B.08 Price List_Rev2.xlsx

XLSX spreadsheet 84 KB Posted

Attached to
FY25 Yaquina Overhaul
Solicitation number
W9127N24B0012
Issued by

About this file

This document is a price list for a firm fixed-price job order under a Master Ship and Repair Agreement (MSRA) for the overhaul, maintenance, and repair of the Dredge YAQUINA. The key details are:

The U.S. Army Corps of Engineers, Portland District intends to award this firm fixed-price job order for the dredge overhaul. The work includes transportation, dry docking, hull and machinery maintenance and repairs, and various other services. The price list provides unit prices for over 60 discrete work items across categories A and B. There is also a section for "Over & Above Work" that includes a ship repair labor rate and materials/subcontractor pricing. The contract opportunity requires a mandatory site visit for all prospective contractors, with specific visit dates provided. Bids are due by August 23, 2024. The dredge overhaul work must be performed at the contractor's facility, and the government will deliver the vessel. Upon completion, the government will conduct dock and sea trials prior to final acceptance.

View the file

Other files

File Type Posted
C.04_FormalAbstractOfOffers7N24B0012_signed.pdf PDF
C.04_BidRoster7N24B0012.xlsx XLSX spreadsheet
B.08 W9127N24B0012 0005 Yaquina Overhaul FY25 Solicitation.pdf PDF
B.08 Price List_Rev4.xlsx XLSX spreadsheet
B.08 W9127N24B0012 Yaquina Overhaul FY25 Solicitation Projnet Questions and Responses.pdf PDF
Y-1034-1 Top of Hopper5.6.11.pdf PDF
B.08 W9127N24B0012 0004 Yaquina Overhaul FY25 Solicitation.pdf PDF
B.08 Price List_Rev3.xlsx XLSX spreadsheet
I-beam Shield.jpg JPG image
I Beam shield.png PNG image
December 2017 International Inspection Gaugings P6621 - Yaquina Report.pdf PDF
Launch Davit Maintenance.pdf PDF
B.08 W9127N24B0012 0003 Yaquina Overhaul FY25 Solicitation.pdf PDF
CuNi Pipe Drawing.pdf PDF
Yaquina Steering Documentation Jan. 2010.pdf PDF
3060_Pilotstar_D_AP02-S01_102-863_864.pdf PDF
B.08 W9127N24B0012 0002 Yaquina Overhaul FY25 Solicitation.pdf PDF
B.08 Price List_Rev1.xlsx XLSX spreadsheet
B.08 W9127N24B0012 0001 Yaquina Overhaul FY25 Solicitation.pdf PDF
5.5.7 Sluice Valves - 353-E507-01REV-A DREDGE PIPE ARRANGMENT.pdf PDF
5.5.9 - Y-1032-16 General Arrangement.pdf PDF
5.3.6 Main Propulsion Shafting and Rudder Clearance - Y-2274-1 Rudders.pdf PDF
5.6.9 - TJ 95340 Swell Compensator Cylinder.pdf PDF
5.5.14 - Y-2232-19 Upper Deck Plating & Beams.pdf PDF
5.3.4 - Y-2274-1 Rudders.pdf PDF
5.3.4 - Y-2274-2 Arrangement and Details of Rudder Stock.pdf PDF
5.4.5 - Y-3878-20 HVAC Bridge.pdf PDF
5.3.2 - Hundested 2-140-021135-1 MP700-CPG120 Flange Coupling Assembly.pdf PDF
5.6.4 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.6.3 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.3.3 - Hundested 0-002-020933-2 MP700 Propeller Hoved Samling.pdf PDF
5.4.5 - Y-3878-11 HVAC DIAGRAM & Equipment List.pdf PDF
5.5.4 Tanks - Y-2232-23 Rev D Misc Flats Plating and Beam.pdf PDF
5.5.15 - Y-2232-12 Shell Expansion.pdf PDF
5.4.2 - MDC 353-E645-2012-05 REV A Coffer Dam.pdf PDF
5.5.13 - Y-2232-12 Shell Expansion.pdf PDF
5.6.6 - Y-2494-3 Hopper Framing - Copy.pdf PDF
5.8.9 - GX5500S.pdf PDF
5.9.4 - Y-3878-19 HVAC Bridge Deck.pdf PDF
5.6.6 - Y-1034-1 Top of Hopper.pdf PDF
5.5.4 Tanks - Y-2232-9 Tank Top Plating.pdf PDF
5.8.9 - Furuno GP-170 AIS.pdf PDF
5.6.10 - Y-2494-3 Hopper Framing.pdf PDF
5.5.5 - Y-3872-4 Arrangement Firemain System.pdf PDF
5.6.8 - Y-2496-2 Hopper Door Operating Gear.pdf PDF
5.3.3 - Hundested 1-022-021126-2 MP700-CPG120 Installation Unit 6331-G1178.pdf PDF
5.6.8 - Y-2496-3 Hyd Cylinders Ovfl Trough & Hopper Doors.pdf PDF
5.9.3 - D-1441-2.PDF PDF
5.5.18 - Y-2232-12 Shell Expansion.pdf PDF
5.4.3 - Y-3878-11 HVAC Equipment.pdf PDF
Show 40 more

