C.04_Bid Abstract_MCR_SIPD.pdf

PDF 368 KB Posted

Attached to
Mouth of the Columbia River Sand Island Pile Dikes Repair
Solicitation number
W9127N22B0001
Issued by

About this file

This bid abstract summarizes offers received in response to a solicitation seeking construction services to repair four pile dikes at the Mouth of the Columbia River in Oregon. The solicitation was issued by the U.S. Army Corps of Engineers Portland District and sought mandatory line items including pile demolition, enhanced enrockment, and pile installation work. Three offers were received by the September 19, 2022 closing date from Duwamish-Pacific JV, Advanced American Construction, and an unnamed bidder. Offer prices ranged from $31.7 million to $39.9 million for the base scope. The abstract records unit prices and totals for each bidder against the line items. The contract specialist and contracting officer signatures indicate the abstract will be used to evaluate the offers received for this pile dike rehabilitation project.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1

8/19/2022 9/19/2022

4. ISSUING OFFICE

DISTRICT ENGINEER

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2

D, E, AND F.) A. OFFEROR Duwamish-Pacific JV A. OFFEROR Advanced American Const.

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY B. BID SECURITY

X (WITHOUT PROFIT) 20% of bid price 20% of bid price

C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED

(INCLUDING PROFIT) Yes Yes

6. NUMBER OF ADDENDA ISSUED 1

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED

NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

MANDATORY LINE ITEMS

0001 Mobilization and Demobilization 1 Job 2,189,000.00$ 2,189,000.00$ 4,995,000.00$ 4,995,000.00$ 3,643,000.00$ 3,643,000.00$ 0002 Pile Dike 6.37 Timber Pile Demolition 1 Job 884,500.00$ 884,500.00$ 2,960,000.00$ 2,960,000.00$ 1,700,000.00$ 1,700,000.00$ 0003 Pile Dike 6.37 Enhanced Enrockment 1 Job 8,354,500.00$ 8,354,500.00$ 5,690,000.00$ 5,690,000.00$ 9,700,000.00$ 9,700,000.00$ 0004 Pile Dike 6.37 Pile Installation 1 Job 6,281,400.00$ 6,281,400.00$ 9,050,000.00$ 9,050,000.00$ 4,500,000.00$ 4,500,000.00$ 0005 Pile Dike 4.01 Timber Pile Demolition STA 06+50 to 13+85 1 Job 68,400.00$ 68,400.00$ 1,100,000.00$ 1,100,000.00$ 270,000.00$ 270,000.00$ 0006 Pile Dike 4.01 Enhanced Enrockment 1 Job 2,233,600.00$ 2,233,600.00$ 1,650,000.00$ 1,650,000.00$ 2,400,000.00$ 2,400,000.00$ 0007 Pile Dike 4.01 Pile Installation 1 Job 4,832,000.00$ 4,832,000.00$ 5,800,000.00$ 5,800,000.00$ 3,400,000.00$ 3,400,000.00$ 0008 Pile Dike 4.47 Timber Pile Demolition STA 01+50 to 14+00 1 Job 236,400.00$ 236,400.00$ 1,450,000.00$ 1,450,000.00$ 700,000.00$ 700,000.00$ 0009 Pile Dike 4.47 Enhanced Enrockment 1 Job 2,784,900.00$ 2,784,900.00$ 2,000,000.00$ 2,000,000.00$ 3,500,000.00$ 3,500,000.00$ 0010 Pile Dike 4.47 Pile Installation 1 Job 3,864,900.00$ 3,864,900.00$ 5,200,000.00$ 5,200,000.00$ 2,600,000.00$ 2,600,000.00$

31,729,600.00$ 39,895,000.00$ 32,413,000.00$

0011 Incremental Mobilization - Pile Dike 4.01 Shore Connection 1 Job 1,135,400.00$ 1,135,400.00$ 225,000.00$ 225,000.00$ 560,000.00$ 560,000.00$ 0012 Pile Dike 4.01 Shore Connection Timber Pile Demolition 1 Job 143,800.00$ 143,800.00$ 285,000.00$ 285,000.00$ 560,000.00$ 560,000.00$ 0013 Pile Dike 4.01 Shore Connection 1 Job 2,150,800.00$ 2,150,800.00$ 1,285,000.00$ 1,285,000.00$ 1,700,000.00$ 1,700,000.00$ 0014 Incremental Mobilization - Pile Dike 4.47 Shore Connection and

Revetment 1 Job 1,132,100.00$ 1,132,100.00$ 130,000.00$ 130,000.00$ 560,000.00$ 560,000.00$

0015 Pile Dike 4.47 Shore Connection Timber Pile Demolition 1 Job 41,100.00$ 41,100.00$ 40,000.00$ 40,000.00$ 39,000.00$ 39,000.00$ 0016 Pile Dike 4.47 Shore Connection 1 Job 91,500.00$ 91,500.00$ 100,000.00$ 100,000.00$ 85,000.00$ 85,000.00$ 0017 East Sand Island Revetment 1 Job 2,227,700.00$ 2,227,700.00$ 800,000.00$ 800,000.00$ 2,500,000.00$ 2,500,000.00$ 0018 Incremental Mobilization - Pile 5.15 Shore Connection 1 Job 4,130,300.00$ 4,130,300.00$ 220,000.00$ 220,000.00$ 560,000.00$ 560,000.00$ 0019 Pile Dike 5.15 Shore Connection Timber Pile Demolition 1 Job 131,100.00$ 131,100.00$ 245,000.00$ 245,000.00$ 660,000.00$ 660,000.00$ 0020 Pile Dike 5.15 Shore Connection 1 Job 2,814,600.00$ 2,814,600.00$ 1,500,000.00$ 1,500,000.00$ 2,000,000.00$ 2,000,000.00$ 0021 Incremental Mobilization - Pile Dike 5.15 Options 1 Job 432,700.00$ 432,700.00$ 125,000.00$ 125,000.00$ 870,000.00$ 870,000.00$ 0022 Pile Dike 5.15 Timber Pile Demolition STA 08+80 to 21+86 1 Job 392,200.00$ 392,200.00$ 325,000.00$ 325,000.00$ 430,000.00$ 430,000.00$ 0023 Pile Dike 5.15 Enhanced Enrockment 1 Job 3,209,800.00$ 3,209,800.00$ 1,645,000.00$ 1,645,000.00$ 3,500,000.00$ 3,500,000.00$ 0024 Pile Dike 5.15 Pile Installation 1 Job 4,361,300.00$ 4,361,300.00$ 4,970,000.00$ 4,970,000.00$ 2,600,000.00$ 2,600,000.00$

54,124,000.00$ 51,790,000.00$ 49,037,000.00$

9. OFFERS

CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

ABSTRACT OF OFFERS

W9127N22B0001

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

Optional CLINs

MCR Sand Island Pile Dike Repairs

7B. DESCRIPTION OF OFFERED ITEM 7C. EST D.

TOTAL

Mandatory CLINs Subtotal

8444 NW St. Helens Road

Portland, OR 97231

DUNS: C2SKL5QBJRD3 CAGE: 0KCV5

6627 Ellis Avenue South

Seattle, WA 98108

UEI: NX9TDPGHC1L1 CAGE: 8D9U2

NSN 7540-01-150-0981 1419-101 STANDARD FORM 1419 (10-3)

2022-09-20T16:30:14-0700
ELLOSO.HARRON.EMERSON.1261817361
2022-09-21T17:23:55-0700
MORROW.KRISTINA.KAYE.1290513320