2025.09.04 - G--004.pdf

PDF 417 KB Posted

Attached to
W9127N25BA010 Rogue River South Jetty Partial Repair 2025
Solicitation number
W9127N25BA010
Issued by

About this file

This document is a U.S. Army Corps of Engineers staging plan for the Rogue River South Jetty Expedited Repair project, located in Portland, Oregon. The plan details construction access, erosion control measures, and site logistics for a coastal infrastructure repair project. Key elements include a designated rock storage area, beach access route, tree protection zones, and specific environmental preservation requirements such as maintaining sand dunes between stations 6+50 and 8+50, stockpiling wood debris above high tide elevation, and installing silt fences and construction fencing. The project is governed by environmental permit constraints, with the contractor responsible for submitting a detailed Erosion Control Plan and adhering to specified temporary environmental control specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N: 298851 E: 3860943

N: 298927 E: 3861030

N: 299188 E: 3860992

SF

SF

SF

SF

SF

SF

0+

1+

2+

3+

4+

5+

6+

7+

8+

9+

+00

+00

+00

+00

+77

.57

N: 299396 E: 3860922

N: 299487 E: 3861049

SF

N: 299355 E: 3860873

N: 299255 E: 3861083

N: 298999 E: 3860986

N: 299088 E: 3860980

N: 299166 E: 3860696

N: 298759 E: 3860964

N: 299246 E: 3860698

N: 299114 E: 3860702

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

4- Se p-g2 ec di m s

PL

O

T D

AT

E

PL

O

TT

ER

PO

R

TL

AN

D D

IS

TR

IC

T

PO

R

TL

AN

D , O

R

EG

O N

AN

SI

E

XP

AN

D

D (2

2.

X

4.

IN

C

H

ES

W

N

BA

R O

G U

E R

IV

ER

SO

U

TH

J

ET

TY

EX

PE

D

IT

ED

R

EP

AI

R

BC

O

ES

B

AC

KC

H

EC

K

A.

G

R

AN

AD

O

S, P

.E

I.

SI

N

KU

S, E

.I.

T.

H . M

O R

IT

Z, P .E

A.

J

O N

ES

, P

.G

ST

AG

IN

G

P

LA

N

G-004

1" = 100'

STAGING PLAN

CONSTRUCTION ACCESS VIA OCEANSIDE DR

N

100' 200'0

PACIFIC OCEAN

ROGUE RIVER

EROSION CONTROL NOTES:

1. EROSION CONTROL MEASURES IDENTIFIED ON PLANS REPRESENT A POSSIBLE COURSE OF

ACTION. THE CONTRACTOR IS RESPONSIBLE FOR ADHERENCE TO ENVIRONMENTAL PERMITS

AND MUST SUBMIT AN EROSION CONTROL PLAN (ESCP) PER SPECIFICATION 01 57 19.00 25

TEMPORARY ENVIRONMENTAL CONTROLS.

2. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION

ACTIVITIES, INCLUDING MOBILIZATION.

3. SILT FENCE NOT TO BE INSTALLED BELOW MHHW (6.87' NAVD88).

4. ALL WOOD DEBRIS FOR OPTIONAL BEACH ACCESS ROUTE MUST BE STOCKPILED IN AN AREA

APPROVED BY COR. STOCKPILE MUST BE ABOVE HIGH TIDE ELEVATION, AND MUST BE

RESTORED TO PRECONSTRUCTION LOCATION ONCE REPAIRS REQUIRING BEACH ACCESS ARE

COMPLETE.

5. SAND DUNE BETWEEN STA. 6+50 TO 8+50 TO REMAIN UNDISTURBED. EXCAVATION WEST OF

STA. 8+50 IS AUTHORIZED IF NEEDED FOR STONE PLACEMENT. ANY SAND REMOVED MUST BE

RESTORED ONCE PLACEMENT AND INSPECTION IS COMPLETE. ANY DRIFTWOOD DISTURBED

DURING CONSTRUCTION MUST BE RETURNED TO ORIGIN

LEGEND:

ROCK STORAGE AREA

TREE PROTECTION AREA

PROTECT SHORE PINES AND

INSTALL CONSTRUCTION FENCE

AROUND DRIP LINE. SEE SHEET

C-501 FOR DETAIL.

ACCESS ROAD

INSTALL SILT FENCE.

SEE DETAIL C-501.

ROCK STORAGE

PARKING

PARKING

CONSTRUCT JETTY ACCESS RAMP APPROXIMATELY 30-40'

WIDE ON SOUTH SIDE OF JETTY ADJACENT TO SOUTH JETTY

STAGING AREA AND ABOVE MEAN HIGHER HIGH WATER

(MHHW). DO NOT REMOVE EXISTING ARMOR STONE TO

CONSTRUCT RAMP.

SAND DUNE TO REMAIN UNDISTURBED.

ANY DRIFTWOOD DISTURBED DURING CONSTRUCTION

MUST BE RETURNED TO ORIGIN. SEE NOTE 5.

INSTALL SILT FENCE.

SEE DETAIL C-501.

INSTALL CHAIN LINK FENCE

INSTALL FENCE GATE

TEMPORARY ACCESS ROAD.

BEACH ACCESS

BEACH ACCESS

R

ES

PO

N

SE

T O

IN

Q

U

IR

Y

ID

: 1

/0 4/

Sheets and Views
G-004

File details come from the government source that posted it. Updated .