This document is a Request for Proposal (RFP) for the overhaul, maintenance, and repair of the Dredge YAQUINA by the U.S. Army Corps of Engineers (USACE), Portland District. The RFP outlines the vessel characteristics, potential major work items, and requirements for a site visit and proposal submission. Key details include:

The RFP is issued on a full and open competition basis, and the successful contractor must have or be capable of entering into a Master Ship Repair Agreement (MSRA) with the Portland District prior to award. The overhaul work must be performed at the contractor's facility, and the government will deliver the vessel to the contractor. Upon completion, the vessel must pass dock and sea trials before being accepted back by the government. The solicitation number is W9127N24B0012, with a bid due date of August 23, 2024. The NAICS code is 336611 and the PSC code is J999.

View the file

Other files

File Type Posted
C.04_FormalAbstractOfOffers7N24B0012_signed.pdf PDF
C.04_BidRoster7N24B0012.xlsx XLSX spreadsheet
B.08 W9127N24B0012 0005 Yaquina Overhaul FY25 Solicitation.pdf PDF
B.08 Price List_Rev4.xlsx XLSX spreadsheet
B.08 W9127N24B0012 Yaquina Overhaul FY25 Solicitation Projnet Questions and Responses.pdf PDF
Y-1034-1 Top of Hopper5.6.11.pdf PDF
B.08 W9127N24B0012 0004 Yaquina Overhaul FY25 Solicitation.pdf PDF
B.08 Price List_Rev3.xlsx XLSX spreadsheet
I-beam Shield.jpg JPG image
I Beam shield.png PNG image
December 2017 International Inspection Gaugings P6621 - Yaquina Report.pdf PDF
Launch Davit Maintenance.pdf PDF
B.08 W9127N24B0012 0003 Yaquina Overhaul FY25 Solicitation.pdf PDF
B.08 Price List_Rev2.xlsx XLSX spreadsheet
CuNi Pipe Drawing.pdf PDF
Yaquina Steering Documentation Jan. 2010.pdf PDF
3060_Pilotstar_D_AP02-S01_102-863_864.pdf PDF
B.08 W9127N24B0012 0002 Yaquina Overhaul FY25 Solicitation.pdf PDF
B.08 Price List_Rev1.xlsx XLSX spreadsheet
B.08 W9127N24B0012 0001 Yaquina Overhaul FY25 Solicitation.pdf PDF
5.5.7 Sluice Valves - 353-E507-01REV-A DREDGE PIPE ARRANGMENT.pdf PDF
5.5.9 - Y-1032-16 General Arrangement.pdf PDF
5.3.6 Main Propulsion Shafting and Rudder Clearance - Y-2274-1 Rudders.pdf PDF
5.6.9 - TJ 95340 Swell Compensator Cylinder.pdf PDF
5.5.14 - Y-2232-19 Upper Deck Plating & Beams.pdf PDF
5.3.4 - Y-2274-1 Rudders.pdf PDF
5.3.4 - Y-2274-2 Arrangement and Details of Rudder Stock.pdf PDF
5.4.5 - Y-3878-20 HVAC Bridge.pdf PDF
5.3.2 - Hundested 2-140-021135-1 MP700-CPG120 Flange Coupling Assembly.pdf PDF
5.6.4 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.6.3 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.3.3 - Hundested 0-002-020933-2 MP700 Propeller Hoved Samling.pdf PDF
5.4.5 - Y-3878-11 HVAC DIAGRAM & Equipment List.pdf PDF
5.5.4 Tanks - Y-2232-23 Rev D Misc Flats Plating and Beam.pdf PDF
5.5.15 - Y-2232-12 Shell Expansion.pdf PDF
5.4.2 - MDC 353-E645-2012-05 REV A Coffer Dam.pdf PDF
5.5.13 - Y-2232-12 Shell Expansion.pdf PDF
5.6.6 - Y-2494-3 Hopper Framing - Copy.pdf PDF
5.8.9 - GX5500S.pdf PDF
5.9.4 - Y-3878-19 HVAC Bridge Deck.pdf PDF
5.6.6 - Y-1034-1 Top of Hopper.pdf PDF
5.5.4 Tanks - Y-2232-9 Tank Top Plating.pdf PDF
5.8.9 - Furuno GP-170 AIS.pdf PDF
5.6.10 - Y-2494-3 Hopper Framing.pdf PDF
5.5.5 - Y-3872-4 Arrangement Firemain System.pdf PDF
5.6.8 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.3.3 - Hundested 1-022-021126-2 MP700-CPG120 Installation Unit 6331-G1178.pdf PDF
5.6.8 - Y-2496-3 Hyd Cylinders Ovfl Trough & Hopper Doors.pdf PDF
5.9.3 - D-1441-2.PDF PDF
5.5.18 - Y-2232-12 Shell Expansion.pdf PDF
Show 40 more

Latest 50 of 136 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SURVEY REPORT

FOR

LEGACY SILVERTON MC-PHARMACY

JOB # 8121-8003

342 FAIRVIEW ST

SILVERTON OR 97381

TAB CONTRACTOR: MACDONALD MILLER

THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL

ADJUSTMENTSTHAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE

NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING AND BALANCING OF ENVIRONMENTAL

SYSTEMS. THE MEASUREMENTS SHOW, AND THE INFORMATION GIVEN, IN THIS REPORT ARE

CERTIFIED TO BE ACCURATE AND COMPLETE, AT THE TIME AND DATE INFORMATION WAS GATHERED.

ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE

TEST-ADJUST- BALANCE REPORT PROJECT SUMMARY.

BALANCE REPORT

FOR

DREDGE YAQUINA

JOB #8323-8194

5555 NORTH CHANNEL AVE

PORTLAND, OR 97217

REPORT DATE: FEBRUARY 14, 2024

FIELD TECHNICIAN: KYLE BUSH

MACDONALD-MILLER FACILITY SOLUTIONS

12911 NE AIRPORT WAY

PORTLAND, OREGON 97230

PHONE: (971) 244-0901

NOAH WALKER

CERTIFICATION

Exp. 12/31/24

Air and Hydronic T es ti ng

M a c D o n al d-

Mi lle r Facility Solu t i o n s

Table Of Contents Project:

Location: DATE:

Project #: CONTACT: KYLE BUSH

1. CALIBRATION REPORTS -------------------------------------------------------------------------------- 3

2. ABBREVIATIONS ------------------------------------------------------------------------------------------- 5

3. SUMMARY ---------------------------------------------------------------------------------------------------- 6

4. SUPPLY FAN ------------------------------------------------------------------------------------------------- 7

5. ANEMOSTAT PNUEMATIC MIXING BOXES TEST DATA ------------------------------------- 13

6. EXHAUST FAN --------------------------------------------------------------------------------------------- 24

7. DRAWINGS -------------------------------------------------------------------------------------------------- 28

8. ANEMOSTAT MANUAL ---------------------------------------------------------------------------------- 32

HOFFMAN YARD - BUILDING B

8027 NE KILLINGSWORTH ST. PORTLAND, OR 97218

8122-9002

2/1/2024

Instrument Calibration Record Calibration

DateFunction Range Accuracy

∆ Pressure

Measurement

0.4 to 75

PSI

±2% or Read

0.5 PSI

0.01

PSI

Model # Alnor HM685 10/9/2023

Serial # 72203018

±0.5% of

Reading or

2.0⁰F

Z416035

Extech - 461995Model #

Serial #

Temperature Measurement

Resolution Model & Serial Numbers

Instrument

Rotational Measurement

9/7/2023

9/29/2023

10/3/2023

10/3/2023

6/21/2023

Fluke 52II

26090483WS

Fluke 80PK-25

2098706

Fluke 80PK-25

2098706

OMEGA 794

NA

Thermometer

Air

Probe

Immersion

Probe

Contact

Probe

0⁰F to

200⁰F

Tachometer 60-5000

RPM

±2% of Read

± 2 RPM

RPM

0.1⁰F

Model #

Serial #

Model #

Serial #

Model #

Serial #

Model #

Serial #

565500098

Serial #

Electrical Measurement

Volts

Amperes

1-600

VAC

0.1 -100

Amps

1 Volt

0.1 Ampers

Model #

Serial #

Velocity

(Hot Wire)

Digital Direct

Reading Hood

0 - 10.0 in W.G.

100 to 3500

FPM

50 to 6000

FPM

100 to 2000

CFM

Model #

9/29/2023

9/29/2023

±2% of

Reading or

±5 Digits

Air Pressure & Velocity

Pressure

Velocity

(Pitot Tube)

±2% of Read

±0.001" w.g.

±0.001 w.g.

≤1" w.g.

±5% of Read

±7 FPM

1.0 FPM

Serial #

Model #

Serial #

Fluke 378 FC

565500098

Fluke 378 FC

Serial #

5/31/2023

6/1/2023

10/9/2023

6/1/2023 2300205B

Humidity Measurement

Model #

Serial #

Evergreen S-PVF-1

2300173C

Shortridge 880C

M23116

TSI 9545-A

9545A2005002

Evergreen 3# Hood

±3% of Read

±3 FPM

1.0 FPM

±5% of Read

±7 CFM

1.0 CFM

Model #

Serial #

Model #

Model #

10/9/2023 Serial # 72203018

Date Updated 10/18/2023

TSI 9545-A

9545A2005002 10/9/2023

Hydronic Measurement Pressure

Measurement

0.4 to 200

PSI

±2% or Read

1 PSI

0.1

PSI

Model # Alnor HM685

Humidity 10 to 90%

RH

±3% RH 1.00%

ABBREVIATIONS

AC AIR CONDITIONING UNIT HP HORSEPOWER

BDD BACK DRAFT DAMPER HP HEAT PUMP AIR CONDITIONING UNIT

BHP BRAKE HORSEPOWER HWR HEATING WATER RETURN

B.S. BIRD SCREEN HWS HEATING WATER SUPPLY

CEG CEILING EXHUAST GRILLE INAC INACCESSIBLE

CRG CEILING RETURN GRILLE LAT (DB) LEAVING AIR TEMP. (DRY BULB)

