B.08 Price List_Rev1.xlsx
XLSX spreadsheet 84 KB Posted
- Attached to
- FY25 Yaquina Overhaul
- Solicitation number
- W9127N24B0012
About this file
This document appears to be a pricing list for a federal contract opportunity related to the overhaul, maintenance, and repair of the Dredge YAQUINA. The contract opportunity is solicitation number W9127N24B0012, titled "FY25 Yaquina Overhaul".
The key details include the required work items, which cover a wide range of services across various categories such as transportation, drydocking, machinery, hull, hopper, bow thruster, deck, and house. The pricing list provides a detailed breakdown of the work items, their corresponding Performance Work Statement (PWS) paragraphs, quantities, units, and unit prices. Additionally, the document includes pricing information for "Over & Above Work" items, such as ship repair labor rates and daily rates for pier-side and drydocking extensions. The contract opportunity is being issued by the U.S. Army Corps of Engineers, Portland District, and requires a site visit for contractors to be eligible for award.
View the file
Other files
Show 40 more
Latest 50 of 136 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection / Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office | 5.1.5 | 1 | Day | $ - 0 | |
| Parking | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking (Lift Day) | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day Services | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | 1 | Job | $ - 0 | |
| Steam / Chilled Water | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemists Certifications | 5.2.6 | 1 | Job | $ - 0 | |
| Main Propulsion - Shaft Bearing Replacement | 5.3.2 | 1 | Job | $ - 0 | |
| Main Propulsion - Shafting & Rudder Clearances | 5.3.6 | 1 | Job | $ - 0 | |
| Machinery - Slops Tanks Annual Maintenance | 5.4.1 | 1 | Job | $ - 0 | |
| Machinery - Pump Room Bilge Cleaning | 5.4.2 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Bilge Cleaning | 5.4.6 | 1 | Job | $ - 0 | |
| Machinery - Emergency Generator Service | 5.4.7 | 1 | Job | $ - 0 | |
| Machinery - Dredge Yaquina MTU Engines Repairs and Services | 5.4.8 | 1 | Job | $ - 0 | |
| Machinery - Dock and Sea Trials | 5.4.9 | 1 | Job | $ - 0 | |
| Machinery - CRPP Control Service Inspection | 5.4.10 | 1 | Job | $ - 0 | |
| Hull - Sluice Valve Replacement | 5.5.7 | 1 | Job | $ - 0 | |
| Hull – Pressure Wash Exterior Hull | 5.5.9 | 1 | Job | $ - 0 | |
| Hull - Watertight Doors Replace | 5.5.10 | 1 | Job | $ - 0 | |
| Hull - Insert Tank Top Plate in Way of FR. 22 (STBD), OUTBOARD OF 19’ OFF C.L. | 5.5.11 | 1 | Job | $ - 0 | |
| Hull - Insert Tank Top Sewage Flat Tank Top In Way of FR. 78 ~ 83 (PORT & STBD) | 5.5.12 | 1 | Job | $ - 0 | |
| Hull - Insert Upper Deck Plating I.W.O FR. 52-54, P&S | 5.5.13 | 1 | Job | $ - 0 | |
| Hull - Insert Bottom Shell Plating in Way of FR. 42 (STARBOARD) | 5.5.14 | 1 | Job | $ - 0 | |
| Hull - Insert Coaming Top Inboard Bracket I.W.O FR. 52-53 / 20’ Off C.L., PORT & STARBOARD | 5.5.15 | 1 | Job | $ - 0 | |
| Hull - Insert Bottom Plating Port Side at Frame 35 TO 36 | 5.5.16 | 1 | Job | $ - 0 | |
| Hull - Insert Bottom Shell Plating in Way of Steering Gear Compartment, FR. 88~89 (STBD), ~ 7’2” OFF C.L | 5.5.17 | 1 | Job | $ - 0 | |
| Hull - Insert Tank Top Plating in Way of Trunnion Room / FR. 28~32 (P & S) / OUTBOARD OF 20’ OFF C.L. | 5.5.18 | 1 | Job | $ - 0 | |
| Hopper - Hopper Inspection Staging | 5.6.7 | 1 | Job | $ - 0 | |
| Hopper – Hopper I Beam Shield | 5.6.10 | 1 | Job | $ - 0 | |
| Hopper – Hopper I Beam Replacement | 5.6.11 | 1 | Job | $ - 0 | |
| Hopper – Irathane Coating System | 5.6.12 | 1 | Job | $ - 0 | |
| Bow Thruster - Inspection Setup | 5.7.1 | 1 | Job | $ - 0 | |
