W9127N25BA010-0002.pdf

PDF 197 KB Posted

Attached to
W9127N25BA010 Rogue River South Jetty Partial Repair 2025
Solicitation number
W9127N25BA010
Issued by

About this file

This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for a construction project issued by the US Army Corps of Engineers (USACE) Portland District. Amendment 0002 updates the solicitation by revising the Wage Rate Requirement from OR20250065 dated 22AUG25 to OR20250065 dated 29AUG25, correcting the offer submission time to 02:00 on 11SEP25, and updating project plans based on bidder inquiries. The amendment also includes revised attachment sheets G-004 and LS 101, dated 2025.09.04. The solicitation number is W9127N25BA010, with the amendment effective date of 04-SEP-2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CON1RACTID CODE

I

PAGE OF PAGES

1 I 2 3. EFFECTIVE DATE 4. REQUISillON/PURCHASE REQ. NO. 15. PROJECTNO.(Ifapplicable)

04-SEP-2025

2. AMENDMENT/MODIFICATION NO.

6.ISSUEDBY CODE VV9127N 7. ADMINISTERED BY (Ifother than item6) CODE I

USACE, PORTLAND DISTRICT

See Item 6 333SW1ST AVE

PORTLAND OR 97204

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Cmmty, State and Zip Code) X

X

9A. AMENDMENT OF SOLICITATION NO.

VV9127N25BA010

9B. DATED (SEE ITEM 11)

l0A. MOD. OF CONTRACT/ORDER NO.

l0B. DATED (SEE ITEM 13)

CODE IFACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

�The above nuni>ered solicitation is ammded as set li,rth in Item 14. The hour and date specified fur receipt ofO:lli,r □

� is extended, 0 is not extended.

O:lli,r nnst acknowledge receipt of this ammdmmt prior to the hour and date specified in the solicitation or as ammded by one ofthe i>llowing mothods: (a) By col1J)leting Item, 8 and 15, and returning copies of the ammdmmt; (b) By acknowledging receipt of this ammdmmt on each copy of the o:lli,r submtted; or(c)By separate letter or telegramwhich includes areli:rence to the solicitation and ammdmmt nuni>ers. FAILURE OF YOUR ACKNOWLEDGMENTTO BE RECEIVED AT 1HE PLACE DESIGN A TED FOR 1HE RECEIPT OF OFFERS PRIOR TO 1HE HOUR AND DA TE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER Ifby virtue of this ammdmmt you desire to change an o:lli,r already submtted, such change may be 1111de by telegram or letter, provided each telegram or letter !lllkes rei:rence to the solicitation and this ammdmmt, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS"ORDERS.

IT MODIFIES THE CONTRACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (�ecify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM l0A.

B. THE ABOVE NUMBERED CONTRACT /ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER(�ecify type ofmodification and authority)

E. IMPORT ANT: Contractor D is not, □ is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT /MODIFICATION (Organized by UCF section headings, including solicitation/contract sul:!ject matter \\here feasible.)

The purpose of this arrendrrent is to:

1.Update the plans as a result of bidder inquiries

2. Provide the latest Wage Rates, OR20250065 ver 7 Dated 29AUG25

3. To correct an error on the offer submission time to 02:00 11SEP25

See Continuation Page

Except as provided herein, all temE and conditions of the docum,nt rei:renced in Item9A or I 0A, as heretofure changed, rermins unchanged and in full furce and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

TEl

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

30-105-04

EMAIL

16C. DATE SIGNED

04-SEP-2025

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR(48 CFR) 53.243

07-Aug-2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

W9127N25BA010

Page 2 of2

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been modified:

A4: Wage Rate Requirement (Construction) is updated from OR20250065 Dated 22AUG25 to

OR20250065 Dated 29AUG25

Attachments

Sheets G-004 and LS 101 have been revised and are dated 2025.09.04

(End of Summary of Changes)

File details come from the government source that posted it. Updated .