CFM CUBIC FEET PER MINUTE LAT (WB) LEAVING AIR TEMP. (WET BULB)

CHWR CHILLED WATER RETURN LD LINEAR DIFFUSER

CHWS CHILLED WATER SUPPLY LWT LEAVING WATER TEMPERATURE

CSD CEILING SUPPLY DIFFUSER MAX MAXIMUM

CWR CONDENSER WATER RETURN MIN MINIMUM

CWS CONDENSER WATER SUPPLY O WIDE OPEN DAMPER / AIR PATH

DD DIRECT DRIVE OBD OPPOSED BLADE DAMPER

DP DIFFERENTIAL PRESSURE OD OUTSIDE DIAMETER

DIFF DIFFUSER OSA OUTSIDE AIR

DMPR DAMPER RA RETURN AIR

DNA DATA NOT AVAILABLE REQ’D REQUIRED

DNL DATA NOT LISTED RH RELATIVE HUMIDITY

DNT DATA NOT TAKEN RTU ROOFTOP UNIT

DWDI DOUBLE WIDTH DOUBLE INLET SA SUPPLY AIR

EAT (DB) ENTERING AIR TEMP. (DRY BULB) SP STATIC PRESSURE

EAT (WB) ENTERING AIR TEMP. (WET BULB) SWG SIDE WALL GRILLE

EC EGGCRATE RETURN SWR SIDE WALL REGISTER

EF EXHAUST FAN SWSI SINGLE WIDTH SINGLE INLET

EG EXHAUST GRILLE T OUTLET NEAREST THERMOSTAT

ESP EXTERNAL STATIC PRESSURE TSP TOTAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE T.P. THERMALLY PROTECTED

FPM FEET PER MINUTE T-STAT THERMOSTAT OR SENSOR

FH FUME HOOD TYP TYPICAL

GPM GALLONS PER MINUTE VOLTAGE PHASE / DUCT DIAMETER

HF HEPA FILTER V.D. VOLUME DAMPER

GENERAL DESCRIPTION OF EQUIPMENT/CONTROLS

EQUIPMENT CONSIST OF A SUPPLY FAN AND AN EXHAUST FAN LOCATED IN THE

FAN ROOM JUST BELOW THE PILOTHOUSE. THE SINGLE SUPPLY FAN DUCTWORK

IS SPLIT INTO A COLD DECK SERVED BY A CHILLED WATER COIL AND A HOT DECK

SERVED BY A HEATING WATER COIL. INDIVIDUAL ROOMS ARE SERVED MY

ANEMOSTAT MIXING BOXES, EACH WITH A PNUEMATIC THERMOSTAT THAT

CONTROLS THE DISCHARGE AIR TEMPERATURE WITH A SINGLE ACTUATOR

REGULATING THE PERCENTAGE OF HOT AND COLD AIR DELIVERED. MECHANICAL

SPRING REGULATORS CONTROL AIR VOLUME DELIVERED WITH AN ADJUSTABLE

TENSION SPRING.

GENERAL DESCRIPTION OF WORK

THE PURPOSE OF THIS WORK IS TO SET EQUIPMENT AIRFLOW RATES TO DESIGN

VOLUME AND TEST HEATING AND COOLING CAPACITIES.

DESCRIPTION OF PROCEDURES

TESTING WAS PRIMARILY CONDUCTED WITH A ROTATING VANE ANEMOMETER. A

DIFFERENTIAL DIGITAL MANOMETER ATTACHED TO A PITOT TUBE WAS USED FOR

DUCT TRAVERSES WHERE POSSIBLE. STATIC PRESSURES, AMPERAGES AND

VOLTAGES RECORDED AFTER FINAL BALANCE OF SUPPLY, OUTSIDE AIR AND

RETURN VOLUMES.

NOTES/DEFICIENCIES/CONCLUSIONS

- 10 SPRING REGULATORS WERE FOUND TO NOT FUNTION AS INTENDED. INLET

MANUAL VOLUME DAMPERS WERE USED TO BALANCE TO DESIGN FLOW AT MAX

HEAT AND MAX COOL. AIRFLOW VOLUMES WILL NOT BE REGULATED DURING

MIXING CONDITIONS OR WITH CHANGE IN DUCT PRESSURE CONDITIONS.

- 1 SPRING REGULATOR HAD BEEN REMOVED.

- MASTER SR AND MASTER OFFICE DO NOT ACHEIVE DESIGN HEATING FLOW

WHEN BOTH THERMOSTATS ARE SET TO MAX HEAT.

- DUCTWORK SIZING CAUSES AIR VELOCITIES IN EXCESS OF 3000 FPM.

- ROOM AIRFLOWS WERE MEASURED WITHOUT DIFFUSERS INSTALLED.

