5.8.1 - 353-E507-2012-01 Rev-A Dredge Pipe Arrangement.pdf
PDF 167 KB Posted
- Attached to
- Yaquina Shipyard Overhaul FY26
- Solicitation number
- W9127N25BA012
About this file
The shared file is a technical drawing (Dredge Pipe Arrangement) for the U.S. Army Corps of Engineers' Yaquina Dredge vessel overhaul project. The detailed schematic shows pipe configurations, plan and elevation views with specific annotations for pipe supports, modifications, and arrangement details for the maritime design center. The drawing is part of the contract documentation for the W9127N25BA012 solicitation, which involves a comprehensive shipyard overhaul for the USACE Yaquina dredge vessel.
The technical drawing (Revision A, document number 353-E507-2012-01) specifically illustrates pipe arrangement modifications, including instructions to "modify existing pipe supports", "provide new elbow support", and indicates various pipe connections and positioning. The drawing includes multiple plan views (5-A and 11-C) and an elevation view (11-A), with detailed notes about pipe specifications, support modifications, and technical requirements for the vessel's pipe infrastructure. The document is part of the preparation for a significant maritime engineering project scheduled for August 2025 through February 2026, with a 60-day drydock period anticipated in December 2025.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
353-E507-2012-01-01 REV-A DREDGE PIPE ARRANGMENT Model (1) 353-E507-2012-01-01 REV-A DREDGE PIPE ARRANGMENT Model (1) sheet 2
File details come from the government source that posted it. Updated .