This document is an engineering drawing sheet for modifications to existing lamprey passage systems walkways and handrails at the Bonneville Dam Fish Accords project. The drawing shows plans and sections for installing new handrails at heights of 4 feet along walkways, including concrete anchors with a minimum embedment of 3.25 inches. Notations indicate the new handrails shall match adjacent existing handrails in design, with maximum post spacing of 8 feet. The contractor shall design the handrails and toe kicks, which are to be galvanized steel. Amendment #5 removed the requirement to replace existing handrails.
The related federal contract opportunity is a solicitation issued on April 26, 2023 seeking offers for the BON Fish Accords Lamprey Bonneville 1 project. Solicitation number W9127N23R0006 was issued by the Department of the Army Corps of Engineers Portland District for modifications to lamprey passage systems at the Bonneville Dam.
View the file
Other versions and copies of SF 501
| File | Revision | Posted | Attached to |
|---|---|---|---|
| SF501-10090.pdf | Revision not stated | Chicopee Armory Renovations Sub-Contractor Bids | |
| SF501-10090.pdf | Revision not stated | Chicopee Armory Renovations General Contractor Bids |
Who attaches SF 501
| State | Files |
|---|---|
| Massachusetts | 2 |
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
/2
/2
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P O
R T
L A
N D
O
R E
G O
N
P O
R T
L A
N D
D
IS
T R
IC
T
PORTLAND DISTRICT
B D
F .1
S
F X
X X
.d g n
0 0
A D
V E
R T
IS
E
L A
M P
R E
Y P
A S
S A
G E
F Y
F
IS
H
A C
C O
R D
S B
R A
D F
O R
D I
S L
A N
D F
IS
H
L A
D D
E R
W
N
R
B O
N N
E V
IL
L
E L
O C
K A
N D
D A
M
SF501
M A
T T
H E
W D
H
A N
S O
N
P E
A N
S I
D
A .C
IC
A
L E
S E
C O
L L
IN
R
P
O R
T E
R
A
H E
N
IN
G E
R
P L
A N
S A
N D
S E
C T
IO
N
S
L A
M P
R E
Y P
A S
S A
G E
S Y
S T
E M
W A
L K
W A
Y S
:1
NEW HANDRAILING
4'-0"
NEW HANDRAILING
E X
IS
T
IN
G H
A N
D R
A
IL
IN
G
E X
IS
T
IN
G H
A N
D R
A
IL
IN
G
EXISTING HANDRAILING
EXISTING HANDRAILING
N E
W H
A N
D R
A
IL
IN
G
N E
W H
A N
D R
A
IL
IN
G
TOE KICK (TYP)
NEW OPENING
NEW OPENING
CLARITY
NOT SHOWN FOR
HANDRAILS BEYOND
NOTE: EXISTING
TO TRAP BOX.
BAR FOR LPS ATTACHMENT
REMOVE HANDRAIL
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
D R
A W
IN
G
N U
M B
E R of Engineers
US Army Corps
P L
O T
D A
T E
54321
D
C
B
A
D R
A W
N B
Y
C H
E C
K E
D B
Y
CORED CONNECTION. REPAIR WITH COLD GALVANIZED FINISH.
8. WELD EXISTING HANDRAIL TO NEW HANDRAIL WITH SMOOTH
ACCORDING TO SPEC SECTION 05 50 15.00 25
7. HANDRAILS AND TOEKICK TO BE CONTRACTOR DESIGNED,
WHICH ARE GALVENIZED STEEL.
6. NEW HANDRAILS TO BE IN KIND WITH EXISTING ADJACENT HANDRAILS,
5. SPACING OF HANDRAIL POSTS TO BE MAXIMUM OF 8'.
WALKWAY
WALKWAY AND NEW HANDRAIL ISOMETRIC
NTS
EMBEDMENT TO BE MIN. 3.25".
STEEL CONCRETE MECHANICAL ANCHOR. ANCHOR
" DIAM. HDG CARBON8
4. HANDRAIL CONCRETE ANCHORS:
3. SEE SHEET S-001 FOR STRUCTURAL GENERAL NOTES.
2. SEE SHEET G-004 FOR GENERAL NOTES. AND SYMBOLS.
1. SEE SHEET G-001 AND G-002 FOR DRAWING INDEX.
NOTES:
g2encajw Rectangle g2encajw Callout Amendment #5: Removed requirement to replace existing handrails.