Project Summary

FIELD TECHNICIAN: KYLE BUSH

MACDONALD-MILLER FACILITY SOLUTIONS

12911 NE AIRPORT WAY

PORTLAND, OREGON 97230

PHONE: (971) 244-0901

Fan Unit

PROJECT:

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

Tested By: Kyle Bush Date: 2/14/2024

SYSTEM/UNIT: AC SYS 03-62-02

Log: AC SYS 03-62-02 2/14/2024 Kyle Bush No manual volume dampers on the return air ductwork outside of fan room.

AC SYS 03-62-02 2/14/2024 Kyle Bush Cooling system not operational at the time of testing.

Unit Data Fan Manufacturer Not Legible Fan Model Number Not Legible Fan Serial Number Not Legible

Test Data Design Actual

Total Airflow 8103 CFM 7675 CFM Motor Volts 471 Volts Motor Amps 20.00 Amps Brake Horse Power 16.21 BHP CFLA 24.35 Amps SP In -2.98 in. wc SP Out 5.70 in. wc Total SP 8.50 in. wc 8.68 in. wc

Motor Data Rated Airflow Capacity 8103 CFM Motor Manufacturer Relaince Motor Frame 236T Motor HP 20 HP Motor RPM 1765 RPM Motor Rated Volts 460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 25.00 Amps Motor Service Factor 1.15 Nominal Efficiency 87.5 %

Sheave Data Motor Fan

Manufacturer NAC

System/Unit Type of Reading

Inlet Type

Size AK Factor

Design Reading

Prelim Reading

Prelim

Final Reading

% Final OP

Inlet-01 RVA EG 668 820 123 860 129 Inlet-02 RVA EG 668 740 111 775 116 Inlet-03 RVA EG 668 715 107 755 113 Inlet-04 RVA EG 668 385 58 385 58 Inlet-05 RVA EG 667 375 56 370 55 Inlet-06 RVA EG 1000 910 91 1075 108 Inlet-07 RVA EG 962 785 82 885 92 Inlet-08 Pitot EG 414 365 88 425 103 Totals: - - - - 5715 5095 89 5530 97 -

AC SYS 03-62-02 Return Inlet Summary

MacDonald-Miller

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

Tested By: Kyle Bush Date: 2/14/2024

SYSTEM/UNIT: AC SYS 03-62-02/Cold Deck Total Airflow

Traverse Data Points

Unit Data Type of Traverse Rectangular Outer Height 10.0 in.

Outer Width 15.0 in.

Air Flow Area 1.042 sq. ft.

Number Of Rows 4 Readings Per Row 4 Total Readings 16 Location of Holes 1 Left

Final Data Sum of Readings 42507 Average Reading 2657 FPM Reading Std. Dev. 501 FPM Actual Total Flow 2769 CFM Duct Static Press. 5.70 in. wc

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

Tested By: Kyle Bush Date: 2/14/2024

SYSTEM/UNIT: AC SYS 03-62-02/Hot Deck Total Airflow

Traverse Data Points

Unit Data Type of Traverse Rectangular Outer Height 10.0 in.

Outer Width 20.0 in.

Air Flow Area 1.389 sq. ft.

Number Of Rows 4 Readings Per Row 4 Total Readings 16 Location of Holes 1 Bottom

Final Data Sum of Readings 56529 Average Reading 3533 FPM Reading Std. Dev. 360 FPM Actual Total Flow 4907 CFM Duct Static Press. 4.42 in. wc

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

Tested By: Kyle Bush Date: 2/14/2024

SYSTEM/UNIT: AC SYS 03-62-02/Pilot House Return Airflow

Traverse Data Points

Unit Data Type of Traverse Rectangular Outer Height 9.0 in.

Outer Width 23.0 in.

Air Flow Area 1.438 sq. ft.

Number Of Rows 4 Readings Per Row 4 Total Readings 16 Location of Holes 1 Left

Final Data Sum of Readings 35226 Average Reading 2202 FPM Reading Std. Dev. 249 FPM Design Total Flow 3339 CFM Actual Total Flow 3166 CFM Duct Static Press. -2.01 in. wc

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

Tested By: Kyle Bush Date: 2/14/2024

SYSTEM/UNIT: AC SYS 03-62-02/Below Fan Room Return Airflow

Traverse Data Points

Unit Data Type of Traverse Rectangular Outer Height 16.0 in.

Outer Width 10.0 in.

Air Flow Area 1.111 sq. ft.

Number Of Rows 3 Readings Per Row 4 Total Readings 12 Location of Holes 1 Bottom

Final Data Sum of Readings 26170 Average Reading 2181 FPM Reading Std. Dev. 229 FPM Design Total Flow 2376 CFM Actual Total Flow 2423 CFM Duct Static Press. -2.43 in. wc