| Deck - Annual Rescue Boat Davit Maintenance | 5.8.3 | 1 | Job | $ - 0 | |
| Deck - Chain Locker Cleaning | 5.8.4 | 1 | Job | $ - 0 | |
| Deck - Launch Davit Annual Maintenance | 5.8.6 | 1 | Job | $ - 0 | |
| Deck - Lift Raft Annual Service | 5.8.7 | 1 | Job | $ - 0 | |
| Navigation, Communication and GMDSS Maintenance | 5.8.9 | 1 | Job | $ - 0 | |
| Deck – CuNi Pipe Replacement in Pump Room | 5.8.10 | 1 | Job | $ - 0 | |
| House - Clean and Inspect Galley Exhaust Dutching | 5.9.1 | 1 | Job | $ - 0 | |
| House - Fire Suppression Services | 5.9.3 | 1 | Job | $ - 0 | |
| ABS Inspection Services | 5.10.1 | 1 | Job | $ - 0 | |
| Inspection - Audio Gauging Services | 5.10.2 | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Services | 5.1.2 | 1 | Job | $ - 0 | |
| Main Propulsion - Strut Bore Reprair | 5.3.1 | 1 | Job | $ - 0 | |
| Main Propulsion - Shaft and CPP Overhaul | 5.3.3 | 1 | Job | $ - 0 | |
| Main Propulsion - Rudder Assembly Replacement | 5.3.4 | 1 | Job | $ - 0 | |
| Main Propulsion - Propeller Blade Repairs | 5.3.5 | 1 | Job | $ - 0 | |
| Machinery - House Main HVAC Supply Fan Overhaul | 5.4.3 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Supply Fan Overhaul | 5.4.4 | 1 | Job | $ - 0 | |
| Machinery - Engine Room Exhaust Fan Overhaul | 5.4.5 | 1 | Job | $ - 0 | |
| Hull - Coating of Hull Above Waterline | 5.5.1 | 23000 | SqFt | $ - 0 | |
| Hull - Coating of Hull Below Waterline | 5.5.2 | 3000 | SqFt | $ - 0 | |
| Hull - Hull Anode Renewal | 5.5.3 | 1 | Job | $ - 0 | |
| Hull - Internal Tank Inspection | 5.5.4 | 1 | Job | $ - 0 | |
| Hull - Skin Valves and Sea Strainers Inspection | 5.5.5 | 1 | Job | $ - 0 | |
| Hull - Sliding Piece Fit-Up | 5.5.6 | 1 | Job | $ - 0 | |
| Hull - Suction Inlet Hull Rings and Pipe Liners Replacement | 5.5.8 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Bearing Support Channel Overhaul | 5.6.1 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Hinge Bushings Renewal | 5.6.2 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Hydraulic Cylinder Overhaul | 5.6.3 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Operating Rod Replacement | 5.6.4 | 1 | Job | $ - 0 | |
| Hopper - Hopper Door Retaining Bar Repair | 5.6.5 | 1 | Job | $ - 0 | |
| Hopper - Hopper I Beam Inspection | 5.6.6 | 1 | Job | $ - 0 | |
| Hopper - Hopper Overflow Hydraulic Cylinder Overhaul | 5.6.8 | 1 | Job | $ - 0 | |
| Hopper - Hopper Swell Compensator Cylinder Overhaul | 5.6.9 | 1 | Job | $ - 0 | |
| Bow Thruster - Inspection, Oil and Seal Change | 5.7.2 | 1 | Job | $ - 0 | |
| Bow Thruster - Pod Preservation | 5.7.3 | 1 | Job | $ - 0 | |
| Bow Thruster - Sleeve Replacement | 5.7.4 | 1 | Job | $ - 0 | |
| Deck - 20-inch Pipe Replacement | 5.8.1 | 1 | Job | $ - 0 | |
| Deck - Anchor and Anchor Chain Reconditioning | 5.8.2 | 1 | Job | $ - 0 | |
| Deck - Coating Weather Decks | 5.8.5 | 6000 | SqFt | $ - 0 | |
| Deck – Auto Pilot Renew | 5.8.11 | 1 | Job | $ - 0 | |
| Deck – Install RTX Tide Input | 5.8.12 | 1 | Job | $ - 0 | |
| Deck - Winch System Emergency Bypass for ILS System | 5.8.13 | 1 | Job | $ - 0 | |
| Deck - ILS DMCS System Dredging Consoles | 5.8.14 | 1 | Job | $ - 0 | |
| House - Coating Aluminum House | 5.9.2 | 4000 | SqFt | $ - 0 | |
| House – HVAC Repairs | 5.9.4 | 1 | Job | $ - 0 | |
| House – Tile and Grout Cleaning Service | 5.9.5 | 1 | Job | $ - 0 | |
| House - Clean and Inspect of Sewage Pipes | 5.9.6 | 1 | Job | $ - 0 | |
| Total Category B Work Items | $ - 0 |
Over & Above Work
| Over & Above Work | |||||
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 11,000 | $0.00 | ||
| Materials & Subcontractor | 6.1 | $ 500,000.00 | $ 500,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $500,000.00 |