This is an Abstract of Offers for a federal dredging solicitation issued by the Portland District, Corps of Engineers. Solicitation W9127N26BA003 for West Coast Hopper Maintenance Dredging 2026 was issued on January 30, 2026, with offers opened on March 2, 2026. The contracting officer is LASICH.BRANDON.MATTHEW@USACE.ARMY.MIL. Three offerors submitted bids: Manson Construction Co. (Seattle, WA) with a total offer of $45,365,750.00, Restored Cloud, Inc. (Ithaca, New York) with $39,789,750.00, and a third offeror with $54,775,000.00. Bid security of 20 percent of bid price is required from all offerors.

The solicitation includes nine mandatory contract line items (CLINs) totaling approximately $25.9 million to $31.9 million across the three bids, covering mobilization/demobilization, dredging operations measured in cubic yards (CY) at various locations (HUM, LCR, MCR sites), bin measuring, surveys, and transit miles for material placement. An additional 21 optional CLINs valued between $13.9 million and $22.9 million include incremental dredging, hydrographic surveys, shoreline placement operations, vegetation work, and avian dissuasion mounding. The work involves multiple dredging projects designated as HUM (Humboldt), LCR (Lower Columbia River), MCR (Middle Columbia River), COO (Coos), and ESI (Eel Slough), with placement at various ocean sites, jetty sites, and shallow water sites. All three offerors acknowledged addenda to the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to West Coast Hopper Maintenance Dredging 2026, newest first.
File Type Posted
Bid opening Attendance_26BA003.xlsx XLSX spreadsheet
WCHC26_AMD0004_Technical Section.pdf PDF
Solicitation Amendment W9127N26BA003-0004.pdf PDF
WCHC26_AMD0003_Technical Section.pdf PDF
Solicitation Amendment W9127N26BA0030003 SF 30.pdf PDF
East_Sand_Island_20251204_Land_NAVD88_USft.txt TXT text file
WCHC26_AMD0002_Technical Section.pdf PDF
W9127N26BA003 Amend0002 SF 30.pdf PDF
Solicitation Amendment W9127N26BA0030001 SF 30.pdf PDF
WCHC26_AMD0001_Technical Section.pdf PDF
WCHC26_ADVERTISE_PLANS.pdf PDF
WCHC26_ADVERTISE_SPECS.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1

1/30/2026 3/2/2026

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

X A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

(WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED

(INCLUDING PROFIT) YES YES

6. NUMBER OF ADDENDA ISSUED

7A.

ITEM D. E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED

NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

MANDATORY CLINS

0001 Mobilization and Demobilization 1 JOB 9,960,000.00$ 9,960,000.00$ 9,670,000.00$ 9,670,000.00$ 3,850,000.00$ 3,850,000.00$ -$ 0002 HUM, Bin Measure to Required Depth, HOODS Ocean Placement 600,000 CY 5.80$ 3,480,000.00$ 5.40$ 3,240,000.00$ 9.45$ 5,670,000.00$ -$ 0004 LCR, RM 7+00 to RM 17+20, Bin Measure, FlowLane (FL) and Transfer Site (TS) Placement 200,000 CY 3.00$ 600,000.00$ 2.70$ 540,000.00$ 5.94$ 1,188,000.00$ -$ 0005 LCR, RM 3+00 to RM 105+00, Pre/Post DredgeSurvey, FL and TS Placement 600,000 CY 3.10$ 1,860,000.00$ 3.00$ 1,800,000.00$ 6.21$ 3,726,000.00$ -$ 0008 LCR, RM 3+00 to RM 105+00, Bin Measure toRequired Depth, FL and TS placement 200,000 CY 3.00$ 600,000.00$ 2.80$ 560,000.00$ 5.94$ 1,188,000.00$ -$ 0010 LCR Increment Transit Miles for Material Placement Site (between zero and eight miles one-way) 5,000,000 CY*MI 0.36$ 1,800,000.00$ 0.25$ 1,250,000.00$ 0.21$ 1,050,000.00$ -$ 0011 LCR Increment Transit Miles for Material Placement Site (greater than eight miles one-way) 3,000,000 CY*MI 0.31$ 930,000.00$ 0.25$ 750,000.00$ 0.26$ 780,000.00$ -$ 0012 LCR Intra-Project Transit Miles 175 MI 730.00$ 127,750.00$ 450.00$ 78,750.00$ 13,800.00$ 2,415,000.00$ -$ 0015 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 1,600,000 CY 4.50$ 7,200,000.00$ 4.55$ 7,280,000.00$ 7.02$ 11,232,000.00$ -$ 0017 MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300,000 CY 2.80$ 840,000.00$ 2.50$ 750,000.00$ 2.70$ 810,000.00$ -$

