ESS-24-023 - CHLOROPAC BLKHD PENETRATION .pdf
PDF 2 MB Posted
- Attached to
- FY24 Essayons Overhaul
- Solicitation number
- W9127N23B0013
About this file
This document contains a technical request form for repair work aboard the Essayons ship. The form details a request to renew chloropac piping from the pump room to the nearest flange in the #1 upper void, including installation of a bulkhead doubler and penetration. The problem is described as metalurgicial deterioration. The safety issues field is marked yes and the request includes no attachments. The engineering coordinator, project engineer and estimated completion date fields are blank. The engineering comments field is marked to accept the request. The document also includes details of a related solicitation by the Department of the Army Corps of Engineers Engineering District Portland for FY24 overhaul work aboard Essayons under solicitation number W9127N23B0013.
View the file
Other files
Show 40 more
Latest 50 of 181 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-
CONTACT(S) OFFICE TR #
INITIATOR TR DATE
PRIORITY DATE REQUESTED
ROUTING INITIALS SUPERVISORS MASTERS
SYSTEM INFORMATION
SYSTEM
COMPARTMENT LEVEL
SIDE FRAME NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS YES NO PAGES TECH. MANUAL #
ENGINEERING
COORDINATOR DATE
PRIORITY 1 PRIORITY 2 PRIORITY 3
PROJECT ENGINEER DATE JOB ORDER
SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS
ESTIMATED COST COMPLETION DATE
υ ENGINEERING COMMENTS υ
PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL
TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL
g2odndmp Typewritten Text FROM THIS CPVC FLANGEY, RENEW METALLIC FLANGE, PIPING, AND DOUBLER UP TO FIRST FLANGE IN #1 U VOID.
DO NOT MAKE ANOTHER BATTERY. USE MILD STEEL.
g2odndmp Line
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
| ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf |
| ESS-15-083 - ICMS-Wonderware Corrections |
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
Wonderware Task Request support doc 2014
| Paquet/Rolle Chief Engineers: PAQUET | |
| Joe Bateman: | |
| SY 15/16: M&R 2023-24 | |
| Point of Contact: PAQUET/YELACA | |
| tr#: ESS-24-023 | |
| MM/DD/YY: 05/20/23 | |
| 1,2,3: 1 | |
| SYSTEM: CHLOROPAC SW TREATMENT | |
| COMPARTMENT: P/R - #1U VOID | |
| LEVEL: HOLD | |
| SIDE: P/S | |
| FRAME: 30 | |
| NOTE: | |
| Task Description: RENEW CHLOROPAC PIPING FROM PUMP ROOM CPVC FLANGE TO NEAREST FLANGE IN THE #1 U VOID. THIS INCLUDES INSTALLATION OF BULKHEAD DOUBLER/PENETRATION. | |
| Description of Problem: ANOTHER PRIME EXAMPLE OF METALURGICAL NOBILITY AT WORK. | |
| Safety Issues: | |
| Y: Off | |
| No: Off | |
| PAGES: | |
| TECH MANUAL: | |
| Comments: | |
| COORDINATOR: | |
| DATE: | |
| PRIORITY 1: Off | |
| PRIORITY 2: Off | |
| PRIORITY 3: Off | |
| PROJECT ENGINEER: | |
| DATE_2: | |
| JOB ORDER: | |
| ship's force: Off | |
| vendor: Off | |
| contractor: Off | |
| shipyard: Off | |
| moorings: Off | |
| ESTIMATED COST: | |
| COMPLETION DATE: | |
| engineering comments: | |
| accept: Off | |
| more info: Off | |
| defer: Off | |
| cancel: Off | |
| TR RECEIVED FROM VESSEL: | |
| TR RETURNED TO VESSEL: | |
| 2023-05-20T16:55:18-0700 | |
| DMP |
File details come from the government source that posted it. Updated .