B.08 7N23R0007 TDA Lamprey Amendment 4.pdf

PDF 574 KB Posted

Attached to
TDA Fish Accords Lamprey The Dalles
Solicitation number
W9127N23R0007
Issued by

About this file

This amendment modifies a solicitation for a fish passage project. The amendment provides clarification on the solicitation, including closing the bidder inquiry system on June 2, 2023 at 2pm Pacific Time. It attaches a photo of the approximate location of 250 MCM ground conductor and a drawing showing the same. The amendment also adds notes to specification sheets regarding hemmed edge requirements and anchor specifications. It clarifies that design of the flume is not included in the contract's scope of work and revises language to allow H32 aluminum. The related federal contract opportunity is a solicitation issued on April 28, 2023 by the U.S. Army Corps of Engineers Portland District for fish passage improvements at The Dalles Dam known as the TDA Fish Accords Lamprey Project.

View the file

Other files

File Type Posted
B.08 7N23R0007 TDA Lamprey Amendment 5.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 Sheet M 001.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 Approximate 250 MCM ground conductor routing.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 Sheet MF 101.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 Specification 35 79 13.04 25.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 250 MCM Ground Conductor.jpg JPG image
B.08 7N23R0007 TDA Lamprey Amendment 3 Sheet SL202.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3 Specification 22 00 00.00 25.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3 Specification 35 79 13.04 25.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3 Specification 05 50 15.00 25.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3 Sheet SL201.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 2 Mechanical Plans.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 2.pdf PDF
I.01 7N23R0007 TDA Lamprey Site Visit Attendance Sheet.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 2 Sheet G 001.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 1.pdf PDF
B.08 7N23R0007 TDA Lamprey Attachment A Offeror Experience Form.pdf PDF
B.08 7N23R0007 TDA Lamprey Attachment B Past Performance Questionnaire.pdf PDF
B.08 7N23R0007 TDA Lamprey Reference Drawings.pdf PDF
B.08 7N23R0007 TDA Lamprey Plans.pdf PDF
B.08 7N23R0007 TDA Lamprey Solicitation and Specifications.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see the block 14 continuation page for the purpose of this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jun-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N23R0007

X 9B. DATED (SEE ITEM 11)

28-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jun-2023

CODE

USACE, PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N23R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 4

Here is the purpose of this amendment:

1. The bidder inquiry system will be closed for questions effective 06/02/2023 at 2pm PT.

2. 250 MCM Ground Conductor photo is attached showing a visible section of the grounding conductor.

3. Approximate 250 MCM ground conductor routing.pdf attached showing markup of the approximate location of the grounding conductor.

4. Sheet M-001, added general note number 19 to update requirements for hemmed edges.

5. Sheet MF-101, added note number 2 to update requirements for ½-inch anchors.

6. Specification section 35 79 13.04 25 has been revised. Paragraph 1.1 clarifies that design of the flume is not in the contract scope of work. Paragraph 2.2.1-a is revised to allow H32 aluminum.

All other terms and conditions remain unchanged.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .