evaluated base on the basis of design indicated herein.

7/19/11

18 Please advise if below grade waterproofing is required at the elevator shaft.

Response: Reference detail A1-313 note 15. 7/20/11

19 For the operable partition OLI-3 please confirm if the finish is to be vinyl fabric or woven fabric. Also reference is made to work surfaces on the panels, if required please provide size, quantity, location etc.

Will pocket doors be required?

Response: Please provide vinyl fabric finish. Pocket door will not be required.

7/20/11

20 There is no definition of what is considered a ductbank. There are various trenches which contain only one underground conduit. For the purpose of applying the various requirements of this section can you provide a further definition as to when conduit in a trench is considered a ductbank?

Response: Duct-banks are a group of two or more conduits, installed in an underground trench.

7/19/11

21 Can you confirm that single underground conduits such as site lighting conduit, which is underneath a parking lot or roadway needs to be concrete encased?

Response: Concrete encasement is only required where specified on plans.

Branch circuits such as site lighting do not require concrete encasement unless otherwise noted.

7/19/11

22 Can you clarify the requirements for counterpoise wire? E-502 A2 Note 4 references a 2/0 in what appears to be a direct burial ductback application but there is no indication of the wire in the pictorial section. E-502 A3 is a concrete encased ductbank application and there is no reference to the counterpoise.

Response: Note 4 refers to the required ground rod and wire required in each manhole and pull box. Refer to pre-cast pull box details for HH and MH on E-503. All ground wires should be 1/0 and not 2/0. Revise to a # 1/0 ground. Bond all metal pull box covers with a minimum of #4 AWG. Delete the portion of the ground wire in the pull box details shown as continuing to a counterpoise. There is no counterpoise in this project.

7/19/11

23 Are concrete warning planks required on trenches containing single ducts?

Response: Concrete encasement is only required where specified on plans.

Concrete warning planks are not to be used. Delete reference to Concrete Warning Planks in section 2.2-C.3 of specification 260543.

24 E-002 electrical single line diagram – there is a reference to a key note 3 for power metering but no such item is found in the drawings. Can you confirm whether we are metering the primary side or the secondary side?

Response: Delete Key Note 3. WAPA Utility is providing metering to the primary side on this site. Contractor is to provide electronic power metering at the main switchboard breaker as indicated on the plans and specifications.

u e st io n s Se

#4

1 On the sheet C-003, there is an Existing Chain Link Fence and Existing Gate at Left Lower corner on the west side of RTI building, but on the C-111 demolition plan and C-122 Site Layout Plan, this Chain Link Fence and Gate seems disappeared. Do we need to remove and dispose this Chain Link Fence and Gate?

Response: No. There is no requirement to demolish and dispose of this Chain Link Fence. All Chain Link Fencing as part of the RTI project is to remain.

7/29/11

2 On the revised drawings released on 7/21/11, there is NO existing elevation on north side of existing fence. From the geo-tech report, there is a small hill which top elevation could be 10' higher, and the road will right cross the hill. Please provide existing elevation for north side of existing fence where we need to remove the existing fence and install new chain link fence.

Response: Please see revised (7/28/2011) C-101 and C-102, uploaded to Fed Biz Opps by the Contracting Officer. Drawings now show the contour lines required.

7/29/11

3 Please provide a specification for the prefabricated anti-static raised floor per C4/A-402 at JOC Office.

Response: Basis of Design product shall be Nevamar Laminated Floor Tile Grade HDH, by Panolam or approved equal for material thickness, durability, surface to ground resistance, and coefficient of friction values Panolam Industries International, Inc. 20 Progress Drive Shelton, CT 06484 203 925 1556

7/27/11

4 Numerous references are made in the specifications that products must be manufactured within 500 miles of the project. I know this is for LEED credits, but based on the location of this project this requirement cannot be met for many products. Please provide clarification on how this is to be handled.

Response: LEED Credit MR5 pursues the goal of achieving 10 or 20 percent of construction cost to accomplish 1 or 2 LEED Credits. It is understood that the location of the project presents unique challenges to accomplishing these goals. Response to this question is to give direction to comply to the maximum extent practical (10% is required per the Sustainable Design Summary LEED Checklist in specification 018113). The Contractor shall also record the percentage of materials and resources that are procured within the stipulated radius for final evaluation of whether the additional LEED Credit (for 20%) can be achieved. It should be noted this project shall meet the requirements of a USGBC LEED silver rating. Some points fall within the Contractor's responsibility during the construction phase per the above referenced Sustainable Design Summary LEED Checklist in specification 018113 and the Contract specifications. Other credits are identified as attainable based on the design as developed on the Contract documents. The Contractor needs to ensure he achieves those credits necessary to meet the requirements of a USGBC LEED silver rating.

7/27/11

5 Elevation C on A401 shows accessory #24 which is not on the schedule. Please clarify.

Response: Item 24 should actually be item 23 on the Schedule: a 48 inch textured, slip resistant grab bar.

7/27/11

6 07410-6/2.1 – The basis of design is Centria SRS3 20 gauge 12 wide, 3 inch tall 20 gauge standing seam roof panel. There are three other manufacture’s listed. None of which make a panel similar to the SRS3. Is this a proprietary specification for Centria? The drawings show a different panel profile than the panel specified (see A502). In addition 20 gauge is not an industry standard panel thickness.

Response: Centria SRS3 is the Basis of Design or approved equal. Products from MBCI, AEP-Span or Merchant and Evans will be considered if all performance criteria are equal to the Basis of Design.

7 The highest loads that have to be met are 211 PSF for the tower roof. Based on the testing shown on the Centria website the basis the panel is only able to reach 150 PSF without extrapolation. Does the roofing product have to be tested to meet the wind uplift pressures for this project, or can we let our engineer extrapolate from current testing?

Response: The engineer may extrapolate the data. 7/28/11

8 Can the following metal roofing systems be substituted for the Centria system? MBCI’s Batten-Lok HS in 22 Gauge, 12” width, 2” seam height or Berridge Mfg. Corp Zee-Lok in 22 gauge 16” width.

Response: MBCI Batten-Lok HS 22 gauge, 12 inches wide will be considered an approved equal. Berridge Corp Zee-Lok will not be considered an approved equal.

7/27/11

9 The paint spec for the metal roof panel is also a Centria proprietary specification. However the paint finish warranty of 20 years can be provided for any standard Kynar. Is Kynar paint acceptable?

Response: Kynar PVDF coatings will be considered an approved equal. All performance criteria must be met, including Rainwater catchment and SRI requirements.

7/27/11

10 074113-10/2.11 – State soffit panel is to “match profile and material of metal roof panels.” Typically a metal roof panel is not used as a soffit. Can you please provide additional information? Also, please advise of the gauge of the metal soffit.

Response: Specifications direct that soffit panels are to match color, material and profile of roof panels – not necessarily be a roof panel installed as a soffit panel. Soffit panels and soffit panel installation must resist hurricane force wind pressures and prevent intrusion of horizontally driven rain.

11 The structural drawings as provided for bid were signed and sealed by a professional engineer registered in Florida and not in the project jurisdiction of the U.S. Virgin Islands.

Should not the bid documents have to comply with the registration requirement? On sheet S-001 Structural Steel note #4 requires that the fabricator provide erection drawings signed and sealed by an engineer licensed to practice in the Virgin Islands. We will provide connection details and stair drawings signed and sealed by a registered professional engineer without registration in the V.I. for review and approval by the Engineer of Record. In order for another engineer to correctly evaluate, sign, and seal erection and fabrication drawings he would have to have a complete set of the project design calculations to review. This would incur a large expense and a great deal of time.

Response: Fabrication documents may be signed and sealed by an engineer professionally licensed in a state other than the USVI.

7/28/11

12 Note 17 in the Structural Steel section of notes states that fabricator will “verify correctness of foundations and anchor rods prior to fabrication”. Should this not be a requirement for the erector?

Response: It is the General Contractor's responsibility to "verify correctness of foundations and anchor rods prior to fabrication" per the contract drawings and specifications.

7/28/11

13 Please confirm that the erector is required to be AISC Certified.

Response: The erector shall be AISC certified. 7/28/11

14 We are assuming that the grating shown on sheet S-111B in the floor of the Flammable Storage Building is fiberglass as item #4, Detail B3, Sheet A-111B. Is that correct?

Response: The grating is to be fiberglass. 7/28/11

15 On sheet A-311 handrails are called for as 1 ½” galvanized pipe (painted). Is the painting to be done in the field after installation?

Response: Handrails shall be shop painted to the largest extent practical. Touch up field paint will be expected to be performed as required, after installation, for a final finish prior to punch list walk through.

16 In preliminary contacts with Vulcraft engineers, they tell us that they will not fabricate triple pitched girders as called for in the hip roof areas. They also state that they cannot acomodate the connection of the single pitch hip girders to the triple slope girders in these hip areas as shown on the plans. Can the engineer of record contact Vulcraft design engineers and resolve this issue or come up with an alternate design for them?

Response: Jacobs contacted Vulcraft and spoke to one of the engineers who confirmed that Vulcraft is capable of designing and fabricating the girders at the hip roof as well as the connections for the joists to the girders as shown on the construction documents.

7/28/11

17 The joist trusses over the assembly area are 12’-1” deep at the peak and 44’ to 45’ long, assuming they can be field spliced at the centerline. This creates very expensive and difficult transportation problems for both inland and ocean carriers. Can one column be placed in the Assembly Hall with two more in the interior walls and this portion of the roof be redesigned similar to the remainder of the building?

Response: A column line (columns) may not be added. 7/28/11

18 In division 51200, para. 2.3.A, there is a requirement for a MPI#79 primer. This a solvent based, alkyd formulation that manufacturer’s recommend a SSPC SP6 commercial blast surface preparation for. It is not a standard fabricator supplied primer. This will require sending the steel out for painting by others after fabrication which adds considerable expense. In section 52100, para. 2.7.B, there is no specification at all for the primer used on the joists. Can the manufacturer’s standard red oxide primer be used on the structural steel?

Response: Yes. 7/28/11

19 Are any structural steel items to receive applied fireproofing? Response: No. 7/29/11

20 Section 51200, para. 2.7.C.2 requires 2 coats of shop paint to surfaces that are inaccessible. Please verify that this applies and clarify what constitutes inaccessible.

Response: This applies. Inaccessible areas are surfaces of the steel which are not accessible for priming or painting after erection or installation.

7/28/11

21 Testing of the fabricated steel, as called for in section 51200, para 2.9 is typically an Owner contracted and paid for item. Is that the case for this job?

Response: The Contractor is responsible for hiring the qualified testing agencies and paying for testing and inspection services per 014000.

7/28/11

22 The 20 ga. roof panels with 3” high ribs specified for this building are only fabricated by and available from Centria.

This results in a single source for the product as specified.

Other manufacturers produce panels that will meet these loads in 22 ga. steel with 2” high panel ribs. Can this specification be rewritten to include other suppliers?

Response: Acceptable products are Centria SBS3 as the Basis of Design, or approved equal. The specification allows for products from AEP-Span, MBCI and Merchant and Evan as potential approved equals if all performance criteria are met.

u e st io n s Se

#5

1 Please provide specifications for Raised Floor at Office number A-123.

Response: Basis of Design product shall be Nevamar Laminated Floor Tile Grade HDH, by Panolam or approved equal for material thickness, durability, surface to ground resistance, and coefficient of friction values Panolam Industries International, Inc. 20 Progress Drive Shelton, CT 06484 203 925 1556.

7/28/11

2 Please clarify if the Projection Screen, section 115213, is part of this project. If so please provide locations.

Response: Key Note Number 1 on Reflected Ceiling Plans is incorrect.

Projection Screens are to be included. Locations are shown on the Reflected Ceiling Plans A-131A and A-132.

7/28/11

3 Please clarify if the Visual Display Surfaces (Marker boards, Tack boards and its supports) section 101100, are part of this project. If so please provide locations.

Response: Provide 4'x8' Marker Boards and 4'x4' Tack Boards from approved manufacturers per Specification Section 101100 . Provide TWO(2) Marker Boards at each Classroom & Conference Room [including the TAG VTC Area] located on each side of Projection Screen location. And provide ONE(1) Tack Board at each Classroom and Conference room [including the TAG VTC Area].

7/28/11

4 Please indicate if the electrical contractor will provide and install Rough In Only (conduit and pullwire) for the following systems: Fire Alarm, Paging/Sound, Data/Telephone, Public Address, Wireless Access Points and Electronic Security:

Access Control & CCTV.

Response: The electrical contractor shall furnish and install all conduit and wiring as indicated on the plans and specifications. A fully functional fire alarm/mass notification system, PA, Data and Telephone system shall be provided by the contractor. Access Control & CCTV require conduit & pull wire where indicated in the plans and specs.

7/28/11 u e st io n s Se

#6

1 Section 0800 paragraph 26. Contractor Quality Control states “Contractor will have a dedicated, onsite quality control specialist for the entire period of performance. Will this person be allowed to have other duties such as serving as onsite safety specialist?

Response: As indicated in the specs, this person shall be dedicated to this task only.

8/1/11

2 Section 0800 paragraph 27. Safety Assurance states “Contractor will have a dedicated, onsite safety specialist for the entire period of performance. Will this person be allowed to have other duties such as serving as onsite quality control?

Response: As indicated in the specs, this person shall be dedicated to this task only.

8/1/11

3 Section 015000 speaks to temporary facilities and identifies specific requirements for field offices and furnishings. Will the contractor be required to provide the government with a temporary field office?

Response: Yes. The contractor is required to provide field office to the government representative(s).

8/1/11

4 Please provide a copy of the wage determination to be used for this project.

Response: Most current Davis Bacon for Virgin Islands at time of award.

http://www.wdol.gov/dba.aspx#0