This solicitation package seeks bids for the John Day Lock and Dam trashrack rehabilitation project. The U.S. Army Corps of Engineers Portland District will rehabilitate 18 trashracks at the dam under a total small business set-aside. The NAICS code is 332312 for metal tank and vessel manufacturing with a size standard of 500 employees. Interested parties should submit bids to the Contracting Officer and Contract Specialist by the deadline stated in the solicitation. The work includes dry blasting the existing trashracks, welding and fabrication of replacement components, and installation. The plans provide structural details, sections, and drawings of the trashracks and their components to guide bid responses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the follow ing:

- Section L to provide guidance for obtaining copies of the Main Unit Inspection Videos.

- Section M to reflect the basis of aw ard found in Provision 52.214-10 in Section L.

- Specification Section 05 05 to note potential presence of lead coating.

- Correct plan sheets revised to reflect correct w eld size.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N21B0014

X 9B. DATED (SEE ITEM 11)

21-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-May-2021

CODE

USACE, PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N21B0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS FOR OFFERORS

All inquiries regarding this solicitation are to be submitted via ProjNet-Bidsm. Telephone and email inquiries will not be accepted. ProjNet-Bidsm is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answers by USACE. ProjNet-Bidsm can be accessed through ProjNetsm at https://www.projnet.org/projnet/. To access the ProjNet-Bidsm website the first time:

1) Click the Bid tab

2) Click Bidder Inquiry. (The Agency is USACE.)

3) Enter the following information for access:

The Bidder Inquiry Key: 5822M2-DYGS96 Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)

Establish secret question and answer which will be used as a password. (required on first project only)

4) For subsequent access use your email address, the Bid Inquiry Key and response to the secret question to access the ProjNet-Bidsm Module.

5) Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

6) For a specific step-by-step for POSTING YOUR INQUIRIES, is available in the Reference link on the Contract Viewer.

7) For questions about the ProjNet-Bidsm, please contact the Call Center help desk toll free at 1-800-428- HELP, which operates from 8AM to 5PM (Central US time zone). ProjNet-Bidsm questions can also be emailed to the helpdesk at staff@rcesupport.com. No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bidsm prior to bid submission. Nothing in the solicitation is changed unless an amendment is sent out.

DoD Secure Access File Exchange (SAFE). Due to the file size of the Main Unit Inpsection Video(s) referenced in Specification Section 01 11 00.00 25, 1.2.2 Work Requirements, these will be provided using DoD SAFE. If you wish to obtain a copy of these, please provide the receiptient’s email address to the contract specialist, michael.e.saldana@usace.army.mil and you will receive a message with a secure link and additional guidance to download.

SUBMISSION OF BIDS

Bidders shall submit their bids via email to the following individuals by no later than the date and time established in Block 9 of the Standard Form (SF) 33, or Block 14 of the most recently issued SF 30 as applicable:

Mitchell Johnson, Contracting Officer Mitchell.J.Johnson@usace.army.mil Michael Saldana, Contract Specialist Michael.E.Saldana@usace.army.mil

Each email shall contain the following information:

Solicitation No. W9127N21B0014 Bid Due Date and Time: ______ Bid Validity Date: ______ (90 days from the bid due date)

Bids received after the date and time stated within Block 9 of the SF33, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a bid, the offeror must make every effort to ensure its electronic submission is virus-free.

Bidders should enter a description for every file submitted. For files over 20 megabytes (MB) the bidders shall break the file into smaller files sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e. “email one of four”). Once all of the emails submitted have been received the Government will confirm receipt via responsive email. If a bidder submits multiple bids the Government will only consider the last bid submitted prior to the bid due date and time.

Do not assume submission will be instantaneous. File size and number of files submitted shall be considered.

Bidder/Teammate/Subcontractors should allow adequate time for submission completion because the entire bid (i.e.

bidders’ submission and all teammate/subcontractor(s) independent submissions) must be received by the bid due date and time specified in Block 09 of SF 33, or SF 30 as applicable.

Electronic submission of bids satisfies the requirement set forth in Block 9 of the SF 33 (‘…Sealed offers in original and ___ copies…”). Additionally, electronic submission of the bid guarantee, when a bid guarantee is required, is due with the bid submission. Mailing a bid guarantee for submission is not allowed.

BID OPENING

Bidders are advised there will NOT be a physical bid opening held for this invitation for bids. The bid opening will be held telephonically via conference call at 3:00 pm on the date bids are due. Due to the requirement that bids be submitted electronically only, the bid opening is scheduled to take place one hour following the bid due date and time of 2:00 pm in order to allow the contracting office time to download all bid documents submitted. The USACE Portland District will not accept any hard copy documentation submitted in response to this invitation for bids.

