This document is a Task Request (TR) for the Essayons Ships, numbered ESS-25-012, dated 05/05/24, with a Priority 1 status. The task involves renewing the supply ductwork for HVAC system in the Pump Room on the port side, at the 35-3" to Hold Deck level. Specific requirements include providing all labor/materials to renew supply ductwork for fan S12, replacing hangers, dampers, diffusers, screens, and insulation to restore the original configuration. The ductwork has corroded, separated, and failed, hanging by insulation/friction, which poses a safety risk of potential collapse that could injure shipboard personnel, contractors, and others. The technical documentation (681-0915-304, Sheets 1-9) is available electronically from the engineering department, and a detailed fan S12 overhaul request is referenced in a separate TR ESS-25-014.
View the file
Other files
Show 40 more
Latest 50 of 128 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-
CONTACT(S) OFFICE TR #
INITIATOR TR DATE
PRIORITY DATE REQUESTED
ROUTING INITIALS SUPERVISORS MASTERS
SYSTEM INFORMATION
SYSTEM
COMPARTMENT LEVEL
SIDE FRAME NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS YES NO PAGES TECH. MANUAL #
ENGINEERING
COORDINATOR DATE
PRIORITY 1 PRIORITY 2 PRIORITY 3
PROJECT ENGINEER DATE JOB ORDER
SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS
ESTIMATED COST COMPLETION DATE
υ ENGINEERING COMMENTS υ
PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL
TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL
g2odndmp Oval g2odndmp Typewritten Text
AREA OF FAILURE, BUT ALL
MATERIALS ARE IN THE SAME,
POOR CONDITION. REPLACE ALL
DUCTWORK HIGHLIGHTED.
Line
Oval
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
| ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf |
| ESS-15-083 - ICMS-Wonderware Corrections |
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
Wonderware Task Request support doc 2014
| TR 012 DWG 681-0915-304.pdf |
| 681-0915-304 Rev 5 (1 of 9) |
| 681-0915-304 Rev 5 (2 of 9) |
| 681-0915-304 Rev 5 (3 of 9) |
| 681-0915-304 Rev 5 (4 of 9) |
| 681-0915-304 Rev 5 (5 of 9) |
| 681-0915-304 Rev 5 (6 of 9) |
| 681-0915-304 Rev 5 (7 of 9) |
| 681-0915-304 Rev 5 (8 of 9) Fr1 |
| 681-0915-304 Rev 5 (8 of 9) Fr2 |
| 681-0915-304 Rev 5 (9 of 9) |
| Paquet/Rolle Chief Engineers: PAQUET | |
| Joe Bateman: | |
| SY 15/16: M&R 24-25 | |
| Point of Contact: PAQUET/YELACA | |
| tr#: ESS-25-012 | |
| MM/DD/YY: 5/5/2024 | |
| 1,2,3: 1 | |
| SYSTEM: HVAC | |
| COMPARTMENT: PUMP ROOM | |
| LEVEL: 35-3" to HOLD DECK | |
| SIDE: PORT | |
| FRAME: 46 | |
| NOTE: | |
| Task Description: PROVIDE ALL LABOR/MATERIALS TO RENEW SUPPLY DUCTWORK IAW FAN S12. RENEW ALL HANGERS, DAMPERS, DIFFUSERS, SCREENS, INSULATION, ETC. TO RESTORE TO ORIGINAL CONFIGUATION. INSPECT/REPLACE AS NECESSARY THE REMAINING DUCTWORK FOR THIS FAN AND FAN E11. ALL DUCTWORK IS OF THE SAME AGE/CONDITION. FAN S12 OVERHAUL REQUEST IS DETAILED ON TR ESS-25-014. | |
| Description of Problem: DUCT WORK HAS CORRODED/SEPARATED/FAILED AND IS HANGING BY INSULATION/FRICTION. REQUEST NEEDS TO BE COMPLETED THIS M&R. SEE PAGE 3 FOR PICTURE. SEE PAGE 2 FOR SNIPET OF DWG 681-0915-304, SHEET 8 of 9. | |
| Safety Issues: COMPLETE DUCTWORK COLLAPSE/INJURING SHIPBOARD PERSONNEL, CONTRACTORS, ETC. | |
| Y: Yes | |
| No: Off | |
| PAGES: | |
| TECH MANUAL: | |
| Comments: 681-0915-304, SHEETS 1-9 AVAILABLE FROM C/E ELECTRONICALLY. | |
| COORDINATOR: | |
| DATE: | |
| PRIORITY 1: Off | |
| PRIORITY 2: Off | |
| PRIORITY 3: Off | |
| PROJECT ENGINEER: | |
| DATE_2: | |
| JOB ORDER: | |
| ship's force: Off | |
| vendor: Off | |
| contractor: Off | |
| shipyard: Off | |
| moorings: Off | |
| ESTIMATED COST: | |
| COMPLETION DATE: | |
| engineering comments: | |
| accept: Off | |
| more info: Off | |
| defer: Off | |
| cancel: Off | |
| TR RECEIVED FROM VESSEL: | |
| TR RETURNED TO VESSEL: | |
| 2024-05-05T19:35:03-0700 | |
| PAQUET.DAVID.M.JR.1228506270 |