Coil Test

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

System/Unit Airflow Design

Airflow Actual

Coil Type

Face Area

Water Flow

Design

Water Flow

Actual

Ent Water Temp Actual

Leav Water Temp Actual

Water Delta T Actual

Ent Air

DB

Temp Actual

Leav Air

DB

Temp Actual

Coil-01 4907 Heating 58.0 83.0 Totals: - - - - - - - - - - -

Project

Job Number

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

PILOTHOUSE

Cold Deck 1 Slot 48x4 1.06 354 375 439 465 321 340 91%

Cold Deck 2 Slot 48x4 1.06 354 375 288 305 358 380 101%

Cold Deck 3 Slot 48x4 1.06 354 375 288 305 387 410 109%

Cold Deck 4 Slot 48x4 1.06 354 375 316 335 377 400 107%

Cold Deck 5 Slot 48x4 1.06 354 375 410 435 368 390 104%

Cold Deck 6 Slot 48x4 1.06 354 375 524 555 387 410 109%

Cold Deck 7 Slot 48x4 1.06 354 375 472 500 373 395 105%

Cold Deck 8 Slot 48x4 1.06 354 375 491 520 358 380 101%

Totals 3105 103.42%

PILOTHOUSE

Hot Deck 1 Slot 48x4 1.06 354 375 241 255 321 340 91%

Hot Deck 2 Slot 48x4 1.06 354 375 264 280 358 380 101%

Hot Deck 3 Slot 48x4 1.06 354 375 330 350 387 410 109%

Hot Deck 4 Slot 48x4 1.06 354 375 292 310 382 405 108%

Hot Deck 5 Slot 48x4 1.06 354 375 292 310 373 395 105%

Hot Deck 6 Slot 48x4 1.06 354 375 288 305 387 410 109%

Hot Deck 7 Slot 48x4 1.06 354 375 335 355 377 400 107%

Hot Deck 8 Slot 48x4 1.06 354 375 325 345 363 385 103%

Totals 3125 104.17%

Remarks: Outdated drawing show 6 outlets on 3 mixing boxes. Mixing boxes have been removed during prior work.

Test Date:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #1) MASTER SR

Cold Deck 9 Diff 6x6 0.25 664 166 460 115 600 150 90%

Hot Deck 9 Diff 6x6 0.25 664 166 160 40 620 155 93%

Remarks: Ductwork serving Master SR and Master Office is undersized for total design flow.

Test Date:

Readings By: KB

2/8/2024

2/8/2024

Area Served Outlet Design Preliminary Final

Readings By: KB

Final Percent of Design

Percent of Design

Area Served Outlet Design

Air Outlet Test

Report

DREDGE YAQUINA

8323-8194 System A/C SYS 03-62-2

Preliminary

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

MASTER'S OFF

Cold Deck 10 CD 6x6 0.25 612 153 460 115 640 160 105%

Hot Deck 10 CD 6x6 0.25 612 153 340 85 580 145 95%

Remarks: Stateroom #2 has been combined with Master's Office and both mixing boxes share a thermostat.

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #2) ASS'T MASTER SR

Cold Deck 11 CD 6x6 0.25 580 145 420 105 620 155 107%

Hot Deck 11 CD 6x6 0.25 580 145 160 40 540 135 93%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #3) ASS'T CHIEF ENG

Cold Deck 12 CD 6x6 0.25 524 131 460 115 576 144 110%

Hot Deck 12 CD 6x6 0.25 524 131 300 75 540 135 103%

Remarks:

Test Date:

Readings By:

KB

Area Served Outlet Design Preliminary Final

Percent of Design

Area Served Outlet Design Preliminary Final

Percent of Design

Area Served Outlet Design Preliminary

Percent of Design

KB

2/8/2024

Final

2/6/2024

KB

2/8/2024

Air Outlet Test

Report

DREDGE YAQUINA

8323-8194 System A/C SYS 03-62-2

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #4) CH ENG'R

Cold Deck 13 CD 6x6 0.25 848 212 560 140 780 195 92%

Hot Deck 13 CD 6x6 0.25 848 212 380 95 780 195 92%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

CH ENG'R'S OFF

Cold Deck 14 CD 6x6 0.25 780 195 300 75 800 200 103%

Hot Deck 14 CD 6x6 0.25 780 195 300 75 800 200 103%

Remarks: Spring regulator allows excessive airflow at minimum adjustable tension.

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #5) CH MATE

Cold Deck 15 CD 6x6 0.25 692 173 540 135 680 170 98%

Hot Deck 15 CD 6x6 0.25 692 173 280 70 640 160 92%

Remarks:

Test Date:

Readings By:

2/6/2024

KB

Design Preliminary Final Percent of Design

Area Served Outlet Design Preliminary Final

Percent of Design

Air Outlet Test

Report

DREDGE YAQUINA

8323-8194 System A/C SYS 03-62-2

2/6/2024

KB

Area Served Outlet Design Preliminary Final

Percent of Design

2/6/2024

KB

Area Served Outlet

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #6) 3RD ASS'T ENG'P

Cold Deck 16 CD 6x6 0.25 540 135 240 60 560 140 104%

Hot Deck 16 CD 6x6 0.25 540 135 220 55 560 140 104%

Remarks: Spring regulator is not operating properly.

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

Cold Deck 17 CD 6x6 0.25 540 135 380 95 540 135 100%

Hot Deck 17 CD 6x6 0.25 540 135 200 50 560 140 104%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #8) 3RD ASS'T ENG'R

Cold Deck 18 CD 6x6 0.25 540 135 240 60 580 145 107%

Hot Deck 18 CD 6x6 0.25 540 135 160 40 540 135 100%

Remarks: Spring regulator is not operating properly.

