This document contains a solicitation for maintenance dredging services at six locations across Oregon and Washington, as well as an abstract of offers received in response. The U.S. Army Corps of Engineers, Portland District, is seeking a contractor to perform clamshell dredging and materials placement at sites in Port Orford and Winchester Bay, Oregon; Depot Slough and Astoria, Oregon; and Baker Bay and Longview, Washington. The scope of work includes supervision, engineering, labor, materials, and equipment. The bid period closed on June 22, 2023, with a magnitude of construction between $5-10 million. Four offerors submitted bids as shown in the abstract. Mandatory and optional line items were priced for dredging and placement quantities at each location. Evaluation will consider total price as well as acceptance period. The point of contact for inquiries is the USACE-NWP Contracting Office.

View the file

Other files for this federal contract opportunity

Other files attached to Oregon/Washington Clamshell Maintenance Dredging 2023, newest first.
File Type Posted
W9127N23B0011 Abstract OWCM23.pdf PDF
W9127N23B0011 OWCM23 Amendment 0003.pdf PDF
W9127N23B0011 OWCM23 Amendment 0002.pdf PDF
W9127N23B0011 OWCM23_ADVERTISE_Amendment 0002_PLANS.pdf PDF
W9127N23B0011 OWCM23 Amendment 0001.pdf PDF
Wage Determination OR20230081.pdf PDF
Wage Determination WA20230080.pdf PDF
W9127N23B0011_OWCM23_ADVERTISE_PLANS.pdf PDF
W9127N23B0011_OWCMD23_ADV_Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED

5/23/2023

4. ISSUING OFFICE

DISTRICT ENGINEER

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE

(CHECK A, B, OR C AND COMPLETE

D, E, AND F.) A. OFFEROR B. OFFEROR B. OFFEROR

X A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY B. BID SECURITY B. BID SECURITY

(WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED

(INCLUDING PROFIT) YES YES YES

6. NUMBER OF ADDENDA ISSUED

7A.

ITEM E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

MANDATORY CLINS

0001 Mobilization and Demobilization 1 JOB 1,168,000.00$ 1,168,000.00$ 695,000.00$ 695,000.00$ 1,625,000.00$ 1,625,000.00$ 3,500,000.00$ 3,500,000.00$ 0002 Dredge/Placement Materials: Port Orford 0002AA First 11,000 CY 11,000 CY 11.90$ 130,900.00$ 9.00$ 99,000.00$ 10.50$ 115,500.00$ 25.00$ 275,000.00$ 0002AB Above 11,000 CY 8,000 CY 11.10$ 88,800.00$ 9.00$ 72,000.00$ 9.00$ 72,000.00$ 25.00$ 200,000.00$ 0003 Dredge/Placement Materials: Winchester Bay 0003AA First 17,000 CY 17,000 CY 12.30$ 209,100.00$ 11.00$ 187,000.00$ 27.00$ 459,000.00$ 15.00$ 255,000.00$ 0003AB Above 17,000 CY 9,000 CY 15.50$ 139,500.00$ 11.00$ 99,000.00$ 24.00$ 216,000.00$ 15.00$ 135,000.00$ 0006 Dredging/Placement of Materials: Baker Bay, RM 00+10+00 to

01+50+00 0006AA First 40,000 CY 40,000 CY 10.60$ 424,000.00$ 8.25$ 330,000.00$ 23.00$ 920,000.00$ 10.00$ 400,000.00$ 0006AB Above 40,000 CY 30,000 CY 9.00$ 270,000.00$ 8.25$ 247,500.00$ 20.00$ 600,000.00$ 10.00$ 300,000.00$ 0008 Dredging/Placement of Materials: Astoria Turning Basin 0008AA First 20,000 CY 20,000 CY 13.80$ 276,000.00$ 5.50$ 110,000.00$ 30.00$ 600,000.00$ 10.00$ 200,000.00$ 0008AB Above 20,000 CY 12,000 CY 12.70$ 152,400.00$ 5.50$ 66,000.00$ 25.00$ 300,000.00$ 10.00$ 120,000.00$ 0009 Dredging/Placement of Materials: Longview Turning Basin 0009AA First 2,000 CY 2,000 CY 19.10$ 38,200.00$ 13.50$ 27,000.00$ 30.00$ 60,000.00$ 20.00$ 40,000.00$ 0009AB Above 2,000 CY 2,000 CY 18.00$ 36,000.00$ 13.50$ 27,000.00$ 25.00$ 50,000.00$ 20.00$ 40,000.00$ 0011 Mobilization and Demobilization of Grizzly Screens 1 JOB 14,000.00$ 14,000.00$ 125,000.00$ 125,000.00$ 25,000.00$ 25,000.00$ 100,000.00$ 100,000.00$ 0012 Dredging/Placement of Materials: Transfer Site W-60.9-IW 0012AA First 110,000 CY 110,000 CY 27.10$ 2,981,000.00$ 9.50$ 1,045,000.00$ 19.50$ 2,145,000.00$ 16.00$ 1,760,000.00$ 0012AB Above 110,000 CY 22,000 CY 22.20$ 488,400.00$ 9.50$ 209,000.00$ 17.00$ 374,000.00$ 16.00$ 352,000.00$ 0015 Dredging/Placement of Materials: Transfer Site W-60.9-IW 0015AA First 10 Tons 10 LONG

