B.08 7N23R0007 TDA Lamprey Attachment B Past Performance Questionnaire.pdf

PDF 351 KB Posted

Attached to
TDA Fish Accords Lamprey The Dalles
Solicitation number
W9127N23R0007
Issued by

About this file

This document contains a past performance questionnaire template for a federal solicitation. The solicitation is for fish passage and lamprey attachment work at The Dalles Dam and was issued on April 28, 2023 by the Department of the Army Corps of Engineers Portland District. Offerors are required to submit completed past performance questionnaires from previous clients or CPARS evaluations with their proposals. If unable to obtain a completed questionnaire, offerors must submit contract and client information for the relevant project. Questionnaires may be submitted directly to the contracting officer's representative. The template collects information on the contractor and past project, including description, contract details, and client references. It also provides rating definitions and questions for clients to evaluate contractor performance quality, schedule, customer satisfaction, management, cost, safety, and other categories.

View the file

Other files

File Type Posted
B.08 7N23R0007 TDA Lamprey Amendment 5.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 Sheet M 001.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 Approximate 250 MCM ground conductor routing.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 Sheet MF 101.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 Specification 35 79 13.04 25.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 4 250 MCM Ground Conductor.jpg JPG image
B.08 7N23R0007 TDA Lamprey Amendment 3 Sheet SL202.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3 Specification 22 00 00.00 25.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3 Specification 35 79 13.04 25.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3 Specification 05 50 15.00 25.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 3 Sheet SL201.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 2 Mechanical Plans.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 2.pdf PDF
I.01 7N23R0007 TDA Lamprey Site Visit Attendance Sheet.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 2 Sheet G 001.pdf PDF
B.08 7N23R0007 TDA Lamprey Amendment 1.pdf PDF
B.08 7N23R0007 TDA Lamprey Attachment A Offeror Experience Form.pdf PDF
B.08 7N23R0007 TDA Lamprey Reference Drawings.pdf PDF
B.08 7N23R0007 TDA Lamprey Plans.pdf PDF
B.08 7N23R0007 TDA Lamprey Solicitation and Specifications.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

SOURCE SELECTION SENSITIVE INFORMATION

SEE FAR 2.101 AND 3.104

Source Selection Information -- See FAR 2.101 and 3.104.

ATTACHMENT B

PAST PERFORMANCE QUESTIONNAIRE

1. The USACE Form PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire.

2. Solicitations:

Solicitation Submittal Requirements:

“If there is not a completed CPARS evaluation, the offeror shall submit a Past Performance Questionnaire (PPQ) for the project. See Form PPQ-0 in Attachment B.

o Do not submit a PPQ when a completed CPARS is available.

o If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

o Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Aragon Liebzeit, via email at Aragon.N.Liebzeit@usace.army.mil prior to proposal closing date. The offerors shall instruct the clients to refer to the solicitation number in the subject line.

o PPQs are source selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the offeror does not receive the confirmation, it is the offeror’s responsibility to follow up to ensure the government has received the information.

o Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other procurements. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.

o Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.”

USACE Form PPQ will be made accessible on SAM.gov website as a separate attachment.

SEE FAR 2.101 AND 3.104

Source Selection Information -- See FAR 2.101 and 3.104.

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ 0) CONTRACT INFORMATION (Contractor to complete Blocks 1 4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work: High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5 8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

SEE FAR 2.101 AND 3.104

Source Selection Information -- See FAR 2.101 and 3.104.

7. Date Questionnairewas completed (mm/dd/yy):

8. Client’s Signature:

NOTE: USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE

COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE

THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS

ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.

HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE

CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES

THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

SEE FAR 2.101 AND 3.104

Source Selection Information -- See FAR 2.101 and 3.104.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner.

There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

SEE FAR 2.101 AND 3.104

Source Selection Information -- See FAR 2.101 and 3.104.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract

Rating will be neither positive nor negative.

Contractor Information (Firm):

Client Information (Name):

TO BE COMPLETEDBY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE

CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectivenessof contract problem resolution without extensive customer guidance E VG S M U N

d) Adequacy/effectivenessof quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediatemilestones. (If liquidated damageswere assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneouslymanage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N

Contractor Information (Firm):

Client Information (Name):

Please provide responses to the questions above (if applicable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

5. COST/FINANCIALMANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or PCO in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

File details come from the government source that posted it. Updated .