This document contains a task request related to maintenance and repair work aboard the Essayons ship. The task involves removing and relocating chloropac discharge piping and penetration work in the pump room at frame numbers 24-36 on the port and starboard sides. The work requires installing blanks and flanges, relocating piping to a higher waist level above the deck plates, and making the starboard penetration the same elevation as the port side. The safety issues identified relate to the current configuration requiring climbing over 12 feet in the air without handrails to access and perform maintenance on the chloropac flow meter. The task request provides details on the problem, safety issues, and engineering comments for approval.

The related federal contract opportunity is a solicitation from the US Army Corps of Engineers Engineering District Portland for the FY24 Essayons Overhaul. The solicitation number is W9127N23B0013 and seeks products and services to support maintenance and repair work aboard the Essayons ship during the indicated fiscal year, as described in the associated task request document.

View the file

Other files

File Type Posted
C.04_FormalAbstractOfOffers7N23B0013_signed.pdf PDF
C.04_BidRoster7N23B0013.pdf PDF
Projnet Questions Closed Responses.pdf PDF
DDG Exhaust Drawings.pdf PDF
Propulsion Exhaust Drawings.pdf PDF
SSDG Exaust Drawings.pdf PDF
D581015.pdf PDF
681-0905-305 Combined.pdf PDF
Corps of Engineers IAC-GVA submittal 51023.pdf PDF
70.010-4411-942 Rev C.pdf PDF
70010 5109-905 Rev A.pdf PDF
70.010-4411-942 (1 of 2).pdf PDF
E-2240-1 PROPELLER SHAFT ROPE GUARD 1.pdf PDF
Jastram O and M Manual Pg 41.pdf PDF
423472_2.pdf PDF
NPDS3500H_Technical_description.pdf PDF
Jastram O and M Manual Pgs 21-22.pdf PDF
681-0797-201 Combined.pdf PDF
681-0713-101 Rev 2 (1 of 1).pdf PDF
B.08 W9127N23B0013 0002(Amend).pdf PDF
70.010-4411-941.pdf PDF
Haley Manual.pdf PDF
70.010-4411-942 (2 of 2).pdf PDF
Aurora 413 Cut Sheet.pdf PDF
D201049C.pdf PDF
Aurora 400 Series Split Case Pump - Manual.pdf PDF
423472.pdf PDF
70.010-4411-942 Rev B.pdf PDF
E-1720-28 Model (1).pdf PDF
NPDS 3500H Harding Technical Data Sheet.pdf PDF
Essyons C18 Radiator VM19F.pdf PDF
70.010-5109-907-1A.pdf PDF
681-0919-301 Rev 7 (2 of 2).pdf PDF
681-0919-301 Rev 6 (2 of 2).pdf PDF
681-879-204 Combined.pdf PDF
70010-27 43-904.pdf PDF
70010-27 43-904 rev C (1 of 2).pdf PDF
70010-27 43-904 rev C (2 of 2).pdf PDF
681-0919-301 Rev 7 (1 of 2).pdf PDF
70010-2725-915 Rev A (1 of 1).pdf PDF
681-0919-301 Rev 6 (1 of 2).pdf PDF
70010-27 43-904 rev B (2 of 2).pdf PDF
70010-27 43-904 rev B (1 of 2).pdf PDF
ESS-24-024 - INBD CW PUMP XOVER (HYD COOLING).pdf PDF
681-0914-301-2 Rev 3 (1 of 1).pdf PDF
681-0919-201-3 Rev 2 (1 of 1).pdf PDF
Switchboard Circuit Breakers.pdf PDF
ESS-24-023 - CHLOROPAC BLKHD PENETRATION .pdf PDF
681-0700-155 Rev 2 (1 of 1).pdf PDF
ESS-24-035 - Steering gear steps.pdf PDF
Show 40 more