Latest 50 of 136 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAT A

Category A Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Transportation5.1.14Each$ - 0
Crane Services5.1.375Hour$ - 0
Connection / Disconnection of Services5.1.41Job$ - 0
Field Office5.1.51Day$ - 0
Parking5.1.61Job$ - 0
Drydocking (Lift Day)5.2.11Job$ - 0
Drydock Lay Day Services5.2.260Day$ - 0
Wet Berth5.2.315Day$ - 0
Electricity5.2.41Job$ - 0
Steam / Chilled Water5.2.575Day$ - 0
Marine Chemists Certifications5.2.61Job$ - 0
Main Propulsion - Shaft Bearing Replacement5.3.21Job$ - 0
Main Propulsion - Shafting & Rudder Clearances5.3.61Job$ - 0
Machinery - Slops Tanks Annual Maintenance5.4.11Job$ - 0
Machinery - Pump Room Bilge Cleaning5.4.21Job$ - 0
Machinery - Engine Room Bilge Cleaning5.4.61Job$ - 0
Machinery - Emergency Generator Service5.4.71Job$ - 0
Machinery - Dredge Yaquina MTU Engines Repairs and Services5.4.81Job$ - 0
Machinery - Dock and Sea Trials5.4.91Job$ - 0
Machinery - CRPP Control Service Inspection5.4.101Job$ - 0
Hull - Sluice Valve Replacement5.5.71Job$ - 0
Hull – Pressure Wash Exterior Hull5.5.91Job$ - 0
Hull - Watertight Doors Replace5.5.101Job$ - 0
Hull - Insert Tank Top Plate in Way of FR. 22 (STBD), OUTBOARD OF 19’ OFF C.L.5.5.111Job$ - 0
Hull - Insert Tank Top Sewage Flat Tank Top In Way of FR. 78 ~ 83 (PORT & STBD)5.5.121Job$ - 0
Hull - Insert Upper Deck Plating I.W.O FR. 52-54, P&S5.5.131Job$ - 0
Hull - Insert Bottom Shell Plating in Way of FR. 42 (STARBOARD)5.5.141Job$ - 0
Hull - Insert Coaming Top Inboard Bracket I.W.O FR. 52-53 / 20’ Off C.L., PORT & STARBOARD5.5.151Job$ - 0
Hull - Insert Bottom Plating Port Side at Frame 35 TO 365.5.161Job$ - 0
Hull - Insert Bottom Shell Plating in Way of Steering Gear Compartment, FR. 88~89 (STBD), ~ 7’2” OFF C.L5.5.171Job$ - 0
Hull - Insert Tank Top Plating in Way of Trunnion Room / FR. 28~32 (P & S) / OUTBOARD OF 20’ OFF C.L.5.5.181Job$ - 0
Hopper - Hopper Inspection Staging5.6.71Job$ - 0
Hopper – Hopper I Beam Shield5.6.101Job$ - 0
Hopper – Hopper I Beam Replacement5.6.111Job$ - 0
Hopper – Irathane Coating System5.6.121Job$ - 0
Bow Thruster - Inspection Setup5.7.11Job$ - 0
Deck - Annual Rescue Boat Davit Maintenance5.8.31Job$ - 0
Deck - Chain Locker Cleaning5.8.41Job$ - 0
Deck - Launch Davit Annual Maintenance5.8.61Job$ - 0
Deck - Lift Raft Annual Service5.8.71Job$ - 0
Navigation, Communication and GMDSS Maintenance5.8.91Job$ - 0
Deck – CuNi Pipe Replacement in Pump Room5.8.101Job$ - 0
House - Clean and Inspect Galley Exhaust Dutching5.9.11Job$ - 0
House - Fire Suppression Services5.9.31Job$ - 0
ABS Inspection Services5.10.11Job$ - 0
Inspection - Audio Gauging Services5.10.21Job$ - 0
Total Category A Work Items$ - 0

