This document contains a solicitation for maintenance dredging services at six locations in Oregon and Washington, as well as the corresponding abstract of offers received. The U.S. Army Corps of Engineers, Portland District, is seeking a contractor to perform clamshell dredging at Port Orford and Winchester Bay in Oregon, Depot Slough in Oregon, Astoria in Oregon, Baker Bay in Washington, and Longview in Washington. The scope of work includes supervision, engineering, labor, materials, and equipment to complete the dredging. The solicitation includes mandatory and optional line items for estimated quantities and unit prices at each location. The bid opening was June 22, 2023. Three offers were received as shown on the abstract of offers. The magnitude of construction is estimated between $5 million and $10 million. Inquiries shall be directed to the USACE-NWP Contracting Office points of contact via email.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127N23B0011 OWCM23 Abstract.pdf | ||
| W9127N23B0011 OWCM23 Amendment 0003.pdf | ||
| W9127N23B0011 OWCM23_ADVERTISE_Amendment 0002_PLANS.pdf | ||
| W9127N23B0011 OWCM23 Amendment 0002.pdf | ||
| W9127N23B0011 OWCM23 Amendment 0001.pdf | ||
| Wage Determination OR20230081.pdf | ||
| Wage Determination WA20230080.pdf | ||
| W9127N23B0011_OWCM23_ADVERTISE_PLANS.pdf | ||
| W9127N23B0011_OWCMD23_ADV_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED
5/23/2023
4. ISSUING OFFICE
DISTRICT ENGINEER
PORTLAND DISTRICT, CORPS OF ENGINEERS
P.O. BOX 2946
PORTLAND, OR 97208-2946
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE
(CHECK A, B, OR C AND COMPLETE
D, E, AND F.) A. OFFEROR B. OFFEROR B. OFFEROR
X A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY B. BID SECURITY B. BID SECURITY
(WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED
(INCLUDING PROFIT) YES YES YES
6. NUMBER OF ADDENDA ISSUED
7A.
ITEM E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
MANDATORY CLINS
0001 Mobilization and Demobilization 1 JOB 1,168,000.00$ 1,168,000.00$ 695,000.00$ 695,000.00$ 1,625,000.00$ 1,625,000.00$ 3,500,000.00$ 3,500,000.00$ 0002 Dredge/Placement Materials: Port Orford 0002AA First 11,000 CY 11,000 CY 11.90$ 130,900.00$ 9.00$ 99,000.00$ 10.50$ 115,500.00$ 25.00$ 275,000.00$ 0002AB Above 11,000 CY 8,000 CY 11.10$ 88,800.00$ 9.00$ 72,000.00$ 9.00$ 72,000.00$ 25.00$ 200,000.00$ 0003 Dredge/Placement Materials: Winchester Bay 0003AA First 17,000 CY 17,000 CY 12.30$ 209,100.00$ 11.00$ 187,000.00$ 27.00$ 459,000.00$ 15.00$ 255,000.00$ 0003AB Above 17,000 CY 9,000 CY 15.50$ 139,500.00$ 11.00$ 99,000.00$ 24.00$ 216,000.00$ 15.00$ 135,000.00$ 0006 Dredging/Placement of Materials: Baker Bay, RM 00+10+00 to
01+50+00 0006AA First 40,000 CY 40,000 CY 10.60$ 424,000.00$ 8.25$ 330,000.00$ 23.00$ 920,000.00$ 10.00$ 400,000.00$ 0006AB Above 40,000 CY 30,000 CY 9.00$ 270,000.00$ 8.25$ 247,500.00$ 20.00$ 600,000.00$ 10.00$ 300,000.00$ 0008 Dredging/Placement of Materials: Astoria Turning Basin 0008AA First 20,000 CY 20,000 CY 13.80$ 276,000.00$ 5.50$ 110,000.00$ 30.00$ 600,000.00$ 10.00$ 200,000.00$ 0008AB Above 20,000 CY 12,000 CY 12.70$ 152,400.00$ 5.50$ 66,000.00$ 25.00$ 300,000.00$ 10.00$ 120,000.00$ 0009 Dredging/Placement of Materials: Longview Turning Basin 0009AA First 2,000 CY 2,000 CY 19.10$ 38,200.00$ 13.50$ 27,000.00$ 30.00$ 60,000.00$ 20.00$ 40,000.00$ 0009AB Above 2,000 CY 2,000 CY 18.00$ 36,000.00$ 13.50$ 27,000.00$ 25.00$ 50,000.00$ 20.00$ 40,000.00$ 0011 Mobilization and Demobilization of Grizzly Screens 1 JOB 14,000.00$ 14,000.00$ 125,000.00$ 125,000.00$ 25,000.00$ 25,000.00$ 100,000.00$ 100,000.00$ 0012 Dredging/Placement of Materials: Transfer Site W-60.9-IW 0012AA First 110,000 CY 110,000 CY 27.10$ 2,981,000.00$ 9.50$ 1,045,000.00$ 19.50$ 2,145,000.00$ 16.00$ 1,760,000.00$ 0012AB Above 110,000 CY 22,000 CY 22.20$ 488,400.00$ 9.50$ 209,000.00$ 17.00$ 374,000.00$ 16.00$ 352,000.00$ 0015 Dredging/Placement of Materials: Transfer Site W-60.9-IW 0015AA First 10 Tons 10 LONG