Bidders wishing to participate in the telephonic bid opening shall email a list of participants to both Contracting Officer (Mitchell.J.Johnson@usace.army.mil) and Contract Specialist (Michael.E.Saldana@usace.army.mil ) no later than the close of business 24 hours prior to the bid due date and time. Please reference “W9127N21B0014 John Day Trashrack Bid Opening” in the email subject line. A responsive email will be sent to the bidder which will include confirmation of the list of participants, the conference call-in telephone number, and the security passcode for participants to utilize for the telephonic bid opening.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been added by full text:

BASIS OF AWARD

The contract which results from this IFB will be awarded on the basis of price and price related factors in accordance with FAR Part 14.

(End of Summary of Changes)

SECTION 05 05 23.16 26

STRUCTURAL STEEL WELDING AND FABRICATION

05/14

PART 1 GENERAL

This Section covers general workmanship requirements, applicable to the fabrication and inspection of various items of metalwork and machine work, which includes but is not limited to the new transformer and oil containment installation. These requirements are in addition to those contained in the specification Sections covering the specific items of work or as shown. This specification is to be used for all steel welding and fabrication on this job as shown in the contract drawings and as specified in this contract. For additional information and directions regarding existing trashracks, refere to Section 01 11 00.00 25, SUMMARY OF WORK.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)

ANSI/ASNT CP-189 (2016) ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel (ANSI/ASNT CP-105-2006)

AMERICAN WELDING SOCIETY (AWS)

AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination

AWS A3.0M/A3.0 (2020) Standard Welding Terms and Definitions

AWS D1.1/D1.1M (2020) Structural Welding Code - Steel

AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors

ASME INTERNATIONAL (ASME)

ASME B4.1 (1967; R 2009) Preferred Limits and Fits for Cylindrical Parts

ASTM INTERNATIONAL (ASTM)

ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip

Galvanized Coatings

ASTM E165/E165M (2018) Standard Practice for Liquid Penetrant Examination for General Industry

ASTM E709 (2015) Standard Guide for Magnetic Particle Examination

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:

SD-01 Prefabrication Submittals

Fabricator's Welding Quality Control Plan; G, EC, HDC

Witness Points; G, EC, HDC

Welding Procedure Specifications (WPS); G, EC, HDC

Procedure Qualification Records (PQR); G, EC, HDC

Welder Performance Qualification Records (WPQR); G, EC, HDC

SD-03 Product Data

Pre-Qualified Welding Procedures; G, EC, HDC

Materials List; G

Welding Electrodes and Rods; G

Shielding Gas; G

Nonconformance Reports; G, EC, HDC

Heat Straightening Procedure; G

SD-06 Test Reports

NDT Equipment Calibration Records; G

Material Test Reports; G, HDC

Test and Inspection Report; G, EC, HDC

Fabrication Quality Control Reports; G

Fabrication Record; G

SD-07 Certificates

Qualification Of Welders And Welding Operators; G

Inspector Qualifications; G, EC

1.3 DEFINITIONS AND SYMBOLS

Use symbols in accordance with AWS A2.4 terms and definitions in accordance with AWS A3.0M/A3.0, unless otherwise indicated.

1.4 QUALITY ASSURANCE

1.4.1 Fabricator's Welding Quality Control Plan

Before the start of work, submit a Fabricator's Welding Quality Control Plan for approval. Ensure the plan describes the methods, equipment, and procedures utilized to ensure quality control including but not limited to material tracking, weld tracking, NDT equipment calibration, non-conformance reports, weld repair, and inspection witness points.

1.4.1.1 NDT Equipment Calibration Records

Submit NDT Equipment Calibration Records for all NDT equipment used by both the fabricator and any subcontractors performing NDE.

1.4.1.2 Inspection Witness Points

Establish Witness Points for the necessary Quality Assurance (QA) Inspections and prepare a detailed schedule showing the progression of work and completion of components with the Witness Points identified. The extent of completion and details and the date of the QA Inspections will be determined at the Prefabrication Conference by the Government after discussion with the Contractor. Update the inspection witness point schedule weekly and provided by e-mail to the Contracting Officer (CO).

Give the CO two weeks minimum notice prior to the predetermined date for the Initial QA Inspection, including adjustments for changes in schedule.

At minimum, include fit-up prior to welding, NDE prior to painting, shop dimension verification, field dimension verification, and functional testing in the hold points considered.

