WHITE CITY VA SORCC D-B RFP - VOLUME 3 - Table of Contents - 25 SEP 2025.pdf

PDF 568 KB Posted

Attached to
VA Southern Oregon Rehabilitation Center and Clinics Phase I
Solicitation number
W9127N25RA034
Issued by

About this file

This document is a Request for Proposal (RFP) Volume 3 - Appendices for new construction and seismic upgrades at the White City Veterans Affairs Southern Oregon Rehabilitation Center and Clinics. The project involves a design-build contract for Buildings B300 and B301, issued by the US Army Corps of Engineers for the Department of Veterans Affairs. The RFP is dated 25 September 2025, with contract number W912DY20D0054 and task order number W9127N24F0032.

The appendices include a comprehensive set of supporting documents such as a memorandum on zero greenhouse gas emissions, site plan and infrastructure information, physical security details, geotechnical report, fire flow test results, building classification, finish standards, technology responsibility matrix, owners project requirements, site photos, water report, NFPA 99 risk assessment, hazardous materials survey, and a memorandum on interstitial space and MRI. These appendices provide detailed technical, environmental, and operational information to support the design-build proposal for the VA facility upgrades.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Construction and Seismic Upgrades For White City Veterans Affairs

Southern Oregon Rehabilitation Center and Clinics Design-Build Request For Proposal for B300 and B301

REQUEST FOR PROPOSAL VOLUME 3 - APPENDICES

25 SEPTEMBER 2025

Contract No. W912DY20D0054 / Task Order No. W9127N24F0032

A/E Project No. 2024-004

DRAFT

TABLE OF CONTENTS i

VOLUME 3 - APPENDICES

TABLE OF CONTENTS

A. Memorandum Zero Greenhouse Gas Emissions

B. Supporting Site Plan and Infrastructure Information

C. Memorandum Physical Security B300 and B301

D. Memorandum PSRDM Technical Direction Clarification 1

E. ICT Workbook

G. Fire Flow Test

H. Geotechnical Report

I. Memorandum Building Classification

J. Finish Standards

K. Technology Responsibility Matrix

L. White City VA EA

M. Sole Source Items

P. Architectural Aesthetic

Q. Owners Project Requirements

R. Site Photos

S. Water Report

T. NFPA 99 Risk Assessment

U. Hazardous Materials Survey

W. Memorandum Interstitial Space and MRI

DRAFT

File details come from the government source that posted it. Updated .