5.4.1 Slops Tanks Annual Maintenance - Y-1032-16 General Arrangement.pdf

PDF 953 KB Posted

Attached to
Yaquina Shipyard Overhaul FY26
Solicitation number
W9127N25BA012
Issued by

About this file

The document is a detailed general arrangement technical drawing for the Dredge Yaquina, a trailing arm suction hopper dredge. The six-page technical drawing provides comprehensive schematics across multiple decks, including inboard profile, outboard profile, front view, hold, upper deck, boat deck, forecasting deck, bridge deck, house top, and upper bridge deck. The drawings meticulously document the vessel's internal and external structural layout, equipment placement, room configurations, and technical specifications, with detailed annotations and an extensive abbreviations key. The technical drawings appear to support the U.S. Army Corps of Engineers' planned overhaul and maintenance of the vessel, which is scheduled for August 2025 through February 2026, with a 60-day drydock period anticipated in December 2025 through February 2026.

View the file

Other files

File Type Posted
5.9.6 - Y-1032-16 General Arrangement.pdf PDF
5.8.1 - 353-E507-2012-01 Rev-A Dredge Pipe Arrangement.pdf PDF
5.6.6 - Y-2494-3 Hopper Framing.pdf PDF
5.7.1 - Y-2232-18 Arrgt Details of Bow Thruster Instl.pdf PDF
5.8.1 - MDC 353-E507-2012-05 REV A DP FLANGES GASKETS.pdf PDF
5.3.4 - Hundested 0-002-020933-2 MP700 Propeller Hoved Samling.pdf PDF
5.3.2 Y-1032-16 General Arrangement.pdf PDF
5.7.4 - LIPS-A004654.pdf PDF
5.9.2 - Example Report Drager PSS5000 BRCE-1638 11 2023-Feb-16.PDF PDF
5.6.3 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.6.6 - Y-1034-1 Top of Hopper.pdf PDF
5.4.1 Slops Tanks Annual Maintenance - Y-2232-42 Misc. Tanks.pdf PDF
5.4.3 - Y-1032-16 General Arrangement.pdf PDF
5.9.2 - Mainenance Manual Drager Servicing.pdf PDF
5.4.3 - Y-2232-9 Tank Top Plating.pdf PDF
5.6.3 - Y-2496-3 Hyd Cylinders Ovfl Trough & Hopper Doors.pdf PDF
5.3.2 Y-2274-1 Rudders.pdf PDF
5.9.9 - Y-3878-11 HVAC Equipment.pdf PDF
5.5.2 Y-1052-1 Zinc Anodes.pdf PDF
5.5.6 - Y-1032-16 General Arrangement.pdf PDF
5.6.1 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.4.2 - Y-2232-9 Tank Top Plating1.pdf PDF
5.8.3 - Ned-deck Marine O M Davit SCH rev E 14-12-2010.pdf PDF
5.5.2 MDC 353-A640-01, Revision B, Sheets 1 to 3, Engine Cooling System.pdf PDF
5.6.2 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.8.6 - VD-TM-91721User Op.Manual.pdf PDF
5.3.2 Y-2636-2 Shafting Arrangement.pdf PDF
5.5.4 353-E507-01REV-A DREDGE PIPE ARRANGMENT.pdf PDF
5.9.2 - Red Hawk FA-000 Fire Alarm System, General Notes.pdf PDF
5.8.4 - Y-2272-1 Chain Locker.pdf PDF
5.6.5 - Y-2494-1 Transv BHD 32 & 53 in Way of Hopper.pdf PDF
5.9.1 Y-3878-18 HVAC Upper Deck.pdf PDF
5.6.1 - Y-2494-3 Hopper Framing.pdf PDF
5.8.7 - Y-1032-16 General Arrangement.pdf PDF
5.9.2 - D-1441-2.PDF PDF
5.5.6 - Y-2232-44 Seachests.pdf PDF
5.5.5 - DTC 5241115 Trunnion.pdf PDF
5.6.8 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.4.11 - Y-3878-11 HVAC Equipment.pdf PDF
5.5.2 - Hundested 0-002-020932-2 MP700 Propeller Hoved Samling.pdf PDF
5.6.7 - Y-2494-3 Hopper Framing.pdf PDF
5.3.1 - Hundested 1-022-020409-9 MP700-CPG120 Installation Unit 6330-G1177.pdf PDF
5.3.2 Y-2636-1 Shaft Struts.pdf PDF
5.6.7 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.9.2 - D-1441-1.PDF PDF
5.6.4 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.9.2 - Red Hawk FA-101 Fire Alarm System, FAS Layout.pdf PDF
5.5.4 - RR Gate Valve 50412077-001 (psa110432).pdf PDF
5.8.4 - Y-1034-2 List of Doors, Hatches, Scuttles - Copy.pdf PDF
5.3.2 Y-2274-2 Arrangement and Details of Rudder Stock.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Y-1032-16-1.pdf

Y-1032-16-2.pdf
Y-1032-16-3.pdf
Y-1032-16-4.pdf
Y-1032-16-5.pdf
Y-1032-16-6.pdf

File details come from the government source that posted it. Updated .