1.4.2 Welding Procedure Specifications

a. Submit Welding Procedure Specifications (WPS), with supporting Procedure Qualification Records (PQR) and all supporting test documentation on forms similar or equivalent to the sample forms found in AWS D1.1/D1.1M, Annex M for each weld even if the procedure is considered prequalified. Welding Procedure Specifications must be approved by the Government prior to the start of any fabrication and must be individually identified and referenced on the shop drawings. If a welding procedure is to be qualified by testing, a representative of the Government will witness the test plate welding and the mechanical testing.

b. Approval of any procedure, however, will not relieve the Contractor of the responsibility for producing a finished structure meeting all requirements of these specifications. A current Certified Welding Inspector (CWI) must approve all WPS's and PQR's. Post approved WPS's at all work stations where welding is occurring so that the welder, QC staff, and Government QA staff have access to the WPS's.

1.4.2.1 Previous WPS Qualifications

Welding procedure specifications previously qualified by testing may be accepted for this contract without re-qualification, upon receipt of the test results, if the following conditions are met:

a. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.

b. The qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.

c. The qualified welding procedure, procedure qualification record, PQR notes, and supporting testing documentation are submitted and approved by the Government.

1.4.2.2 Pre-qualified Welding Procedures

Submit Pre-qualified Welding Procedures which comply with AWS D1.1/D1.1M for approval. Submit for approval a listing or an annotated drawing to indicate any joints for which pre-qualified weld procedures will be used.

1.4.2.3 Retests

If welding procedure fails to meet the requirements of AWS D1.1/D1.1M, revise and re-qualify the procedure specification, or at the Contractor's option, welding procedure may be retested in accordance with AWS D1.1/D1.1M.

If the welding procedure is qualified through retesting, submit all test results, including those of test welds that failed to meet the requirements, with the welding procedure.

1.4.3 Welder, Welding Operator, and Tack Welder Qualification

a. Submit Welder Performance Qualification Records (WPQR) for each welder, welding operator, and tack welder to the Government for approval prior to the start of any fabrication. Submit WPQR's on forms similar or equivalent to the sample forms found in AWS D1.1/D1.1M, Annex M with all pertinent data filled out.

b. Welders, welding operators, and tack welders must be approved by the Government prior to working on this project. Each welder, welding operator, and tack welder assigned to work on this contract must be qualified in accordance with the applicable requirements of AWS D1.1/D1.1M and as specified in this section. Welders and welding operators who have made acceptable procedure qualification test welds within the last six months will be considered qualified for the welding procedure used.

c. Before assigning any welder, welding operator, or tack welder to work under this contract, submit the names of the welders, welding operators, and tack welders to be employed, and certification that each individual is qualified as specified. State in the certification the type of welding and positions for which the welder, welding operator, or tack welder is qualified, the code and procedure under which the individual is qualified, the date qualified, and the name of the firm and person certifying the qualification tests. Submit Qualification of Welders and Welding Operators for approval in accordance with AWS D1.1/D1.1M for each welder stating the type of welding and position qualified for, the code and procedure qualified under, date qualified, and the firm and individual certifying the qualification tests.

1.4.3.1 Previous Welding Personnel Qualifications

At the discretion of the Contracting Officer, welders, welding operators, and tack welders qualified by test within the previous six months may be accepted for this contract without re-qualification if all the following conditions are met:

a. Copies of the Welder Performance Qualification Records are submitted and approved in accordance with the specified requirements.

b. Testing was performed by an approved testing laboratory, technical consultant, or the Contractor's approved quality control organization.

c. The previously qualified welding procedure conforms to the requirements of this specification and is applicable to welding conditions encountered under this contract.

d. The welder, welding operator, and tack welder qualification tests conform to the requirements of this specification and are applicable to welding conditions encountered under this contract.

1.4.3.2 Renewal of Welding Personnel Qualification

Re-qualification of a welder or welding operator is required under any of the following conditions:

a. It has been more than six months since the welder or welding operator has used the specific welding process for which he is qualified.

b. There is specific reason to question the welder or welding operator's ability to make welds that meet the requirements of these specifications.

c. The welder or welding operator was qualified by an employer other than those firms performing work under this contract.

d. A tack welder who passes the qualification test is considered eligible to perform tack welding indefinitely in the positions and with the processes for which he/she is qualified, unless there is some specific reason to question the tack welder's ability. In such a case, the tack welder is required to pass the prescribed tack welding test.

e. The Government determines the welder, welding operator, or tack welder's performance is not in conformance with the applicable welding code and/or the contract specifications.

1.4.4 Inspector Qualifications

Quality control personnel can be assigned to more than one task, provided they are qualified and able to fully perform the duties of each position.

Individual(s) responsible for quality assurance/quality control may not serve as or report to production management. If the ability of QC is in doubt, the Government reserves the right to have QC personnel removed from the project.

a. All inspectors, performing weld inspection in accordance with these specifications, must be currently qualified and certified in conformance with AWS QC1. The Contractor must provide an AWS Certified Welding Inspector (CWI) as the primary point of contact for quality control of welding. When several CWI and NDT technicians are working, one primary individual must be designated as having primary responsibility for all quality control in accordance with AWS D1.1/D1.1M and this specification. Non-certified inspectors and certified associate weld inspectors (CAWI) must not be used for inspection under these specifications.

b. All personnel performing Non-Destructive Testing (NDT) must be qualified in accordance with ANSI/ASNT CP-189 and be a current level II or III for each applicable method. In the event that a level III will be performing NDT, a level II practical examination (conducted within the last three years) will be required in addition to the level III qualifications. Submit level II qualification/certification documentation in a format similar to Appendix C: Sample Certification Form ANSI/ASNT CP-189. Submit qualifying level III certification as provided by ASNT.

c. The nondestructive examination of welds and the evaluation of examination tests as to the acceptability of the welds shall be performed by a 3rd party testing agency adequately equipped and competent to perform such services. Written approval of the examination procedures is required. Notify the Government prior to any testing. The evaluation of examination tests shall be subject to the approval of, and all records shall become the property of, the Government.

PART 2 PRODUCTS

2.1 MATERIALS

Provide all materials and material documentation as shown in the Contract Documents. Submit a materials list and material test reports for all materials used in this project.

2.2 WELDING EQUIPMENT AND MATERIALS

Provide all welding equipment, welding electrodes and rods, welding wire, shielding gas, and fluxes capable of producing satisfactory welds when used by a qualified welder or welding operator performing qualified welding procedures. Provide welding equipment and materials that comply with the applicable requirements of AWS D1.1/D1.1M. Submit product data on welding electrodes and rods and shielding gas.

PART 3 EXECUTION

3.1 FABRICATION

3.1.1 Structural Fabrication

a. Material must be straight before being laid off or worked. If necessary, straighten by methods that will not impair the metal. Sharp kinks or bends are cause for rejection of the material. Make bends by approved dies, press brakes or bending rolls. Finished members must be free of twists, bends, and open joints.

b. Do not commence welding until shop drawings, welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and approved. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved.

c. Where heating is required, take precautions to avoid overheating the metal and allow to slowly cool in still air in a manner that will not adversely impair the original properties of the metal.

d. Cut structural steel to meet the dimensions as required on the approved shop drawing and to obtain an accurate profile with a surface that is smooth and free from cracks and notches. Limit flame cutting to low carbon, non-heat treated steels used for structural applications with the exception of structural bolt hole installation. Approve all other flame cutting prior to use and clearly indicate locations on shop drawings. Shearing must be accurate and all portions of the work neatly finished. Corners must be square and true unless otherwise shown. Re-entrant cuts must be filleted to a minimum radius of 3/4 inch unless otherwise approved. Cut steel and fabricate steel plates and splice plates for major structural components so the primary direction of rolling is parallel to the direction of the main tensile or compressive stresses.

e. Break all cut edges and corners with 1/16-inch radius to eliminate sharp edges. Bolts, nuts, and screws must be tight.

3.1.2 Dimensional Tolerances for Structural Work

Measure dimensions by an approved measuring system. Submit the measuring system for approval with the work plan. The overall dimensions of an assembled trashrack are required to be within the tolerances indicated on the drawings or as specified for the item of work. Where tolerances are not specified in other Sections of these specifications or shown on drawings, a variation of 1/32 inch is permissible in the overall length of component members with both ends milled and component members without milled ends are not permitted deviate from the dimensions shown by more than 1/16 inch for members 30 feet or less in length and more than 1/8 inch for members over 30 feet in length based on a structure temperature of 70 degrees F. A fabricated member must not vary from straight or from its intended curvature by more than its length divided by 960.

3.1.3 WELDING OPERATIONS

3.1.3.1 Welded Connections

Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved. Do not begin welding until welding procedures, inspectors, nondestructive testing personnel, welders, welding operators, and tackers have been qualified and approved.

3.1.3.2 Welding Equipment

Provide all welding equipment, electrodes, welding wire, fluxes, preparatory tools and equipment, and any other accessories required to perform the work.

3.1.3.3 Welding Process

Conform workmanship and techniques for welded construction to the requirements of AWS D1.1/D1.1M. Welding of Structural steel must be by an electric arc welding process using a method which excludes the atmosphere from the molten metal and must conform to the applicable provisions of AWS D1.1/D1.1M for all welds. Welding must be such as to minimize residual stresses, distortion and shrinkage.

3.1.3.4 Preparation of Base Metal

Prior to welding, inspect surfaces to be welded to assure compliance with the applicable Clauses of AWS D1.1/D1.1M.

3.1.3.5 Tack and Temporary Welds

Make tack and temporary welds required for fabrication and erection in accordance with AWS D1.1/D1.1M under the controlled conditions prescribed herein for permanent work. Tack welds that are to be incorporated into the permanent work are subject to the same quality requirements as the permanent welds. In making temporary welds, do not strike arcs outside weld locations. Remove each temporary weld as required by AWS D1.1/D1.1M.

