B.08 Price Schedule_25BA012_final.xlsx
XLSX spreadsheet 78 KB Posted
- Attached to
- USACE; Portland District Dredge Yaquina Overhaul
- Solicitation number
- W9127N25BA012
About this file
This document is a comprehensive Price Schedule for the U.S. Army Corps of Engineers (USACE) Portland District's Dredge Yaquina Overhaul contract (Solicitation Number W9127N25BA012). The pricing template is divided into three main categories: Category A and Category B work items covering extensive ship repair and maintenance tasks, and an Over & Above Work section. Category A includes 42 line items addressing transportation, drydocking, marine services, machinery maintenance, hull work, hopper inspections, bow thruster services, deck maintenance, and house/interior renovations. Category B features 19 additional work items focused on specialized repairs like hull coating, propulsion systems, and deck work.
The Over & Above Work section includes a Ship Repair Labor Rate allocation of 13,000 labor hours and $500,000 for materials and subcontractors, with provisions for potential contract extensions. The solicitation requires mandatory site visits for potential contractors, with the vessel currently operating along the Oregon Coast and scheduled for dock inspection in Portland on August 19. Contractors must provide their own Personal Protective Equipment (PPE) and may need a Transportation Worker Identification Certification (TWIC) card. The contract is a firm fixed-price job order under a Master Ship and Repair Agreement (MSRA) for comprehensive overhaul and maintenance of the Dredge Yaquina.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection / Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office | 5.1.5 | 1 | Job | $ - 0 | |
| Parking | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking (Lift Day) | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day Services | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | 1 | Job | $ - 0 | |
| Steam / Chilled Water | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemists Certifications | 5.2.6 | 1 | Job | $ - 0 | |
| Main Propulsion - Shafting & Rudder Clearances | 5.3.2 | 1 | Job | $ - 0 | |
| Main Propulsion - Shaft Covers | 5.3.3 | 1 | Job | $ - 0 | |
| Main Propulsion - Propeller Blade Replacement | 5.3.4 | 1 | Job | $ - 0 | |
| Machinery - Slops Tanks Annual Maintenance | 5.4.1 | 1 | Job | $ - 0 | |
| Machinery - Pump Room Bilge Cleaning | 5.4.2 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Bilge Cleaning | 5.4.3 | 1 | Job | $ - 0 | |
| Machinery - Emergency Generator Service | 5.4.4 | 1 | Job | $ - 0 | |
| Machinery - Dock and Sea Trials | 5.4.5 | 1 | Job | $ - 0 | |
| Machinery - CRPP Control Service Inspection | 5.4.6 | 1 | Job | $ - 0 | |
| Machinery - Box Cooler Bonnets | 5.4.8 | 1 | Job | $ - 0 | |
| Machinery - Paint Lower Pump Room | 5.4.9 | 1 | Job | $ - 0 | |
| Machinery - Thermographic Survey | 5.4.10 | 1 | Job | $ - 0 | |
| Machinery - Heating and Cooling Coil Flush | 5.4.11 | 1 | Job | $ - 0 | |
| Machinery – Test and Repair Generator Engine Keel Coolers | 5.4.12 | 1 | Job | $ - 0 | |
| Hull - Sliding Piece Fit-Up | 5.5.3 | 1 | Job | $ - 0 | |
| Hull - Sluice Valve Replacement | 5.5.4 | 1 | Job | $ - 0 | |
| Hull - Suction Inlet Hull Rings and Pipe Liners Replacement | 5.5.5 | 1 | Job | $ - 0 | |