SUBTOTAL FOR MANDATORY LINE ITEMS 27,397,750.00$ 25,918,750.00$ 31,909,000.00$ -$

OPTIONAL CLINS

0003 HUM, Bin Measure to Required Depth, HOODS Ocean Placement (OPTION) 300,000 CY 5.50$ 1,650,000.00$ 5.00$ 1,500,000.00$ 10.06$ 3,018,000.00$ -$ 0006 LCR, RM 3+00 to RM 105+00, Pre/Post DredgeSurvey, FL and TS Placement (OPTION) 250,000 CY 3.20$ 800,000.00$ 2.30$ 575,000.00$ 6.61$ 1,652,500.00$ -$ 0007 LCR, RM 3+00 to RM 105+00, Pre/Post DredgeSurvey, FL and TS Placement (OPTION) 250,000 CY 3.20$ 800,000.00$ 2.30$ 575,000.00$ 6.61$ 1,652,500.00$ -$ 0009 LCR, RM 7+00 to RM 17+20, Increment for Columbia River Deep Water Site (DWS) Placement (OPTION) 100,000 CY 3.90$ 390,000.00$ 0.10$ 10,000.00$ 2.59$ 259,000.00$ 0013 COO, Incremental Mobilization andDemobilization (OPTION) 1 Job 450,000.00$ 450,000.00$ 350,000.00$ 350,000.00$ 1,380,000.00$ 1,380,000.00$ -$ 0014 COO, Bin Measure to Required Depth, Site-F Ocean Placement (OPTION) 400,000 CY 4.70$ 1,880,000.00$ 3.50$ 1,400,000.00$ 10.64$ 4,256,000.00$ -$ 0016 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTION) 250,000 CY 4.50$ 1,125,000.00$ 4.40$ 1,100,000.00$ 7.48$ 1,870,000.00$ -$ 0018 MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTION) 300,000 CY 2.80$ 840,000.00$ 2.00$ 600,000.00$ 2.88$ 864,000.00$ -$ 0019 MCR, Bin Measure , Increment for Operations and Maintenance Deep Water Site (DWS) Placement (OPTION) 250,000 CY 2.80$ 700,000.00$ 2.00$ 500,000.00$ 2.88$ 720,000.00$ -$ 0020 MCR, Bin Measure , Increment for Operations and Maintenance South Jetty Site (SJS) Placement (OPTION) 250,000 CY 1.50$ 375,000.00$ 1.50$ 375,000.00$ 3.45$ 862,500.00$ -$ 0021 HUM, Third Party Hydrographic Surveys (OPTION) 2 Job 48,000.00$ 96,000.00$ 27,500.00$ 55,000.00$ 40,250.00$ 80,500.00$ 0022 LCR, Third Party Hydrographic Surveys (OPTION) 10 Job 31,000.00$ 310,000.00$ 32,000.00$ 320,000.00$ 32,200.00$ 322,000.00$ 0023 MCR, Third Party Hydrographic Surveys (OPTION) 2 Job 48,000.00$ 96,000.00$ 28,000.00$ 56,000.00$ 40,250.00$ 80,500.00$ 0024 COO, Third Party Hydrographic Surveys (OPTION) 1 Job 48,000.00$ 48,000.00$ 55,000.00$ 55,000.00$ 40,250.00$ 40,250.00$ 0025 Incremental Mobilization and Demobilization for Pump-ashore Operations (OPTION) 1 Job 3,980,000.00$ 3,980,000.00$ 3,500,000.00$ 3,500,000.00$ 1,725,000.00$ 1,725,000.00$ 0026 ESI, Pre/Post Survey, Increment for Shoreline Placement (OPTION) 120,000 CY 20.60$ 2,472,000.00$ 15.00$ 1,800,000.00$ 21.28$ 2,553,600.00$ 0027 ESI, Pre/Post Survey, Increment for Shoreline Placement (OPTION) 30,000 CY 33.20$ 996,000.00$ 15.00$ 450,000.00$ 21.28$ 638,400.00$ 0028 ESI, Topographic/UAS Survey Package (OPTION) 1 Job 265,000.00$ 265,000.00$ 200,000.00$ 200,000.00$ 201,250.00$ 201,250.00$ 0029 ESI, Vegetation (OPTION) 1 Job 475,000.00$ 475,000.00$ 350,000.00$ 350,000.00$ 287,500.00$ 287,500.00$ 0030 ESI, Avian Dissuasion Mounding (OPTION) 1 Job 220,000.00$ 220,000.00$ 100,000.00$ 100,000.00$ 402,500.00$ 402,500.00$

SUBTOTAL FOR OPTIONAL LINE ITEMS 17,968,000.00$ 13,871,000.00$ 22,866,000.00$ -$

45,365,750.00$ 39,789,750.00$ 54,775,000.00$ -$

NSN 7540-01-150-0981

West Coast Hopper Maintenance Dredging 2026

7B. DESCRIPTION OF OFFERED ITEM

TOTAL

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

Manson Construction Co.

5209 E Marginal Way S Seattle, WA 98134

B. BID SECURITY B. BID SECURITY

STANDARD FORM 1419 (10-3)

Restored Cloud, Inc.

102B Boldt Hall Ithaca, New York 14853

ABSTRACT OF OFFERS

W9127N26BA003

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

Offers 1-3

2026-03-02T17:13:29-0500
CARLTON.JULIA.BETH.1275687223
2026-03-02T15:20:18-0800
LASICH.BRANDON.MATTHEW.1255369012
2026-03-02T15:23:24-0800
LASICH.BRANDON.MATTHEW.1255369012

File details come from the government source that posted it. Updated .