TON
2,014.00$ 20,140.00$ 1,200.00$ 12,000.00$ 375.00$ 3,750.00$ 1,000.00$ 10,000.00$
0015AB Above 10 Tons 10 LONG
TON
942.00$ 9,420.00$ 1,200.00$ 12,000.00$ 375.00$ 3,750.00$ 1,000.00$ 10,000.00$
SUBTOTAL FOR MANDATORY LINE ITEMS 6,445,860.00$ 3,362,500.00$ 7,569,000.00$ 7,697,000.00$
OPTIONAL CLINS
0004 Incremental Moblization Depot Slough 1 JOB 168,000.00$ 168,000.00$ 100,000.00$ 100,000.00$ 300,000.00$ 300,000.00$ 1,000,000.00$ 1,000,000.00$ 0005 Dredging/Placement of Materials: Depot Slough 0005AA First 30,000 CY 30,000 CY 18.20$ 546,000.00$ 13.25$ 397,500.00$ 25.00$ 750,000.00$ 15.00$ 450,000.00$ 0005AB Above 30,000 CY 25,000 CY 17.00$ 425,000.00$ 13.25$ 331,250.00$ 22.00$ 550,000.00$ 15.00$ 375,000.00$ 0007 Dredging/Placement of Materials: Baker Bay, RM 01+50+00 to
03+10+00 0007AA First 5,000 CY 5,000 CY 8.90$ 44,500.00$ 8.25$ 41,250.00$ 23.00$ 115,000.00$ 10.00$ 50,000.00$ 0007AB Above 5,000 CY 7,000 CY 5.60$ 39,200.00$ 8.25$ 57,750.00$ 20.00$ 140,000.00$ 10.00$ 70,000.00$ 0010 Dredging/Placement of Materials: Port of Longview 0010AA First 7,000 CY 7,000 CY 32.00$ 224,000.00$ 13.50$ 94,500.00$ 30.00$ 210,000.00$ 20.00$ 140,000.00$ 0010AB Above 7,000 CY 6,000 CY 13.60$ 81,600.00$ 13.50$ 81,000.00$ 25.00$ 150,000.00$ 20.00$ 120,000.00$ 0013 Dredging/Placement of Materials: Transfer Site W-60.9-IW 0013AA First 23,000 CY 23,000 CY 28.40$ 653,200.00$ 6.50$ 149,500.00$ 19.50$ 448,500.00$ 16.00$ 368,000.00$ 0013AB Above 23,000 CY 9,000 CY 21.00$ 189,000.00$ 6.50$ 58,500.00$ 17.00$ 153,000.00$ 16.00$ 144,000.00$ 0014 Dredging/Placement of Materials: Transfer Site W-60.9-IW 0014AA First 10,000 CY 10,000 CY 33.9 339,000.00$ 6.50$ 65,000.00$ 19.50$ 195,000.00$ 16.00$ 160,000.00$ 0014AB Above 10,000 CY 6,000 CY 23.70$ 142,200.00$ 6.50$ 39,000.00$ 17.00$ 102,000.00$ 16.00$ 96,000.00$ 0016 Remote Video Monitoring System 1 JOB 29,000.00$ 29,000.00$ 4,000.00$ 4,000.00$ 30,000.00$ 30,000.00$ 15,000.00$ 15,000.00$ 0017 Dredging/Placement of Materials: Old Mouth Cowlitz 0017AA First 6,000 CY 6,000 CY 12.00$ 72,000.00$ 5.75$ 34,500.00$ 27.00$ 162,000.00$ 15.00$ 90,000.00$ 0017AB Above 6,000 VY 2,000 CY 11.40$ 22,800.00$ 5.75$ 11,500.00$ 24.00$ 48,000.00$ 15.00$ 30,000.00$
SUBTOTAL FOR OPTIONAL LINE ITEMS 2,975,500.00$ 1,465,250.00$ 3,353,500.00$ 3,108,000.00$
9,421,360.00$ 4,827,750.00$ 10,922,500.00$ 10,805,000.00$
NSN 7540-01-150-0981 STANDARD FORM 1419 (10-3)
Camenzind Dutra JV LLC 792 Montrose Ave Palo Alto, CA 94303 91G72
NO.2NO.1
Oregon and Washington Clamshell Maintenance Dredging 2023
7B. DESCRIPTION OF OFFERED ITEM D.
TOTAL
ACCEPTANCE LIMITATION - DAYS
INFORMALITIES
HME Construction, Inc.
6801 NW Old Lower River Rd Vancouver, WA 98660 1KNC1
ABSTRACT OF OFFERS 1. SOLICITATION NO.
W9127N23B0011
3. DATE OPENED
6/22/2023 1 OF 1
PAGE
American Construction Co., Inc 1501 Taylor Way Tacoma, WA 98421 0E2Z8
IGE
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE
9. OFFERS
NO.3
| 2023-06-22T14:56:04-0700 | |
| FLORES.KRISTEL.MADARIAGA.1280597402 |
| 2023-06-22T15:03:33-0700 | |
| SMOTHERS.ANDREA.KATHERINE.1243096681 |
File details come from the government source that posted it. Updated .