| Hull – Pressure Wash Exterior Hull | 5.5.6 | 1 | Job | $ - 0 | |
| Hull - Sea Chest Screen Repair | 5.5.7 | 1 | Job | $ - 0 | |
| Hopper - Hopper Inspection Staging | 5.6.6 | 1 | Job | $ - 0 | |
| Hopper - Door Seal Modification | 5.6.7 | 1 | Job | $ - 0 | |
| Bow Thruster - Inspection Setup | 5.7.1 | 1 | Job | $ - 0 | |
| Bow Thruster - Trash Bars | 5.7.5 | 1 | Job | $ - 0 | |
| Deck - Annual Rescue Boat Davit Maintenance | 5.8.3 | 1 | Job | $ - 0 | |
| Deck - Chain Locker Cleaning | 5.8.4 | 1 | Job | $ - 0 | |
| Deck - Launch Davit Annual Maintenance | 5.8.6 | 1 | Job | $ - 0 | |
| Deck - Lift Raft Annual Service | 5.8.7 | 1 | Job | $ - 0 | |
| Deck - Navigation, Communication, and GMDSS Maintenance | 5.8.8 | 1 | Job | $ - 0 | |
| Deck - Auto Pilot Renew | 5.8.9 | 1 | Job | $ - 0 | |
| Deck – Renew Deck Grating Over Hopper Top | 5.8.10 | 1 | Job | $ - 0 | |
| Deck – Crane Repair | 5.8.11 | 1 | Job | $ - 0 | |
| House - Clean and Inspect Galley Exhaust Ducting | 5.9.1 | 1 | Job | $ - 0 | |
| House - Fire Suppression Services | 5.9.2 | 1 | Job | $ - 0 | |
| House - Regrout Galley | 5.9.3 | 1 | Job | $ - 0 | |
| House - Re-laminate Walls | 5.9.4 | 1 | Job | $ - 0 | |
| House - Remodel Captain's Office | 5.9.5 | 1 | Job | $ - 0 | |
| House - Renew Head Floorings | 5.9.6 | 1 | Job | $ - 0 | |
| House - Galley Stove Renew | 5.9.7 | 1 | Job | $ - 0 | |
| House - Stateroom Renewal | 5.9.8 | 1 | Job | $ - 0 | |
| House - HVAC Duct Cleaning | 5.9.9 | 1 | Job | $ - 0 | |
| House - Replace Stateroom Flooring | 5.9.10 | 1 | Job | $ - 0 | |
| House - Electromagnetic Paint | 5.9.11 | 1 | Job | $ - 0 | |
| House – HVAC Assessment | 5.9.12 | 1 | Job | $ - 0 | |
| Inspection - ABS Inspection Services | 5.10.1 | 1 | Job | $ - 0 | |
| Inspection - Audio Gauging Services | 5.10.2 | 1 | Job | $ - 0 | |
| Inspection – Inspect and Certify Pad Eyes | 5.10.3 | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Services | 5.1.2 | 1 | Job | $ - 0 | |
| Main Propulsion - Propeller Blade Repairs | 5.3.1 | 1 | Job | ||
| Machinery - MTU Engine Services | 5.4.7 | 1 | Job | ||
| Hull - Coating of Hull Below Waterline | 5.5.1 | 3000 | SqFt | $ - 0 | |
| Hull - Hull Anode Renewal | 5.5.2 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Bearing Support Channel Overhaul | 5.6.1 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Hinge Bushing Renewal | 5.6.2 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Operating Rod Replacement | 5.6.3 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Retaining Bar Repair | 5.6.4 | 1 | Job | $ - 0 | |
| Hopper - Hopper I Beam Inspection | 5.6.5 | 1 | Job | $ - 0 | |
| Bow Thruster - Inspection, Oil and Seal Change | 5.7.2 | 1 | Job | $ - 0 | |
| Bow Thruster - Pod Preservation | 5.7.3 | 1 | Job | $ - 0 | |
| Bow Thruster - Sleeve Replacement | 5.7.4 | 1 | Job | $ - 0 | |
| Deck - 20-inch Pipe Replacement | 5.8.1 | 1 | Job | $ - 0 | |
| Deck - Anchor and Anchor Chain Reconditioning | 5.8.2 | 1 | Job | $ - 0 | |
| Deck - Coating Weather Decks | 5.8.5 | 6000 | SqFt | $ - 0 | |
| Total Category B Work Items | $ - 0 |
Over & Above Work
| Over & Above Work | |||||
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 13,000 | $0.00 | ||
| Materials & Subcontractor | 6.1 | $ 500,000.00 | $ 500,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $500,000.00 |
File details come from the government source that posted it. Updated .