ESS-24-024 - INBD CW PUMP XOVER (HYD COOLING).pdf

PDF 367 KB Posted

Attached to
FY24 Essayons Overhaul
Solicitation number
W9127N23B0013
Issued by

About this file

This document contains a task request form and information on a related federal contract opportunity. The task request form details a needed repair to restore the discharge cross connect line between the port and starboard inboard cooling water pumps on the USS Essayons, including installing isolation valves as necessary. The opportunity is for FY24 overhaul work on the USS Essayons, solicited by the Department of the Army Corps of Engineers Engineering District Portland under solicitation number W9127N23B0013. The estimated cost and completion date for the pump line repair are listed on the task request form.

View the file

Other files

File Type Posted
C.04_FormalAbstractOfOffers7N23B0013_signed.pdf PDF
C.04_BidRoster7N23B0013.pdf PDF
Projnet Questions Closed Responses.pdf PDF
DDG Exhaust Drawings.pdf PDF
Propulsion Exhaust Drawings.pdf PDF
SSDG Exaust Drawings.pdf PDF
D581015.pdf PDF
681-0905-305 Combined.pdf PDF
Corps of Engineers IAC-GVA submittal 51023.pdf PDF
70.010-4411-942 Rev C.pdf PDF
70010 5109-905 Rev A.pdf PDF
70.010-4411-942 (1 of 2).pdf PDF
E-2240-1 PROPELLER SHAFT ROPE GUARD 1.pdf PDF
Jastram O and M Manual Pg 41.pdf PDF
423472_2.pdf PDF
NPDS3500H_Technical_description.pdf PDF
Jastram O and M Manual Pgs 21-22.pdf PDF
681-0797-201 Combined.pdf PDF
681-0713-101 Rev 2 (1 of 1).pdf PDF
B.08 W9127N23B0013 0002(Amend).pdf PDF
70.010-4411-941.pdf PDF
Haley Manual.pdf PDF
70.010-4411-942 (2 of 2).pdf PDF
Aurora 413 Cut Sheet.pdf PDF
D201049C.pdf PDF
Aurora 400 Series Split Case Pump - Manual.pdf PDF
423472.pdf PDF
70.010-4411-942 Rev B.pdf PDF
E-1720-28 Model (1).pdf PDF
NPDS 3500H Harding Technical Data Sheet.pdf PDF
Essyons C18 Radiator VM19F.pdf PDF
70.010-5109-907-1A.pdf PDF
681-0919-301 Rev 7 (2 of 2).pdf PDF
681-0919-301 Rev 6 (2 of 2).pdf PDF
681-879-204 Combined.pdf PDF
70010-27 43-904.pdf PDF
70010-27 43-904 rev C (1 of 2).pdf PDF
70010-27 43-904 rev C (2 of 2).pdf PDF
681-0919-301 Rev 7 (1 of 2).pdf PDF
70010-2725-915 Rev A (1 of 1).pdf PDF
681-0919-301 Rev 6 (1 of 2).pdf PDF
70010-27 43-904 rev B (2 of 2).pdf PDF
70010-27 43-904 rev B (1 of 2).pdf PDF
ESS-24-027 - CHLOROPAC DIS PP RELOCATION.pdf PDF
681-0914-301-2 Rev 3 (1 of 1).pdf PDF
681-0919-201-3 Rev 2 (1 of 1).pdf PDF
Switchboard Circuit Breakers.pdf PDF
ESS-24-023 - CHLOROPAC BLKHD PENETRATION .pdf PDF
681-0700-155 Rev 2 (1 of 1).pdf PDF
ESS-24-035 - Steering gear steps.pdf PDF
Show 40 more

Latest 50 of 181 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK REQUEST - ESSAYONS SHIPS TR # ESS -11-

