A.03 GPR - Deep Drawdown Drawings Amendment 0003.pdf

PDF 11 MB Posted

Attached to
Green Peter Reservoir Generator Purchase and Install
Solicitation number
W9127N23B0010
Issued by

About this file

This file appears to be an amendment to drawings related to the federal contract opportunity for the Green Peter Reservoir Generator Purchase and Install solicitation issued by the Department of the Army Corps of Engineers Engineering District Portland. The solicitation seeks offers for the purchase and installation of a generator at the Green Peter Reservoir. Offerors are required to submit proposals by the date specified in the solicitation to be considered for award. The amendment provides revised drawings for the generator installation and respondents should incorporate these deep drawdown drawings into their responses. The solicitation is an unrestricted opportunity open to all responsible sources and proposals will be evaluated based on best value determinations made by the agency.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATEREVISION BY

SHEET

DESCRIPTION

SUBMITTED:

CORPS OF ENGINEERS U.S. ARMY

CHIEF, ENGINEERING DIVISION

DATE

DESIGNED BY

DRAWN BY

ELECTRICAL

CHECKED BY

EML

APPROVED:

CORPS OF ENGINEERS, U.S. ARMY

NORTH PACIFIC DIVISION, PORTLAND, OREGON

SCALE AS SHOWN SPEC. NO.

FOR DIV. ENGINEER

GREEN PETER RESERVOIR

POWERHOUSE ELECTRICAL

PREPARED:

HEAD, SECTION

CHIEF, HYDRO-ELECTRIC DESIGN BRANCH

25 NOV. 64

JJC

EMBEDDED CONDUIT & GROUNDING

HMF

WHR

AS CONSTRUCTED

DATE BY

HYDRO ELECTRIC DESIGN BRANCH, NPD

1970 OCT 12

KEY PLAN

24 NOV 65 WHR

WDK

3 MAY 65

AS CONSTRUCTED

GPP-1.1-6-1A1/7

b

G P

P

A

GRAPHIC SCALES

B

B

C C A A

S T

A

S T

A

S T

A

S T

A

0CONNECT TO DAM

GROUND STUBBED

OUT AT EL 729.25

G.I. EL. 732.0

TOWER FOOTING

UPSTREAM WALL

FD2

EL 734.0

AEQ11-1-X

EL 734.0

SEE DWG 2A1/10

FOR CONTINUATION

CONTR JT

STA 20+80

SEE DWG 2A1/9

FOR CONTINUATION

CONCRETE INSERTS

SEE NOTE 3

G.I. EL 732.0

SEE DETAIL A

GI

OUTLINE OF WALL BELOW

SEE NOTE 3

GI GI

SQ-e1-CE1, 1"

SEE DETAIL B

SJ6-e1-CE1, 1"

SJ8-e1-CE1, 1"

GI

SEE NOTE 3

SEE NOTE 3

AEQ11-1-X, EL 734.0

TRT-q1, 1"

AEQ11-1-X

EL 734.0

CQ1-q3, 2"

TO CRANE RAIL

BLOCK OUT & ROOF

STRUCTURE SEE SEC B-B

UNISTRUT P-3257

FD2

EL 734.0

SEE DWG. 2A1/10 FOR CONTINUATION

AEQ21-3-XX, EL 734.0

UNISTRUT P-3257

52171, EL 729.75

S T

A

FD3 EL 735

TB1-t1.1, 1"

TO EXISTING CONDUIT

JB3, EDWARDS, #349 BOX

EL 745 (SEE DWG 1A3/1)

DOWN STREAM WALL

TO EXISTING CONDUIT

CONNECT #2/0 GROUND

CABLE TO EXISTING #2/0

GROUND AT EL 730.0

#2/0 GROUND CABLE-EXTEND

UP TO CRANE RAIL BLOCKOUT

SEE SECTION B-B

B

B

AEQ21-3-XX

EL 734.0 AEQ11-1-V, EL 743.75

CONNECT TO EXISTING CONDUIT

AEQ21-6-XX, EL 734.0

CONTR. JT.

STA. 21+25.

AEQ11-1-X

EL 734.0

PLAN EL. 730

CONTR JOINT AT

STA 21+25

21'-2" TO

D D

EL. 747.25

UNISTRUT

P3255

SECTION C-C

(SEE NOTE 2)

SECTION D-D

CQ1-q3, 2"

SECTION A-A

BRIDGE CRANE TROLLEY EMBEDDED SUPPORTS

(SEE NOTE 2)

T O

P H

W A

L L

8"-11.5# CHANNEL

CR1-r15, 1"-R37, SEE DWG 2A1/9

DETAIL A

NO SCALE

DETAIL B

NO SCALE

SEE NOTE 3

CONDUITS STUBBED

FLUSH IN CEILING BELOW

1" CONDUIT SLEEVE FOR

NITROGEN TUBING

10"-15.3# CHANNEL

S T

A

S T

A

EL. 747.25UNISTRUT TYPE P-3255

STUB OUT 5 FEET

STA. 20+83-UPSTREAM WALL

STA. 20+77-DOWNSTEAM WALL

SEE DETAIL L DWG 1A13/1 FOR

ROOF STRUCTURE GROUNDING

EL. 768.25-UPSTREAM WALL

EL. 767.0-DOWNSTREAM WALL

EL. 766.5

(UPSTREAM WALL ONLY)

STA. 20+87.25 & STA. 20+98

STUB OUT

SEE DWG 2A1/10

#6

#2/0

STUB OUT FOR RAIL BOND

SEE DETAIL K DWG-1A13/1

EL. 753.5

#2/0

(UPSTREAM WALL ONLY)

EL. 745.

