CFR - Allied Crane Dredge Yaquina.pdf

PDF 86 KB Posted

Attached to
USACE; Portland District Dredge Yaquina Overhaul
Solicitation number
W9127N25BA012
Issued by

About this file

This is an Onsite Corrective and Functional Report (CFR) from Allied Marine Crane documenting a mechanical issue with equipment. The report identifies a problem with the boom luffing cylinder, which is leaking from the packing gland. The recommended resolution is to remove the cylinder and rebuild it using seal kit #37843. The document was completed by an inspector named Lloyd Hoots on 07/11/2025, and contains the company's contact information at 21433 SW Oregon Street in Sherwood, Oregon.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Onsite CFR report 001

Define issue as found or problem during operation:

Boom luffing cylinder is leaking out of the packing gland

Provide resolution, include any parts required:

Remove the boom luffing cylinder and have it rebuilt with seal kit #37843

Additional notes:

Inspector Signature ________Lloyd Hoots___________________ Date ____07/11/2025____