CONTACT(S) OFFICE TR #

INITIATOR TR DATE

PRIORITY DATE REQUESTED

ROUTING INITIALS SUPERVISORS MASTERS

SYSTEM INFORMATION

SYSTEM

COMPARTMENT LEVEL

SIDE FRAME NOTE

DESCRIPTION OF TASK

DESCRIPTION OF PROBLEM

SAFETY ISSUES

ATTACHMENTS YES NO PAGES TECH. MANUAL #

ENGINEERING

COORDINATOR DATE

PRIORITY 1 PRIORITY 2 PRIORITY 3

PROJECT ENGINEER DATE JOB ORDER

SHIP’S FORCE VENDOR CONTRACTOR SHIPYARD MOORINGS

ESTIMATED COST COMPLETION DATE

υ ENGINEERING COMMENTS υ

PROPOSAL / ACTION / DIRECTION ACCEPT MORE INFO NEEDED DEFER CANCEL

TR RECEIVED FROM VESSEL TR RETURNED TO VESSEL

SHIPS TR #
CONTACT(S)
TASK REQUEST - ESSAYONS
OFFICE TR #
INITIATOR
TR DATE
PRIORITY
DATE REQUESTED
MASTERS
SUPERVISORS
ROUTING INITIALS
SYSTEM INFORMATION
NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS
YES NO
PAGES
TECH. MANUAL #
ENGINEERING
COORDINATOR
DATE
PRIORITY 1
PRIORITY 2
PRIORITY 3
PROJECT ENGINEER
DATE
JOB ORDER
ESTIMATED COST
COMPLETION DATE
( ENGINEERING COMMENTS (
PROPOSAL / ACTION / DIRECTION
TR RECEIVED FROM VESSEL
TR RETURNED TO VESSEL
ESS-15-083 - ICMS-Wonderware CorrectionsJOH.pdf
ESS-15-083 - ICMS-Wonderware Corrections
SHIPS TR #
CONTACT(S)
TASK REQUEST - ESSAYONS
OFFICE TR #
INITIATOR
TR DATE
PRIORITY
DATE REQUESTED
MASTERS
SUPERVISORS
ROUTING INITIALS
SYSTEM INFORMATION
NOTE
DESCRIPTION OF TASK
DESCRIPTION OF PROBLEM
SAFETY ISSUES
ATTACHMENTS
YES NO
PAGES
TECH. MANUAL #
ENGINEERING
COORDINATOR
DATE
PRIORITY 1
PRIORITY 2
PRIORITY 3
PROJECT ENGINEER
DATE
JOB ORDER
ESTIMATED COST
COMPLETION DATE
( ENGINEERING COMMENTS (
PROPOSAL / ACTION / DIRECTION
TR RECEIVED FROM VESSEL
TR RETURNED TO VESSEL

Wonderware Task Request support doc 2014

Paquet/Rolle Chief Engineers: PAQUET
Joe Bateman:
SY 15/16: M&R 2023-24
Point of Contact: PAQUET/YELACA
tr#: ESS-24-024
MM/DD/YY:
1,2,3: 1
SYSTEM: INBD COOLING (HYD SKID)
COMPARTMENT: PUMP ROOM
LEVEL: 12'-9"
SIDE: P/C/S
FRAME: 24
NOTE:
Task Description: RESTORE DISCHARGE CROSS CONNECT LINE BETWEEN THE PORT AND STARBOARD INBOARD COOLING WATER PUMPS. INSTALL ISOLATION VALVES AS NECESARY.
Description of Problem: CROSS CONNECT LINE WAS REMOVED DURING INSTALLATION OF THE NEW STYLE MAIN SW COOLING PUMPS.
Safety Issues: SIRI ASKING ALEXA DIRECTIONS TO 7ELEVEn
Y: Off
No: Off
PAGES:
TECH MANUAL:
Comments:
COORDINATOR:
DATE:
PRIORITY 1: Off
PRIORITY 2: Off
PRIORITY 3: Off
PROJECT ENGINEER:
DATE_2:
JOB ORDER:
ship's force: Off
vendor: Off
contractor: Off
shipyard: Off
moorings: Off
ESTIMATED COST:
COMPLETION DATE:
engineering comments:
accept: Off
more info: Off
defer: Off
cancel: Off
TR RECEIVED FROM VESSEL:
TR RETURNED TO VESSEL:
2023-05-20T16:34:01-0700
DMP

File details come from the government source that posted it. Updated .