CAT B

Category B Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Tug Services5.1.21Job$ - 0
Main Propulsion - Strut Bore Reprair5.3.11Job$ - 0
Main Propulsion - Shaft and CPP Overhaul5.3.31Job$ - 0
Main Propulsion - Rudder Assembly Replacement5.3.41Job$ - 0
Main Propulsion - Propeller Blade Repairs5.3.51Job$ - 0
Machinery - House Main HVAC Supply Fan Overhaul5.4.31Job$ - 0
Machinery - Engine Room Supply Fan Overhaul5.4.41Job$ - 0
Machinery - Engine Room Exhaust Fan Overhaul5.4.51Job$ - 0
Hull - Coating of Hull Above Waterline5.5.11000SqFt$ - 0
Hull - Coating of Hull Below Waterline5.5.23000SqFt$ - 0
Hull - Hull Anode Renewal5.5.31Job$ - 0
Hull - Internal Tank Inspection5.5.41Job$ - 0
Hull - Skin Valves and Sea Strainers Inspection5.5.51Job$ - 0
Hull - Sliding Piece Fit-Up5.5.61Job$ - 0
Hull - Suction Inlet Hull Rings and Pipe Liners Replacement5.5.81Job$ - 0
Hopper - Hopper Door Bearing Support Channel Overhaul5.6.11Job$ - 0
Hopper - Hopper Door Hinge Bushings Renewal5.6.21Job$ - 0
Hopper - Hopper Door Hydraulic Cylinder Overhaul5.6.31Job$ - 0
Hopper - Hopper Door Operating Rod Replacement5.6.41Job$ - 0
Hopper - Hopper Door Retaining Bar Repair5.6.51Job$ - 0
Hopper - Hopper I Beam Inspection5.6.61Job$ - 0
Hopper - Hopper Overflow Hydraulic Cylinder Overhaul5.6.81Job$ - 0
Hopper - Hopper Swell Compensator Cylinder Overhaul5.6.91Job$ - 0
Bow Thruster - Inspection, Oil and Seal Change5.7.21Job$ - 0
Bow Thruster - Pod Preservation5.7.31Job$ - 0
Bow Thruster - Sleeve Replacement5.7.41Job$ - 0
Deck - 20-inch Pipe Replacement5.8.11Job$ - 0
Deck - Anchor and Anchor Chain Reconditioning5.8.21Job$ - 0
Deck - Coating Weather Decks5.8.56000SqFt$ - 0
Deck – Auto Pilot Renew5.8.111Job$ - 0
Deck – Install RTX Tide Input5.8.121Job$ - 0
Deck - Winch System Emergency Bypass for ILS System5.8.131Job$ - 0
Deck - ILS DMCS System Dredging Consoles5.8.141Job$ - 0
House - Coating Aluminum House5.9.24000SqFt$ - 0
House – HVAC Repairs5.9.41Job$ - 0
House – Tile and Grout Cleaning Service5.9.51Job$ - 0
House - Clean and Inspect of Sewage Pipes5.9.61Job$ - 0
Total Category B Work Items$ - 0

Over & Above Work

Over & Above Work
SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
Over & Above Work
Item DescriptionPWS
ParagraphRequired Level
Of Effort HoursMaterialsFully Burdened
Labor RateMaterial Burden RateTotal Cost
Ship Repair Labor Rate6.111,000$0.00
Materials & Subcontractor6.1$ 500,000.00$ 500,000.00
SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED)
Over & Above Work
Item DescriptionPWS
ParagraphQtyUnitUnit PriceTotal Cost
Dry-Docking Extension Cost6.110Days$ - 0
Pier Side Extension Costs6.114Days$ - 0
Total Over & Above Work Items$500,000.00

File details come from the government source that posted it. Updated .