3.1.3.6 Weld Backing Removal

Unless otherwise indicated, remove all steel weld backing material from welded joints prior to testing. Identify all weld backing material that cannot be removed on the shop drawings for approval.

3.1.3.7 Weld Backing

Qualify all weld backing material, other than steel, by testing and include in submitted PQR/WPS. Variation from approved weld backing material will not be permitted and will require the development and testing a new weld procedure which addresses the change in backing material.

3.1.3.8 Preheat

Preheat will be in accordance with AWS D1.1/D1.1M, and this specification.

Do not weld at an ambient temperature below 32 degrees F, or when moisture is present in the area of welding. Do not weld in wind greater than 5 mph or when the surfaces are wet or exposed to precipitation. Verify the minimum temperature of the base metal in the area of welding and adjacent to welding.

3.1.3.9 Interpass Temperature

In a multi-pass weld, ensure the temperature of the weld metal is within acceptable interpass temperatures per AWS D1.1/D1.1M before the next pass is started.

3.1.3.10 Postweld Heat Treatment

Complete postweld heat treatment of weldments only as per the applicable Welding Procedure Specifications (WPS). Do not allow spot overheating or heating longer than the requirements in the WPS.

3.1.3.11 Wrap Welds

Wrap and seal welds are required to prevent pack rust in welded joints for submerged structures. Show all wrap welds on the shop drawings and perform all wrap welds as shown. Wrap welds, when called for on the drawings, are the minimum size fillet weld as required in AWS D1.1/D1.1M or the size of the primary fillet weld as shown. In addition, wrap welds may require wrapping around reentrant corners that is specifically prohibited in AWS D1.1/D1.1M. All wrap welds are subjected to the same testing requirements required for a fillet weld as required within this specification.

3.2 INSPECTION/NONDESTRUCTIVE EXAMINATION (NDE)

3.2.1 Inspection

a. Maintain an approved inspection system and perform required inspections. Submit Test and Inspection Report(s) for each weld examination. Document nonconformances in writing and submit a Nonconformance Reports documenting any deviation from the QCP, approved shop drawings, code, Work Plan and/or specifications.

b. Perform fabrication/erection inspection to ensure that materials and workmanship meet the minimum requirements of the Contract documents.

c. Final acceptance of all welded joints will be by the CO.

d. When doubt exists as to the soundness of any material part; such part may be subjected to any form of nondestructive testing that will thoroughly investigate the part in question as determined by the CO.

Any defects may be cause for rejection and rejected parts are required to be replaced and retested at the Contractor's expense.

e. After weld joints have been satisfactorily completed by the Contractor and accepted by the CO, clean the joint area to a bright, unpitted, and unscarred surface and protect in accordance with the applicable Contract documents.

f. Generate weekly fabrication quality control reports that include records of visual inspection, nondestructive testing progress, weld tracking log, dimensional checks, and a summary of Nonconformance Reports for the period in question. Submit Nondestructive Testing reports as soon as they are produced. Submit and distribute weekly Fabrication Quality Control Reports as agreed between the fabricator, Contractor, Government Quality Assurance Representative and Contracting Office.

g. Submit a complete Fabrication Record for each structure fabricated.

Include all inspection records, weld tracking logs, control dimensions, material certifications and other documentation in hard copy bound format and electronic pdf format in the completed fabrication record.

The document is a complete record of each individual structure fabricated.

3.2.2 Methods of Non-Destructive Examination (NDE)

Perform NDE examination/inspection of structural steel weldments as required below.

3.2.2.1 Visual Inspection (VT)

Perform 100 percent visual examination of all completed welds by an approved CWI. Clean and carefully examine welds for insufficient throat or leg sizes, cracks, undercutting, overlap, excessive convexity or reinforcement, and other surface defects to ensure compliance with the requirements of AWS D1.1/D1.1M. Enhance Visual Inspection (VT) for cracks and other discontinuities with a magnifying lens of 5X power wherever required to discern indications or defects otherwise not clear. Measure size and contour of welds with suitable gages.

3.2.2.2 Magnetic Particle Inspection (MT)

Perform MT for 100 percent of welds for all members attaching to lifting lugs. Perform MT or PT for 25 percent of partial penetration and fillet welds. Randomly select welds and joints in addition to any welds indicated on the drawings to determine conformance with paragraph STANDARDS OF ACCEPTANCE, AWS D1.1/D1.1M, and with ASTM E709 or ASTM E165/E165M as applicable.

3.2.2.3 Ultrasonic Inspection (UT)

Perform UT for 100 percent of complete joint penetration welds to determine conformance with paragraph STANDARDS OF ACCEPTANCE and AWS D1.1/D1.1M.

3.3 BLASTING OF EXISTING TRASHRACKS

Dry-blast clean all surfaces of each of the 18 trashrack in accordance with SSPC SP 6/NACE No.3 Commercial Blast. Before blast cleaning, visible deposits of oil, grease, debris, or other contaminants shall be removed in accordance with SSPC-SP 1 or other agreed-upon methods. Use appropriate abrasive blast media to give an angular anchor tooth pattern. If recycled blast media is used, maintain an appropriate particle size distribution. Do not use steel shot or other abrasives that do not produce an angular profile. Follow the Safety and Health Provisions and the Environmental Protection provided in Section 09 97 02.13 26, PAINTING - HYDRAULIC STRUCTURES. Because of the age of the trash racks the assumption is that the existing coating contains lead.

3.4 STANDARDS OF ACCEPTANCE

Conform dimensional tolerances for welded construction, details of welds, and quality of welds with the applicable requirements of AWS D1.1/D1.1M and the approved shop drawings.

3.5 GOVERNMENT INSPECTION AND TESTING

When the soundness of any weld is suspected of being deficient due to faulty welding or stresses that might occur during shipment or erection, the Government reserves the right to perform nondestructive supplemental examinations before final acceptance to the extent determined by the CO.

The costs of such inspection and testing will be borne by the Contractor if unsatisfactory welds are discovered, or by the Government if the welds are satisfactory. The work may be performed by the Government's own forces or under a separate contract for inspection and testing.

3.6 CORRECTIONS AND REPAIRS

3.6.1 Welded Joint Repair

If inspection or testing indicates defects in the weld joints, repair defective welds using a qualified welder or welding operator as applicable.

Defects caused by shipping and handling or due to latent defects that were not caught at shop inspection must be corrected at the Contractor's expense inclusive any shipping costs. Make corrections in accordance with the requirements of AWS D1.1/D1.1M, the approved repair procedures, and the specifications. Repair defects discovered between passes before additional weld material is deposited. Wherever a defect is removed and repair by welding is not required, blend the affected area into the surrounding surface to eliminate sharp notches, crevices, or corners. After a defect is thought to have been removed, and before re-welding, examine the area by suitable methods to ensure that the defect has been eliminated. Repaired welds must meet the inspection requirements for the original welds.

3.6.2 Heat Straightening

When steel weldments are warped during fabrication, or due to shipping and handling, and do not conform to dimensional requirements then the weldments must be repaired or replaced at no additional cost to the Government.

Straighten material without shearing, fracturing, stressing, or damaging bolts, welds, or base metal. Do not heat straighten the metal unless allowed by the Engineer of Record. If allowed and before performing any straightening operations, submit a Heat Straightening Procedure to the engineer for review and approval for any application where heat may be applied to correct or remedy dimensions. Do not heat metal to temperatures greater than 1000 degrees F. The use of cutting heads will not be permitted for heating and straightening. After heating and straightening, allow the metal to slowly cool in still air to ambient before inspecting for evidence of fracture or other damage. Replace material damaged during straightening operations with new material at no additional cost to the Government. If the Engineer determines it is not acceptable to straighten a weldment or a member of that weldment, remove the bent material from the assembly, straighten, and re-assemble, or replace the weldment, as required.

3.7 Discontinuity Acceptance In Base Metal

Where discontinuities in steel is observed during fabrication, replace the steel part with the discontinuity.

3.8 PROTECTION OF FINISHED WORK

3.8.1 Steel

Thoroughly clean machined surfaces of foreign matter. Protect all finished surfaces by suitable means. Oil and wrap unassembled pins and bolts with moisture resistant paper or protect by other approved means. Wash finished surfaces of ferrous metals to be in bolted contact with an approved rust inhibitor and coat with an approved rust resisting compound for temporary protection during fabrication, shipping and storage periods.

3.8.2 Shipping and Handling

Protect material from dirt, oil, and other foreign matter. Protect material so that water is not permitted to collect and pool. Employ handling methods that do not result in distortion or other damage to components during fabrication, assembly, loading, shipment, and unloading of components.

-- End of Section --

GENERAL

STRUCTURAL

NO.

SHEET

FILE NUMBER CADD FILE NAME TITLE DRAWING NUMBER TITLE

INDEX TO CONTRACT DRAWINGS INDEX TO REFERENCE DRAWINGS

®of Engineers

US Army Corps

P O

W E

R H

O U

S E

P O

R T

L A

N D

O R

E G

O N

G-002

J D

P .1

G -0

X X

X .d g n

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

T

J O

H N D

A Y L

O C

K A

N D D

A M

T R

A S

H R

A C

K R

E P

L A

C E

M E

N T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C O

L U

M B

IA

R

IV

E R

H Y

D R

O E

L E

C T

R

IC

D

E S

IG

N C

E N

T

R

A

N S I

D

B J

A H

A N

G

IR

I, P .E

B

S

T O

L T P .E

IN

D

E X T

O D

R A

W

IN

G S

J D

P .1

-0 /2

G-003

G-002

G-001

JDP-1.113-0/3

JDP-1.113-0/2

JDP-1.113-0/1

JDP1.113_G-003XXX.dgn

JDP1.113_G-002XXX.dgn

JDP1.113_G-001XXX.dgn

CONTRACTOR STAGING AREA

INDEX TO DRAWINGS

PROJECT LOCATION AND VICINITY MAPS

S T

E V

E N R

M

IL

E S P .E

P

H A

R P

O L

U.S. ARMY CORPS OF ENGINEERS

JDP-1.1-5-2/3

JDP-1.1-4-0/2

JDP-1.1-4-0/1

JDP-1-5-1/1

JDP-1-4-4/50

JDP-1-4-2/14

JDP-1-4-2/8

JDP-1-4-0/4

JDP-1-4-0/3

JDP-1-4-0/2

JDP-1-4-0/1

JDP-1-3-2/4

JDP-1-3-1/8

INTAKE TRASH RACKS

GENERATOR BAYS - TRANSVERSE SECTION

GENERATOR BAYS - PLAN AT EL 185.0

INTAKE TRASH RACK GUIDES

GENERATOR BAYS-CONCRETE OUTLINE - TRASH RACK BLOCKOUTS

ASSY BAY-CONCRETE OUTLINE - TRANSVERSE SECTION

ASSY BAY-CONCRETE OUTLINE - PLAN EL 281.00 AT VISITORS LOBBY

INDEX TO DRAWINGS

STA. SERVICE AND ASSEMBLY BAYS - TRANSVERSE SECTIONS

GENERATOR BAYS - TRANSVERSE SECTIONS

PLAN AT EL 185.00

MAIN UNIT INTAKE TRASH RACK - LIFTING BEAM

15 TON TRASH RAKE CRANE

61 SECTIONS AND DETAILS - TRASH RACKS

PACIFIC CAR AND FOUNDARY COMPANY

S-502

S-501

S-401

S-101

S-003

S-002

S-001

JDP-1.113-5-6/5

JDP-1.113-5-6/4

JDP-1.113-5-6/3

JDP-1.113-5-6/1

JDP-1.113-5-0/3

JDP-1.113-5-0/2

JDP-1.113-5-0/1

JDP1.113_S-502XXX.dgn

JDP1.113_S-501XXX.dgn

JDP1.113_S-401XXX.dgn

JDP1.113_S-101XXX.dgn

JDP1.113_S-003XXX.dgn

JDP1.113_S-002XXX.dgn

JDP1.113_S-001XXX.dgn

DETAILS - PARTS & SUBSYSTEMS

DETAILS - VIEWS

ENLARGED VIEWS

INTAKE TRASH RACK DESIGN PLAN

GEOMETRIC DIMENSIONING & TOLERANCING

ALIGNMENT AND SLOT ARRANGEMENT

STRUCTURAL NOTES, ABBREVIATIONS, LOAD DIAGRAM, CONTROL DIMENSIONS, & GENERAL ISOMETRICS

W

N

B

/2

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

D R

A W

IN

G N

O

F

IL

E N

A M

E g2hdcbj9 Polygon g2hdcbj9 Line g2hdcbj9 Line g2hdcbj9 Line g2hdcbj9 Typewritten Text

G

F

E

D

C

B

A

1 2 3

1'-61/8" 2 3/4 "

5 1/2 "

LIFTING PIN

6"

TYP

1/4

N = � a:, GUIDE BAR --�;_;;��===�J==i==�===� =====:c=�

BAR 4" X 2"

BEARING ------j1f--)_ BAR 4" X 1/2"

END WEB PL

TYP

TYP

GUIDE BAR,

TYP 2 PLCS,

SEE S-502

TYP

1/4

1/4

1/4

5/16

5/16

E5

S-101

3/8

TYP

A

SECTION

SCALE: 1 1/2"=1'-0"

�---< CJP

BAR4" X2"

1/4

5/16

5/16

TIE BAR

9" X 1/2"

TYP

ALIGNMENT PIN, SEE S-502

ALIGNMENT PIN SHEAR PL,

ALIGNMENT PIN GUSSET,

TYP 2 PLCS, SEE S-502

BAR4" X2"

3/16

3/16

BOT 5/16

SIDES,

TYP 5/16

TYP

BEARING BAR

SLOT DIAPHRAGM

FOR ALIGNMENT PIN

BAR4" X3/8"

BAR4" X 1/2"

