2025.09.04 - G--004.pdf
PDF 417 KB Posted
- Solicitation number
- W9127N25BA010
About this file
This document is a U.S. Army Corps of Engineers staging plan for the Rogue River South Jetty Expedited Repair project, located in Portland, Oregon. The plan details construction access, erosion control measures, and site logistics for a coastal infrastructure repair project. Key elements include a designated rock storage area, beach access route, tree protection zones, and specific environmental preservation requirements such as maintaining sand dunes between stations 6+50 and 8+50, stockpiling wood debris above high tide elevation, and installing silt fences and construction fencing. The project is governed by environmental permit constraints, with the contractor responsible for submitting a detailed Erosion Control Plan and adhering to specified temporary environmental control specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N: 298851 E: 3860943
N: 298927 E: 3861030
N: 299188 E: 3860992
SF
SF
SF
SF
SF
SF
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
+00
+00
+00
+00
+77
.57
N: 299396 E: 3860922
N: 299487 E: 3861049
SF
N: 299355 E: 3860873
N: 299255 E: 3861083
N: 298999 E: 3860986
N: 299088 E: 3860980
N: 299166 E: 3860696
N: 298759 E: 3860964
N: 299246 E: 3860698
N: 299114 E: 3860702
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
4- Se p-g2 ec di m s
PL
O
T D
AT
E
PL
O
TT
ER
PO
R
TL
AN
D D
IS
TR
IC
T
PO
R
TL
AN
D , O
R
EG
O N
AN
SI
E
XP
AN
D
D (2
2.
X
4.
IN
C
H
ES
W
N
BA
R O
G U
E R
IV
ER
SO
U
TH
J
ET
TY
EX
PE
D
IT
ED
R
EP
AI
R
BC
O
ES
B
AC
KC
H
EC
K
A.
G
R
AN
AD
O
S, P
.E
I.
SI
N
KU
S, E
.I.
T.
H . M
O R
IT
Z, P .E
A.
J
O N
ES
, P
.G
ST
AG
IN
G
P
LA
N
G-004
1" = 100'
STAGING PLAN
CONSTRUCTION ACCESS VIA OCEANSIDE DR
N
100' 200'0
PACIFIC OCEAN
ROGUE RIVER
EROSION CONTROL NOTES:
1. EROSION CONTROL MEASURES IDENTIFIED ON PLANS REPRESENT A POSSIBLE COURSE OF
ACTION. THE CONTRACTOR IS RESPONSIBLE FOR ADHERENCE TO ENVIRONMENTAL PERMITS
AND MUST SUBMIT AN EROSION CONTROL PLAN (ESCP) PER SPECIFICATION 01 57 19.00 25
TEMPORARY ENVIRONMENTAL CONTROLS.
2. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION
ACTIVITIES, INCLUDING MOBILIZATION.
3. SILT FENCE NOT TO BE INSTALLED BELOW MHHW (6.87' NAVD88).
4. ALL WOOD DEBRIS FOR OPTIONAL BEACH ACCESS ROUTE MUST BE STOCKPILED IN AN AREA
APPROVED BY COR. STOCKPILE MUST BE ABOVE HIGH TIDE ELEVATION, AND MUST BE
RESTORED TO PRECONSTRUCTION LOCATION ONCE REPAIRS REQUIRING BEACH ACCESS ARE
COMPLETE.
5. SAND DUNE BETWEEN STA. 6+50 TO 8+50 TO REMAIN UNDISTURBED. EXCAVATION WEST OF
STA. 8+50 IS AUTHORIZED IF NEEDED FOR STONE PLACEMENT. ANY SAND REMOVED MUST BE
RESTORED ONCE PLACEMENT AND INSPECTION IS COMPLETE. ANY DRIFTWOOD DISTURBED
DURING CONSTRUCTION MUST BE RETURNED TO ORIGIN
LEGEND:
ROCK STORAGE AREA
TREE PROTECTION AREA
PROTECT SHORE PINES AND
INSTALL CONSTRUCTION FENCE
AROUND DRIP LINE. SEE SHEET
C-501 FOR DETAIL.
ACCESS ROAD
INSTALL SILT FENCE.
SEE DETAIL C-501.
ROCK STORAGE
PARKING
PARKING
CONSTRUCT JETTY ACCESS RAMP APPROXIMATELY 30-40'
WIDE ON SOUTH SIDE OF JETTY ADJACENT TO SOUTH JETTY
STAGING AREA AND ABOVE MEAN HIGHER HIGH WATER
(MHHW). DO NOT REMOVE EXISTING ARMOR STONE TO
CONSTRUCT RAMP.
SAND DUNE TO REMAIN UNDISTURBED.
ANY DRIFTWOOD DISTURBED DURING CONSTRUCTION
MUST BE RETURNED TO ORIGIN. SEE NOTE 5.
INSTALL SILT FENCE.
SEE DETAIL C-501.
INSTALL CHAIN LINK FENCE
INSTALL FENCE GATE
TEMPORARY ACCESS ROAD.
BEACH ACCESS
BEACH ACCESS
R
ES
PO
N
SE
T O
IN
Q
U
IR
Y
ID
: 1
/0 4/
| Sheets and Views |
| G-004 |
File details come from the government source that posted it. Updated .