B.08 7N23R0006 BON 1 Lamprey Amendment 3.pdf
PDF 552 KB Posted
- Attached to
- BON Fish Accords Lamprey Bonneville 1
- Solicitation number
- W9127N23R0006
About this file
This is a summary of Amendment 3 to Solicitation W9127N23R0006 issued by the Department of the Army Corps of Engineers Engineering District Portland. The amendment adds a new contract line item for walkway handrails to the solicitation for the BON Fish Accords Lamprey Bonneville 1 project. The walkway handrails item includes all labor, equipment, materials, parts, and incidentals for installation as depicted in the structural drawings. A delivery date of August 23, 2024 and acceptance terms are provided for the new line item, with inspection at destination by the Government and acceptance also at destination. The amendment revises the solicitation schedule of items to include the new walkway handrails contract line item with a total price to be provided by offerors for all contract line items.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see the block 14 continuation page for the purpose of this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N23R0006
X 9B. DATED (SEE ITEM 11)
26-Apr-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-May-2023
CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N23R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 3
The purpose of this amendment is to add contract line item number 0010, Walkway Handrails. The revised Amendment 3 schedule of items is enclosed below. Use the Amendment 3 schedule of items in your proposal submission. The specification section 01 22 00.00 25, Measurement and Payment and site visit attendance sheet are attached.
All other terms and conditions remain unchanged.
BON Fish Accords Lamprey Bonneville 1 Amendment 3 Schedule of Items
Total Price for All Contract Line Items (0001- 0010)
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 Mobilization and Demobilization
1 Job
All plant, equipment, fuel, supplies, materials, and personnel to and from the job site. This Contract Line Item Number (CLIN) applies to the Prime Contractor and all subcontractor mobilization and demobilization.
Funded:
0002 Variable width entrance weir
All labor, equipment, materials, parts, and incidentals for the fabrication and installation of the variable width entrance weir as depicted in the SL series of the Structural drawings.
0003 Counterweight
Slot Modification for the fabrication and installation of counterweight slot modifications as depicted in the SJ series of the Structural drawings.
0004 Lamprey
Bollard Plates for the fabrication and installation of lamprey bollard plates as depicted in the SH series of the Structural drawings.
0005 Lamprey
Passage Flume/Collection Tank
All labor, equipment, materials, and incidentals required for fabrication and delivery of the lamprey passage flume, supports, and lamprey collection tank as depicted in the MH series of the Mechanical
0006 Gravity Fed
Water Supply for the gravity fed water supply system as depicted in the MP series of the Mechanical drawings and the Civil drawing.
0007 Demolition in the Fingerling Passage for demolition and disposal of the existing sluice gate, associated machinery, and wooden stoplogs in the fingerling passage as depicted in the demolition
0008 Fingerling
Passage Concrete Weir for the fingerling passage concrete weir as depicted in the SM series of the Structural drawings.
0009 Lamprey
Passage Trash Rack and Hoist for the lamprey passage trash rack and hoist as depicted in the Structural and Mechanical drawings.
0010 Walkway
Handrails
Measurement will be made as a job for providing all labor, equipment, materials, parts, and incidentals for the walkway handrail installation as depicted in the SF series of the structural drawings.
SECTION 00 10 00 - SOLICITATION
CLIN 0010 is added as follows:
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0010 Walkway
Handrails
Measurement will be made as a job for providing all labor, equipment, materials, parts, and incidentals for the walkway handrail installation as depicted in the SF series of the structural drawings.
The following Delivery Schedule for CLIN 0010 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
23-AUG-2024 1 BONNEVILLE LOCK & DAM PROJECT
MICHELE HAMMEL
USACE PORTLAND DISTRICT
BONNEVILLE LOCK AND D
CASCADE LOCKS OR 97014-0150
(541) 374-3604 FOB: Destination
960412
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0010:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
(End of Summary of Changes)