This document contains a task request related to maintenance and repair work aboard the Essayons ship. The task involves removing and relocating chloropac discharge piping and penetration work in the pump room at frame numbers 24-36 on the port and starboard sides. The work requires installing blanks and flanges, relocating piping to a higher waist level above the deck plates, and making the starboard penetration the same elevation as the port side. The safety issues identified relate to the current configuration requiring climbing over 12 feet in the air without handrails to access and perform maintenance on the chloropac flow meter. The task request provides details on the problem, safety issues, and engineering comments for approval.
The related federal contract opportunity is a solicitation from the US Army Corps of Engineers Engineering District Portland for the FY24 Essayons Overhaul. The solicitation number is W9127N23B0013 and seeks products and services to support maintenance and repair work aboard the Essayons ship during the indicated fiscal year, as described in the associated task request document.
View the file
Other files
Show 40 more
Latest 50 of 181 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-
CONTACT(S) OFFICE TR #
INITIATOR TR DATE
PRIORITY DATE REQUESTED
ROUTING INITIALS SUPERVISORS MASTERS
SYSTEM INFORMATION
SYSTEM
COMPARTMENT LEVEL
SIDE FRAME NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS YES NO PAGES TECH. MANUAL #
ENGINEERING
COORDINATOR DATE
PRIORITY 1 PRIORITY 2 PRIORITY 3
PROJECT ENGINEER DATE JOB ORDER
SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS
ESTIMATED COST COMPLETION DATE
υ ENGINEERING COMMENTS υ
PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL
TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL
Port side aft to fwd g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X
Port side fwd to aft
Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text
MOVE CL PIPING TO
GREEN LINE
g2odndmp Line g2odndmp Line
Polygonal Line
Stbd side aft to fwd
Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Line g2odndmp Line
Polygonal Line
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
| ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf |
| ESS-15-083 - ICMS-Wonderware Corrections |
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
Wonderware Task Request support doc 2014
| Paquet/Rolle Chief Engineers: PAQUET | |
| Joe Bateman: | |
| SY 15/16: M&R 2023-24 | |
| Point of Contact: PAQUET/YELACA | |
| tr#: ESS-24-027 | |
| MM/DD/YY: 05/21/23 | |
| 1,2,3: 1 | |
| SYSTEM: CHLOROPAC DISCHARGE PIPING | |
| COMPARTMENT: PUMP ROOM | |
| LEVEL: 12'-9" | |
| SIDE: P/S | |
| FRAME: 24-36 | |
| NOTE: | |
| Task Description: REMOVE DEAD ENDED SECTIONS OF INBD DP COOLING AS IDENTIFIED BY X; INSTALL BLANKS W/GASKETSAT AT RED ARROW LOCATIONS; INSTALL NEW WELDED FLANGES AS NECESSARY. RELOCATE CHLOROPAC DISCHARGE PIPNG SO IT IS AT WAIST LEVEL ABOVE DECK PLATES (GREEN LINE). RELOCATE STBD BLKHD PENETRATION SO IT IS THE SAME ELEVATION AS THE PORT. | |
| Description of Problem: CHLOROPAC FLOW METER REQUIRES CLEANING/MAINTENANCE. ACCESS REQUIRES CLIMBING ON TOP OF INBD DP, REQUIRES WORKING OVER 12' IN THE AIR NO HANDRAILS, SAFE ACCESS TO PERFORM TASK. INSTALL PROPER CLOROPAC PIPING SUPPORTS ALONG BULKHEAD. | |
| Safety Issues: | |
| Y: Off | |
| No: Off | |
| PAGES: | |
| TECH MANUAL: | |
| Comments: | |
| COORDINATOR: | |
| DATE: | |
| PRIORITY 1: Off | |
| PRIORITY 2: Off | |
| PRIORITY 3: Off | |
| PROJECT ENGINEER: | |
| DATE_2: | |
| JOB ORDER: | |
| ship's force: Off | |
| vendor: Off | |
| contractor: Off | |
| shipyard: Off | |
| moorings: Off | |
| ESTIMATED COST: | |
| COMPLETION DATE: | |
| engineering comments: | |
| accept: Off | |
| more info: Off | |
| defer: Off | |
| cancel: Off | |
| TR RECEIVED FROM VESSEL: | |
| TR RETURNED TO VESSEL: | |
| 2023-05-26T10:55:33-0700 | |
| DMP |
File details come from the government source that posted it. Updated .