Smk Det Zones.doc
DOC document 3 KB Posted
- Attached to
- USACE: Portland District Dredge Vessel MSRA
- Solicitation number
- W9127N25BA008
About this file
The document is a Zone Description listing that details 19 specific zones on a vessel, including their locations across different decks such as main deck, hold deck, upper deck, and bridge deck. The zones include critical maritime spaces like Steering Gear Room, Auxiliary Machinery Rooms, Generator Rooms, Engine Rooms, Pump Rooms, Bow Thruster Room, Boatswain Stores, Paint Locker, Emergency Generator Room, Incinerator Room, and Machine Shop. These zones are likely part of the technical documentation for the USACE Dredge Essayons vessel overhaul project, which involves a comprehensive maintenance and repair job order to be performed between August 2025 and February 2026, with a 60-day drydock period anticipated in December 2025 through February 2026.
View the file
Other files
Show 40 more
Latest 50 of 128 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Zone | Description | Location | ||
| 1 | Steering gear Room | main deck | ||
| 2 | Aux Machinery Rm | hold deck | ||
| 3 | Aux machinery Rm | 15'-6" Level | ||
| 4 | Gen Rm | main deck | ||
| 5 | Gen Rm | hold deck | ||
| 6 | Gen Rm | 15'-6" Level | ||
| 7 | Engine Rm | main deck | ||
| 8 | Engine Rm | held deck | ||
| 9 | Engine Rm | 15'-6" Level | ||
| 10 | Pump Rm | Upper Deck | ||
| 11 | Pump Rm | main Declc | ||
| 12 | Pump Rm | Hold deck | ||
| 13 | Bow Thruster Rm | main deck | ||
| 14 | Bosn Stores (weld shop) | upper deck | ||
| 15 | paint Locker | upper deck | ||
| 16 | Aft store Rm (engine) | main deck | ||
| 17 | Em Gen Rm | bridge deck | ||
| 18 | Incinerator Rm | upper deck | ||
| 19 | Machine shop | main deck |
File details come from the government source that posted it. Updated .