Latest 50 of 181 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-

CONTACT(S) OFFICE TR #

INITIATOR TR DATE

PRIORITY DATE REQUESTED

ROUTING INITIALS SUPERVISORS MASTERS

SYSTEM INFORMATION

SYSTEM

COMPARTMENT LEVEL

SIDE FRAME NOTE

DESCRIPTION OF TASK

DESCRIPTION OF PROBLEM

SAFETY ISSUES

ATTACHMENTS YES NO PAGES TECH. MANUAL #

ENGINEERING

COORDINATOR DATE

PRIORITY 1 PRIORITY 2 PRIORITY 3

PROJECT ENGINEER DATE JOB ORDER

SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS

ESTIMATED COST COMPLETION DATE

υ ENGINEERING COMMENTS υ

PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL

TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL

Port side aft to fwd g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X

Port side fwd to aft

Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text

MOVE CL PIPING TO

GREEN LINE

g2odndmp Line g2odndmp Line

Polygonal Line

Stbd side aft to fwd

Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Typewritten Text X g2odndmp Line g2odndmp Line

Polygonal Line

SHIPS TR #
CONTACT(S)
TASK REQUEST - ESSAYONS
OFFICE TR #
INITIATOR
TR DATE
PRIORITY
DATE REQUESTED
MASTERS
SUPERVISORS
ROUTING INITIALS
SYSTEM INFORMATION
NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS
YES NO
PAGES
TECH. MANUAL #
ENGINEERING
COORDINATOR
DATE
PRIORITY 1
PRIORITY 2
PRIORITY 3
PROJECT ENGINEER
DATE
JOB ORDER
ESTIMATED COST
COMPLETION DATE
( ENGINEERING COMMENTS (
PROPOSAL / ACTION / DIRECTION
TR RECEIVED FROM VESSEL
TR RETURNED TO VESSEL
ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf
ESS-15-083 - ICMS-Wonderware Corrections
SHIPS TR #
CONTACT(S)
TASK REQUEST - ESSAYONS
OFFICE TR #
INITIATOR
TR DATE
PRIORITY
DATE REQUESTED
MASTERS
SUPERVISORS
ROUTING INITIALS
SYSTEM INFORMATION
NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS
YES NO
PAGES
TECH. MANUAL #
ENGINEERING
COORDINATOR
DATE
PRIORITY 1
PRIORITY 2
PRIORITY 3
PROJECT ENGINEER
DATE
JOB ORDER
ESTIMATED COST
COMPLETION DATE
( ENGINEERING COMMENTS (
PROPOSAL / ACTION / DIRECTION
TR RECEIVED FROM VESSEL
TR RETURNED TO VESSEL

Wonderware Task Request support doc 2014

Paquet/Rolle Chief Engineers: PAQUET
Joe Bateman:
SY 15/16: M&R 2023-24
Point of Contact: PAQUET/YELACA
tr#: ESS-24-027
MM/DD/YY: 05/21/23
1,2,3: 1
SYSTEM: CHLOROPAC DISCHARGE PIPING
COMPARTMENT: PUMP ROOM
LEVEL: 12'-9"
SIDE: P/S
FRAME: 24-36
NOTE:
Task Description: REMOVE DEAD ENDED SECTIONS OF INBD DP COOLING AS IDENTIFIED BY X; INSTALL BLANKS W/GASKETSAT AT RED ARROW LOCATIONS; INSTALL NEW WELDED FLANGES AS NECESSARY. RELOCATE CHLOROPAC DISCHARGE PIPNG SO IT IS AT WAIST LEVEL ABOVE DECK PLATES (GREEN LINE). RELOCATE STBD BLKHD PENETRATION SO IT IS THE SAME ELEVATION AS THE PORT.
Description of Problem: CHLOROPAC FLOW METER REQUIRES CLEANING/MAINTENANCE. ACCESS REQUIRES CLIMBING ON TOP OF INBD DP, REQUIRES WORKING OVER 12' IN THE AIR NO HANDRAILS, SAFE ACCESS TO PERFORM TASK. INSTALL PROPER CLOROPAC PIPING SUPPORTS ALONG BULKHEAD.
Safety Issues:
Y: Off
No: Off
PAGES:
TECH MANUAL:
Comments:
COORDINATOR:
DATE:
PRIORITY 1: Off
PRIORITY 2: Off
PRIORITY 3: Off
PROJECT ENGINEER:
DATE_2:
JOB ORDER:
ship's force: Off
vendor: Off
contractor: Off
shipyard: Off
moorings: Off
ESTIMATED COST:
COMPLETION DATE:
engineering comments:
accept: Off
more info: Off
defer: Off
cancel: Off
TR RECEIVED FROM VESSEL:
TR RETURNED TO VESSEL:
2023-05-26T10:55:33-0700
DMP

File details come from the government source that posted it. Updated .