Test Date:

Readings By:

Area Served Outlet Design Preliminary Final

Percent of Design

(SR #7) RADIO EQUIP &

RADIO OFF

2/6/2024

KB

2/6/2024

KB

Area Served Outlet Design Preliminary Final

Percent of Design

Air Outlet Test

Report

KB

DREDGE YAQUINA

8323-8194 System A/C SYS 03-62-2

Area Served Outlet Design Preliminary Final

Percent of Design

2/6/2024

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #9) 3RD MATE

Cold Deck 19 CD 6x6 0.25 540 135 360 90 580 145 107%

Hot Deck 19 CD 6x6 0.25 540 135 340 85 500 125 93%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #10) 2ND ASS'T ENG'R

Cold Deck 20 CD 6x6 0.25 540 135 240 60 560 140 104%

Hot Deck 20 CD 6x6 0.25 540 135 160 40 540 135 100%

Remarks: Spring regulator is not operating properly.

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #11) 3RD MATE

Cold Deck 21 CD 6x6 0.25 540 135 440 110 580 145 107%

Hot Deck 21 CD 6x6 0.25 540 135 180 45 560 140 104%

Remarks: Spring regulator is not operating properly.

Test Date:

Readings By:

Air Outlet Test

Report

DREDGE YAQUINA

8323-8194 System A/C SYS 03-62-2

2/6/2024

KB

Percent of Design

Area Served Outlet Design Preliminary Final

Percent of Design

Area Served Outlet Design Preliminary Final

Percent of Design

2/6/2024

KB

2/6/2024

KB

Area Served Outlet Design Preliminary Final

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #12) 1ST ASS'T ENG'R

Cold Deck 22 CD 6x6 0.25 540 135 280 70 572 143 106%

Hot Deck 22 CD 6x6 0.25 540 135 180 45 580 145 107%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #13) 2ND MATE

Cold Deck 23 CD 6x6 0.25 540 135 400 100 560 140 104%

Hot Deck 23 CD 6x6 0.25 540 135 180 45 580 145 107%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #14) 3RD MATE

Cold Deck 24 CD 6x6 0.25 604 151 460 115 660 165 109%

Hot Deck 24 CD 6x6 0.25 604 151 420 105 580 145 96%

Remarks:

Test Date:

Readings By:

Air Outlet Test

Report

DREDGE YAQUINA

8323-8194 System A/C SYS 03-62-2

2/6/2024

KB

Area Served Outlet Design Preliminary Final

Percent of Design

KB

2/7/2024

2/6/2024

KB

Area Served Outlet Design Preliminary Final

Percent of Design

Area Served Outlet Design Preliminary Final

Percent of Design

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #15) 3RD MATE

Cold Deck 25 CD 6x6 0.25 632 158 440 110 660 165 104%

Hot Deck 25 CD 6x6 0.25 632 158 180 45 580 145 92%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #16) 3RD MATE

Cold Deck 26 CD 6x6 0.25 636 159 360 90 640 160 101%

Hot Deck 26 CD 6x6 0.25 636 159 340 85 580 145 91%

Remarks: Spring regulator is not operating properly.

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #17) 3RD MATE

Cold Deck 27 CD 6x6 0.25 636 159 400 100 680 170 107%

Hot Deck 27 CD 6x6 0.25 636 159 180 45 680 170 107%

Remarks:

Test Date:

Readings By:

Air Outlet Test

Report

DREDGE YAQUINA

Area Served Outlet Design Preliminary Final

Percent of Design

2/7/2024

KB

Area Served Outlet Design Preliminary Final

8323-8194 System A/C SYS 03-62-2

Area Served Outlet

2/7/2024

KB

KB

Percent of Design

2/7/2024

Percent of Design

Design Preliminary Final

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #18) 2-JR. ENG'R'S

Cold Deck 28 CD 6x6 0.25 540 135 640 160 560 140 104%

Hot Deck 28 CD 6x6 0.25 540 135 440 110 520 130 96%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

SHIPS OFFICE

Cold Deck 29 CD 6x6 0.25 704 176 460 115 740 185 105%

Hot Deck 29 CD 6x6 0.25 704 176 500 125 760 190 108%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #19) CLERK

Cold Deck 30 CD 6x6 0.25 500 125 432 108 540 135 108%

Hot Deck 30 CD 6x6 0.25 500 125 480 120 500 125 100%

Remarks: Spring regulator has been removed.

Test Date:

Readings By: KB

Area Served Outlet Design Preliminary Final

2/7/2024

KB

Area Served Outlet Design Preliminary Final

Percent of Design

Percent of Design

Area Served Outlet Design Preliminary Final

Percent of Design

Air Outlet Test

Report

A/C SYS 03-62-2

2/7/2024

KB

2/7/2024

System

DREDGE YAQUINA

8323-8194

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #20) COOK HELPER

Cold Deck 31 CD 6x6 0.25 540 135 480 120 580 145 107%

Hot Deck 31 CD 6x6 0.25 540 135 240 60 520 130 96%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

Cold Deck 32 CD 6x6 0.25 540 135 400 100 500 125 93%

Hot Deck 32 CD 6x6 0.25 540 135 400 100 580 145 107%

Remarks: Spring regulator is not operating properly.

