5.9.9 - Y-3878-11 HVAC Equipment.pdf
PDF 2 MB Posted
- Attached to
- Yaquina Shipyard Overhaul FY26
- Solicitation number
- W9127N25BA012
About this file
The documents are HVAC (Heating, Ventilation, and Air Conditioning) equipment and system diagrams for the Dredge Yaquina, a U.S. Army Corps of Engineers trailing suction hopper dredge. The technical drawings detail the HVAC equipment configuration across multiple decks, including the bridge deck, upper bridge deck, forecastle deck, and upper deck, with comprehensive equipment lists specifying units, capacities, and technical specifications for steam duct heaters, dual duct boxes, fans, unit heaters, hot water converters, cooling coils, and electrical and convection heater lists. The diagrams provide intricate routing and placement of HVAC components throughout the vessel's different levels, indicating a complex and detailed design for environmental control systems on this maritime vessel.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Y-3878-11 SHEET 1 OF 5
| Y-3878-11 SHEET 2 OF 5 |
| Y-3878-11 SHEET 3 OF 5 |
| Y-3878-11 SHEET 4 OF 5 |
| Y-3878-11 SHEET 5 OF 5 |
File details come from the government source that posted it. Updated .