ESS-24-035 - Steering gear steps.pdf
PDF 7 MB Posted
- Attached to
- FY24 Essayons Overhaul
- Solicitation number
- W9127N23B0013
About this file
This document is a task request form related to installing steps and handrails on the steering gear of a ship. The form details installing two steps on the forward and aft sections of the center support for the steering gear, as well as adding suitable handrails, to provide safe passage when inspecting or maintaining inboard components. The task is requested by Yelaca/Paquet from the USS Essayons and should be completed by May 29, 2023.
The related federal contract opportunity is a solicitation from the Department of the Army Corps of Engineers Engineering District Portland for the FY24 Essayons Overhaul. The solicitation provides an opportunity for contractors to bid on overhaul and repair services for the USS Essayons scheduled for FY2024 but does not include pricing, response dates, or other contract details.
View the file
Other files
Show 40 more
Latest 50 of 181 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-
CONTACT(S) OFFICE TR #
INITIATOR TR DATE
PRIORITY DATE REQUESTED
ROUTING INITIALS SUPERVISORS MASTERS
SYSTEM INFORMATION
SYSTEM
COMPARTMENT LEVEL
SIDE FRAME NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS YES NO PAGES TECH. MANUAL #
ENGINEERING
COORDINATOR DATE
PRIORITY 1 PRIORITY 2 PRIORITY 3
PROJECT ENGINEER DATE JOB ORDER
SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS
ESTIMATED COST COMPLETION DATE
υ ENGINEERING COMMENTS υ
PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL
TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL
| ESS -24-035 steering gear step and hand rail. |
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
| Steering gear 1 with step |
| steering gear step 2. with step |
| Point of Contact: Yelaca/Paquet |
| tr#: ESS-24-035 |
| Paquet/Rolle Chief Engineers: Yelaca |
| Joe Bateman: |
| MM/DD/YY: |
| 1,2,3: 1 |
| SY 15/16: 05-29-23 |
| SYSTEM: Steering Gear. |
| COMPARTMENT: Steering Gear room |
| LEVEL: Upper Deck |
| SIDE: Center |
| FRAME: 166 |
| NOTE: |
| Task Description: Install steps and hand rails to crossover center support of the steering gear. Install 2 steps on the forward and aft sections of the center support. Make steps are easy to remove to assist in the event that new hydraulic piping to be installed. Add suitable hand rails to provide a safe passage over the support. |
| Description of Problem: When inspecting the packing or greasing the steering gear inboard components crossing over the steering gear hydraulic ram support, the high pressure pipes get stepped on. There is no hand rail to grab on when crossing over making daily inspections unsafe. |
| Safety Issues: stepping on top of steering gear hydraulic piping can lead to piping failure or accidental falls. nothing to grab on to cross over. |
| Y: Yes |
| No: Off |
| PAGES: |
| TECH MANUAL: |
| Comments: See atached photo |
| COORDINATOR: |
| DATE: |
| PRIORITY 1: Off |
| PRIORITY 2: Off |
| PRIORITY 3: Off |
| PROJECT ENGINEER: |
| DATE_2: |
| JOB ORDER: |
| ship's force: Off |
| vendor: Off |
| contractor: Off |
| shipyard: Off |
| moorings: Off |
| ESTIMATED COST: |
| COMPLETION DATE: |
| engineering comments: |
| accept: Off |
| more info: Off |
| defer: Off |
| cancel: Off |
| TR RECEIVED FROM VESSEL: |
| TR RETURNED TO VESSEL: |
File details come from the government source that posted it. Updated .