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #22) ASST COOKS

Cold Deck 33 CD 6x6 0.25 540 135 500 125 560 140 104%

Hot Deck 33 CD 6x6 0.25 540 135 240 60 540 135 100%

Remarks:

Test Date:

Readings By:

Area Served Outlet

8323-8194 System A/C SYS 03-62-2

Air Outlet Test

Report

DREDGE YAQUINA

(SR #21) BO'S'N & ASST.

BO'S'N

Design Preliminary Final Percent of Design

2/7/2024

KB

Area Served Outlet Design Preliminary Final

Percent of Design

Area Served Outlet Design Preliminary Final

KB

2/7/2024

Percent of Design

2/7/2024

KB

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #23) DECK HANDS

Cold Deck 34 CD 6x6 0.25 540 135 296 74 580 145 107%

Hot Deck 34 CD 6x6 0.25 540 135 260 65 580 145 107%

Remarks: Spring regulator is not operating properly.

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

(SR #24) STEWARD COOK

Cold Deck 35 CD 6x6 0.25 540 135 460 115 540 135 100%

Hot Deck 35 CD 6x6 0.25 540 135 360 90 580 145 107%

Remarks: Spring regulator is not operating properly.

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

DRY STORES

Cold Deck 36 CD 6x6 0.25 520 130 580 145 540 135 104%

Hot Deck 36 CD 6x6 0.25 520 130 600 150 560 140 108%

Remarks:

Test Date:

Readings By:

Air Outlet Test

Report

DREDGE YAQUINA

8323-8194 System A/C SYS 03-62-2

Area Served Outlet Design Preliminary Final

Percent of Design

KB

2/8/2024

2/7/2024

2/7/2024

KB

KB

Area Served Outlet Design Preliminary Final

Percent of Design

Area Served Outlet Design Preliminary Final

Percent of Design

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

MESS ENTRY

Cold Deck 37 CD 6x6 0.25 516 129 560 140 540 135 105%

Hot Deck 37 CD 6x6 0.25 516 129 720 180 500 125 97%

Remarks:

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

CREW MESS

Cold Deck 38 CD 6 0.2 1740 348 900 180 1575 315 91%

Hot Deck 38 CD 6 0.2 1740 348 600 120 875 175 50%

Remarks: Flex ductwork is kinked and restrictive. Unable to achieve design heating CFM

Test Date:

Readings By:

No. Type Size Ak Vel. Flow Vel. Flow Vel. Flow

OFFICER MESS

Cold Deck 39 CD 6 0.2 1235 247 1075 215 1275 255 103%

Cold Deck 40 CD 6 0.2 1235 247 1100 220 1300 260 105%

Totals 494 515 104%

Hot Deck 39 CD 6 0.2 1235 247 975 195 1325 265 107%

Hot Deck 40 CD 6 0.2 1235 247 975 195 1325 265 107%

Totals 494 530 107%

Remarks:

Test Date:

Readings By:

Air Outlet Test

Report

DREDGE YAQUINA

8323-8194 System A/C SYS 03-62-2

Area Served Outlet Design Preliminary Final

Percent of Design

2/8/2024

KB

Area Served Outlet Design Preliminary Final

Percent of Design

2/8/2024

KB

Area Served Outlet Design Preliminary Final

Percent of Design

2/8/2024

KB

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

SYSTEM/UNIT: EF-01

Log: EF-01 2/14/2024 Kyle Bush Inlets -33 & -34 formerly served as dryer exhaust vents and have been removed and capped.

EF-01 2/14/2024 Kyle Bush Inlet-31 has been removed and capped.

EF-01 2/14/2024 Kyle Bush Inlet-2 has been removed and capped due to renovation.

EF-01 2/14/2024 Kyle Bush Inlet-30 is not shown on original drawings. Design CFM is not known.

EF-01 2/14/2024 Kyle Bush Inlet-32 is not adequately connected to ceiling causing exhaust air to be pulled from above ceiling.

Unit Data Fan Manufacturer Not Legible Fan Model Number Not Legible Fan Serial Number Not Legible

Test Data Design Actual

Total Airflow 2595 CFM 2475 CFM Motor Volts 474 Volts Motor Amps 3.60 Amps Brake Horse Power 2.29 BHP CFLA 4.45 Amps SP In -2.36 in. wc SP Out 0.01 in. wc

Motor Data Rated Airflow Capacity 2860 CFM Motor Manufacturer Reliance Motor Frame 182TY Motor HP 3 HP Motor RPM 1750 RPM Motor Rated Volts 460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 4.60 Amps

