ESS-24-024 - INBD CW PUMP XOVER (HYD COOLING).pdf
PDF 367 KB Posted
- Attached to
- FY24 Essayons Overhaul
- Solicitation number
- W9127N23B0013
About this file
This document contains a task request form and information on a related federal contract opportunity. The task request form details a needed repair to restore the discharge cross connect line between the port and starboard inboard cooling water pumps on the USS Essayons, including installing isolation valves as necessary. The opportunity is for FY24 overhaul work on the USS Essayons, solicited by the Department of the Army Corps of Engineers Engineering District Portland under solicitation number W9127N23B0013. The estimated cost and completion date for the pump line repair are listed on the task request form.
View the file
Other files
Show 40 more
Latest 50 of 181 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-
CONTACT(S) OFFICE TR #
INITIATOR TR DATE
PRIORITY DATE REQUESTED
ROUTING INITIALS SUPERVISORS MASTERS
SYSTEM INFORMATION
SYSTEM
COMPARTMENT LEVEL
SIDE FRAME NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS YES NO PAGES TECH. MANUAL #
ENGINEERING
COORDINATOR DATE
PRIORITY 1 PRIORITY 2 PRIORITY 3
PROJECT ENGINEER DATE JOB ORDER
SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS
ESTIMATED COST COMPLETION DATE
υ ENGINEERING COMMENTS υ
PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL
TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
| ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf |
| ESS-15-083 - ICMS-Wonderware Corrections |
| SHIPS TR # |
| CONTACT(S) |
| TASK REQUEST - ESSAYONS |
| OFFICE TR # |
| INITIATOR |
| TR DATE |
| PRIORITY |
| DATE REQUESTED |
| MASTERS |
| SUPERVISORS |
| ROUTING INITIALS |
| SYSTEM INFORMATION |
| NOTE |
| DESCRIPTION OF TASK |
| DESCRIPTION OF PROBLEM |
| SAFETY ISSUES |
| ATTACHMENTS |
| YES NO |
| PAGES |
| TECH. MANUAL # |
| ENGINEERING |
| COORDINATOR |
| DATE |
| PRIORITY 1 |
| PRIORITY 2 |
| PRIORITY 3 |
| PROJECT ENGINEER |
| DATE |
| JOB ORDER |
| ESTIMATED COST |
| COMPLETION DATE |
| ( ENGINEERING COMMENTS ( |
| PROPOSAL / ACTION / DIRECTION |
| TR RECEIVED FROM VESSEL |
| TR RETURNED TO VESSEL |
Wonderware Task Request support doc 2014
| Paquet/Rolle Chief Engineers: PAQUET | |
| Joe Bateman: | |
| SY 15/16: M&R 2023-24 | |
| Point of Contact: PAQUET/YELACA | |
| tr#: ESS-24-024 | |
| MM/DD/YY: | |
| 1,2,3: 1 | |
| SYSTEM: INBD COOLING (HYD SKID) | |
| COMPARTMENT: PUMP ROOM | |
| LEVEL: 12'-9" | |
| SIDE: P/C/S | |
| FRAME: 24 | |
| NOTE: | |
| Task Description: RESTORE DISCHARGE CROSS CONNECT LINE BETWEEN THE PORT AND STARBOARD INBOARD COOLING WATER PUMPS. INSTALL ISOLATION VALVES AS NECESARY. | |
| Description of Problem: CROSS CONNECT LINE WAS REMOVED DURING INSTALLATION OF THE NEW STYLE MAIN SW COOLING PUMPS. | |
| Safety Issues: SIRI ASKING ALEXA DIRECTIONS TO 7ELEVEn | |
| Y: Off | |
| No: Off | |
| PAGES: | |
| TECH MANUAL: | |
| Comments: | |
| COORDINATOR: | |
| DATE: | |
| PRIORITY 1: Off | |
| PRIORITY 2: Off | |
| PRIORITY 3: Off | |
| PROJECT ENGINEER: | |
| DATE_2: | |
| JOB ORDER: | |
| ship's force: Off | |
| vendor: Off | |
| contractor: Off | |
| shipyard: Off | |
| moorings: Off | |
| ESTIMATED COST: | |
| COMPLETION DATE: | |
| engineering comments: | |
| accept: Off | |
| more info: Off | |
| defer: Off | |
| cancel: Off | |
| TR RECEIVED FROM VESSEL: | |
| TR RETURNED TO VESSEL: | |
| 2023-05-20T16:34:01-0700 | |
| DMP |
File details come from the government source that posted it. Updated .