SECTION B-B

(SEE NOTE 2)

DRAWING NO.

GPP-1.1-6-1A3/1 130

SHEET NO.

150GPP-1.1-6-1A13/1

GPP-1.1-6-2A1/9 180

REFERENCE DRAWINGS

1.

NOTES

FOR GENERAL NOTES AND LEGEND SEE DWG GPP-1.1-6-1A0/1.

2. WALLS IN PLAN VIEW CUT OFF AT EL 745. SECTIONS A-A, B-B

AND C-C SHOWS AREA ABOVE.

3.

MOUNTED FLUSH IN THE CEILING BELOW.

GPP-1.1-6-2A1/10 181

8 52 5453 55 76 81 84

4'-5"11'-9" 24" 2'-6"9'-0"

6'-0"

3'-9"2'-3"

10'-0" 4"

6'-0"8'-6"8'-6"13'-0"

" 5'-5" 12"

5'-9†"2'-0"

3'-8"

11'-8"4'-2"11'-0"

6'-8"10'-0"6'-0"

4'-6"

11'-4"

3'-0" 16'-0"

5'-6"

6'-0"6'-0"

7'-0"

21'-2"

3'-6"3'-6" 24"

5'-5"2'-10"

15"

8'-0"

PH-s8, 1•"

PH-s7 1•"

CQ3-q10.1, 1‚"

CQ1-c3.2, ƒ"

CQ3-q2, ƒ"

CQ1-c3, ƒ"

TRT-r1, 1‚"

24"

SQ4-q4, ƒ"

CQ4-q7.1, 1‚"

CQ4-q7.2, 1‚"

JR2-u1, ƒ"

CQ3-q5.1, 1‚"

CQ3-q5, 1‚", CONNECT

JB2-t1-JB3, ƒ", CONNECT

CQ3-Q5.2, 1‚"

CQ1-c3.1, ƒ"

10'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"7'-0"

30°

SJ7-a1-XW1, 1•"

SJ7-a1-XW1, 1•"

XW1-s1, 1•"

SJ7-v1-XW1, 1•"

XW1-s4, 1•"

XW1-s5, 1•"

SJ7-a2-XW1, 1•"

SJ7-c2-XW1, 1•"

XW1-c2, 1•"

XW1-s3, 1•"

SJ7-a1-T, 1•"

SJ7-a2-T, 1•"

SJ7-c1-T, 1•"

SJ7-c2-T, 1•"

SJ7-u1-T, 1•"

SJ2-u1-T, 1•"

SJ2-e1-T, 1•"

T-s1, 1•"

T-s2, 1•"

T-s3, 1•"

TRT-r1, 1‚"

T-s4, 1•"

SCALE: 1•"=1'-0"

SCALE: 1•"=1'-0"

SCALE: …"=1'-0"

SCALE: ‰"=1'-0"

ADDED G.I TO TOWER FOOTINGS, CEILING INSERTS

TRANSFORMER DECK &

POWERHOUSE WALLS-EL 730

4' 0 4' 8' 12

‰"=1'-0"

…"=1'-0"

4' 4'0

6" 6"0"

1•"=1'-0"

12" 12"3"9"

SJ12-e1-CE1, 1"

C O

N T

R

J

T

C O

N T

R

J

T

C O

N T

R

J

T

CQ1-q6, ƒ"

#2/0 GROUND CABLE

CQ3-q6, ƒ"

CQ4-q3.1, 1‚"

12 OCT 70

P-3255 20"

MIDDLE SANTIAM RIVER, OREGON

DELETED CC CONDUITS, REVISED DET. A & DET. B

2ƒ" ƒ

4"

ALL CEILING INSERTS ARE TO BE UNISTRUT TYPE P-3257

SCALE: ‰"=1'-0"

AND ROOF STRUCTURE.

250 MCM

500 MCM

500 MCM

DAI4 20 MAY 2014 ELECTRICAL REVIEW FOR COMPLIANCE UPGRADE

GP-65-414-30_REV-3
GP-65-414-31_REV-4
GP-65-414-32_REV-2
GPD-10.0-4-2_REV-9
GPP-1.1-0-0_1
GPP-1.1-0-0_7
GPP-1.1-0-0-2
GPP-1.1-6-0A11-1_REV-3
GPP-1.1-6-1A8-1
GPP-1.1-6-1A8-3_REV-1
GPP-1.1-6-1A51-3_REV-4
GPP-1.1-6-9A21-1
GPP-1.1-6-9A40-1
GPP-9-6-9A31-2
GPP-10.1-6-1A11-2
GPP-10.1-6-1A21-2_REV-5

File details come from the government source that posted it. Updated .