TON

2,014.00$ 20,140.00$ 1,200.00$ 12,000.00$ 375.00$ 3,750.00$ 1,000.00$ 10,000.00$

0015AB Above 10 Tons 10 LONG

TON

942.00$ 9,420.00$ 1,200.00$ 12,000.00$ 375.00$ 3,750.00$ 1,000.00$ 10,000.00$

SUBTOTAL FOR MANDATORY LINE ITEMS 6,445,860.00$ 3,362,500.00$ 7,569,000.00$ 7,697,000.00$

OPTIONAL CLINS

0004 Incremental Moblization Depot Slough 1 JOB 168,000.00$ 168,000.00$ 100,000.00$ 100,000.00$ 300,000.00$ 300,000.00$ 1,000,000.00$ 1,000,000.00$ 0005 Dredging/Placement of Materials: Depot Slough 0005AA First 30,000 CY 30,000 CY 18.20$ 546,000.00$ 13.25$ 397,500.00$ 25.00$ 750,000.00$ 15.00$ 450,000.00$ 0005AB Above 30,000 CY 25,000 CY 17.00$ 425,000.00$ 13.25$ 331,250.00$ 22.00$ 550,000.00$ 15.00$ 375,000.00$ 0007 Dredging/Placement of Materials: Baker Bay, RM 01+50+00 to

03+10+00 0007AA First 5,000 CY 5,000 CY 8.90$ 44,500.00$ 8.25$ 41,250.00$ 23.00$ 115,000.00$ 10.00$ 50,000.00$ 0007AB Above 5,000 CY 7,000 CY 5.60$ 39,200.00$ 8.25$ 57,750.00$ 20.00$ 140,000.00$ 10.00$ 70,000.00$ 0010 Dredging/Placement of Materials: Port of Longview 0010AA First 7,000 CY 7,000 CY 32.00$ 224,000.00$ 13.50$ 94,500.00$ 30.00$ 210,000.00$ 20.00$ 140,000.00$ 0010AB Above 7,000 CY 6,000 CY 13.60$ 81,600.00$ 13.50$ 81,000.00$ 25.00$ 150,000.00$ 20.00$ 120,000.00$ 0013 Dredging/Placement of Materials: Transfer Site W-60.9-IW 0013AA First 23,000 CY 23,000 CY 28.40$ 653,200.00$ 6.50$ 149,500.00$ 19.50$ 448,500.00$ 16.00$ 368,000.00$ 0013AB Above 23,000 CY 9,000 CY 21.00$ 189,000.00$ 6.50$ 58,500.00$ 17.00$ 153,000.00$ 16.00$ 144,000.00$ 0014 Dredging/Placement of Materials: Transfer Site W-60.9-IW 0014AA First 10,000 CY 10,000 CY 33.9 339,000.00$ 6.50$ 65,000.00$ 19.50$ 195,000.00$ 16.00$ 160,000.00$ 0014AB Above 10,000 CY 6,000 CY 23.70$ 142,200.00$ 6.50$ 39,000.00$ 17.00$ 102,000.00$ 16.00$ 96,000.00$ 0016 Remote Video Monitoring System 1 JOB 29,000.00$ 29,000.00$ 4,000.00$ 4,000.00$ 30,000.00$ 30,000.00$ 15,000.00$ 15,000.00$ 0017 Dredging/Placement of Materials: Old Mouth Cowlitz 0017AA First 6,000 CY 6,000 CY 12.00$ 72,000.00$ 5.75$ 34,500.00$ 27.00$ 162,000.00$ 15.00$ 90,000.00$ 0017AB Above 6,000 VY 2,000 CY 11.40$ 22,800.00$ 5.75$ 11,500.00$ 24.00$ 48,000.00$ 15.00$ 30,000.00$

SUBTOTAL FOR OPTIONAL LINE ITEMS 2,880,700.00$ 1,465,250.00$ 3,353,500.00$ 3,108,000.00$

9,326,560.00$ 4,827,750.00$ 10,922,500.00$ 10,805,000.00$

NSN 7540-01-150-0981 STANDARD FORM 1419 (10-3)

Camenzind Dutra JV LLC 792 Montrose Ave Palo Alto, CA 94303 91G72

NO.2NO.1

Oregon and Washington Clamshell Maintenance Dredging 2023

7B. DESCRIPTION OF OFFERED ITEM D.

TOTAL

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

HME Construction, Inc.

6801 NW Old Lower River Rd Vancouver, WA 98660 1KNC1

ABSTRACT OF OFFERS 1. SOLICITATION NO.

W9127N23B0011

3. DATE OPENED

6/22/2023 1 OF 1

PAGE

American Construction Co., Inc 1501 Taylor Way Tacoma, WA 98421 0E2Z8

IGE

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

9. OFFERS

NO.3

2023-06-22T12:49:04-0700
FLORES.KRISTEL.MADARIAGA.1280597402
2023-06-22T12:53:01-0700
SMOTHERS.ANDREA.KATHERINE.1243096681

File details come from the government source that posted it. Updated .