Sheave Data Motor Fan

Manufacturer Direct Drive

System/Unit Outlet Type

Size LxW/D

AK Design

CFM

Prelim

CFM

% Prelim Final

CFM

% Final

Inlet-01 (SR

#01) MASTER

SR WASH RM

EX 6x4 75 85 113 70 93

Inlet-02 (SR

#02) ASS’T

MASTER SR

WASH RM

EX - - 105 0

Inlet-03 (SR

#03) ASS’T CH

ENG’R WASH

RM

EX 6x4 70 35 50 70 100

Inlet-04 (SR

#04) CH ENG’R

WASH RM

EX 6x4 70 45 64 70 100

Inlet-05 (SR

#05) CH MATE

WASH RM

EX 6x4 65 90 138 65 100

Inlet-06 (SR

#06) 3RD

ASS’T ENG’P

WASH RM

EX 6x4 65 60 92 60 92

Inlet-07 (SR

#07) WASH RM

EX 6x4 65 50 77 65 100

Inlet-08 (SR

#08) 3RD

ASS’T ENG’R

WASH RM

EX 6x4 65 65 100 60 92

EF-01 Exhaust Inlet Summary

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

System/Unit Outlet Type

Size LxW/D

AK Design

CFM

Prelim

CFM

% Prelim Final

CFM

% Final

Inlet-09 (SR

#09) 3RD

MATE WASH

RM

EX 6x4 65 45 69 65 100

Inlet-10 (SR

#10) 2ND

ASS’T ENG’R

WASH RM

EX 6x4 65 50 77 65 100

Inlet-11 (SR

#11) 3RD

MATE WASH

RM

EX 6x4 65 60 92 60 92

Inlet-12 (SR

#12) 1ST ASS’T

ENG’R WASH

RM

EX 6x4 65 45 69 60 92

Inlet-13 (SR

#13) 2ND

MATE WASH

RM

EX 6x4 65 45 69 60 92

Inlet-14 (SR

#14) 3RD

MATE & I-

SPARE WASH

RM

EX 6x4 75 40 53 70 93

Inlet-15 (SR

#15) 3RD

MATE & I-

SPARE WASH

RM

EX 6x4 75 90 120 70 93

Inlet-16 (SR

#16) 3RD

MATE & I-

SPARE WASH

RM

EX 6x4 70 60 86 65 93

Inlet-17 (SR

#17) 3RD

MATE & I-

SPARE WASH

RM

EX 6x4 70 85 121 65 93

Inlet-18 (SR

#18) 2-JR

ENG’R’S

WASH RM

EX 6x4 65 90 138 60 92

Inlet-19 (SR

#19) CLERK

WASH RM

EX 6x4 65 160 246 60 92

Inlet-20 (SR

#20) COOK

HELPER

WASH RM

EX 6x4 65 55 85 60 92

Inlet-21 (SR

#21) BO’S’N

AND ASS’T

BO’S’T WASH

RM

EX 6x4 65 55 85 65 100

Inlet-22 (SR

#22) ASS’T

COOKS WASH

RM

EX 6x4 65 55 85 60 92

Inlet-23 (SR

#23) DECK

HANDS WASH

RM

EX 6x4 65 50 77 65 100

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

System/Unit Outlet Type

Size LxW/D

AK Design

CFM

Prelim

CFM

% Prelim Final

CFM

% Final

Inlet-24 (SR #24)

STEWARD

COOK WASH

RM

EX 6x4 65 55 85 65 100

Inlet-25

BRIDGE DECK

PUBLIC WASH

RM

EX 6x4 65 100 154 60 92

Inlet-26 FAN

RM

EX 6 105 135 129 95 90

Inlet-27 LINEN

LKR

EX 6 25 60 240 25 100

Inlet-28 LINEN

LKR

OED 3 60 25 42 55 92

Inlet-29 DECK

TOILET

EX 6 60 90 150 55 92

Inlet-30 DRY

STORES

EX 6x4 - 15 25

Inlet-31 CG

LKR

EX - - - -

Inlet-32

LAUNDRY

EX 12x4 315 210 67 285 90

Inlet-33 DK

LKR (PORT)

EX - - 0 0

Inlet-34 DK

LKR

(STARBOARD)

EX - - 0 0

Inlet-35 FAN

ROOM UNDER

PILOT HOUSE

OED 9 420 960 229 400 95

Totals: - - - 2595 3170 122 2475 95

LOCATION:

Dredge Yaquina Portland, OR

83238194PROJECT #:

DATE:

CONTACT:

2/14/2024 Kyle Bush

Tested By: Kyle Bush Date: 2/14/2024

SYSTEM/UNIT: EF-01/Duct-01

Log: EF-01/Duct-01 2/14/2024 Kyle Bush Traverse does not include Outlet-35.

Traverse Data Points

Unit Data Type of Traverse Rectangular Outer Height 12.0 in.

Outer Width 16.0 in.

Insulation Width 0.0 in.

Air Flow Area 1.333 sq. ft.

Number Of Rows 4 Readings Per Row 4 Total Readings 16 Location of Holes 1 Left

Final Data Sum of Readings 25362 Average Reading 1585 FPM Reading Std. Dev. 91 FPM Design Total Flow 2175 CFM Actual Total Flow 2113 CFM Duct Static Press. -2.36 in. wc

24 24

383940

IOM-009