BAR 4" X 2" �-_ _u_ __ _/' ,---1---� 1 ,---�-

TOP WEB PL

FLOW

F

SECTION

SCALE: 1 1/2"=1'-0"

3 1/8"

1 9/16"

E1

S-101 3

TYP

LIFTING LUG

SEE S-502

5/16

5/16

5/16

6 7

1 '-2 7/8"

TYP

5/16

--fl-''%c-fu-�----------- ---------

TYP

5/16

5/16

TRASH BAR

ANGLED TIE BAR

BAR 4" X 2", TYP

5/16

5/16 a:, 'St

1'- 3/8"

FLOW

SECTION

SCALE: 1 1/2"=1 '-0"

TYP

BAR4"X2"

BAR4" X3/8"

3/16

3/16

D

1 1-811

5/16

5/16

FLOW

SECTION

TYP

SCALE: 1 1/2"=1'-0"

a:, LIFTING LUG

STIFFENER

PL, SEE S-502

ANGLED TIE BAR

9" X 1/2", TYP

2"

CJP

TYP

ALIGNMENT PIN, SEE S-501

ALIGNMENT PIN SHEAR PL,

SEE S-502

BAR4" X2"

ALIGNMENT PIN GUSSET,

TYP 2 PLCS, SEE S-502

BAR 4" X 3/8"

DIAPHRAGM PL

5/16

5/16

5/16

SECTION

SCALE: 1 1/2"=1'-0"

C") ' -�

8 9 10

1'-7 13/16" ffi

BAR4" X2"

EDGE OF

BEARING

BAR

TYP

I I I I =,-�======�·r==========

I I I I I

I _I I

I t 7

TIE BAR

9" X 1/2"

: �-----J :

L LJ LJ

E9

S-101 2

3 7/8 "WIDE BY

12" TALL SLOT

R 1 1/8 "TYP

3/16

3/16

BAR 4" X 2"

5/16

5/16

BAR 4" X 2" X 1"

4 SIDES >--���

5/16

ELEVATION

SCALE: 1 1/2"=1 '-0"

ALIGNMENT GUIDE,

SEE S-502

FLOW

I

____ J ----7

C1

S-101

SECTION

SCALE: 1 1/2"=1'-0"

NOTES:

END GUIDE SHOE

BEARING BAR

ALIGNMENT SLOT ONLY

IN BOTTOM CENTER

DIAPHRAGM PL

3/16

3/16

BAR4" X2"

BAR 4" X 2" X 1"

1. SEE GENERAL NOTES ON SHEET S-001.

2 . WRAP ALL WELDS.

US Army Corps of Engineers® ci " z� zo 0 cc i= N <( z

□� f- ...

LU N -N

u� :::,0 - "' (/) I::! 5 s: (/) � -0 (/)

0.

j..: � cc Q:; .• LU Cl (!) >- _J

LU Z cc 0 z <( z 0.

(!) I

I� - <( (/) -, LU

Cl CC Cl 0.

(/) c,:

w w

� I- z (!) U 0z - (!)W�w u.. (/) c,:

o;s o (fJ Cl 60. z z g; ::i ::i u f- f- >- c,: c,:

::;;00 c,: 0. 0.

=i

LU

0.

(/)LU

>::c,:

ci ·:M z 0 (0 z ,f, z� .g §; "--:f-g z � a: 0 0 !;J u ;;

u.i u..i C/J ui <( �Z"--:.. LU LU � j..: u.i

>- _J _J

0. cc - Cl ::;; - Cl cc 0.: u.. -, Cl f- LU C,: �

�z LU -'

>:: 0 - LU

u f-LU (fJ

::;;> CC LU w-N (fJI :::, f- _z u cc (/) (/) (/) <(

(/) c,:

c,: LU LU f-

LU Z

��z (!) z 0z (!) (!) LU - LU u.. (/) c,:

0 LU 0

(fJ Cl •

0. U Cl c,: - z 0 g: ::i u u f-

>- LU C,:

::;; _J 0

C,: LU 0.

<( �. Cl � >-::,I w Cl:'.

z w

SHEET ID

S-401

A M

E N

D E

D S

E C

T

IO

N D

E T

A

IL

W E

L D g2hdcbj9 Polygon g2hdcbj9 Line g2hdcbj9 Line g2hdcbj9 Line g2hdcbj9 Typewritten Text

Amended 0002_ JDA_Trash_Racks_Final_Plans.pdf
JDP1.113_G-001XXX
JDP1.113_G-002XXX
JDP1.113_G-003XXX
JDP1.113_S-001XXX
JDP1.113_S-002XXX
JDP1.113_S-003XXX
JDP1.113_S-101XXX
JDP1.113_S-401XXX
JDP1.113_S-501XXX
JDP1.113_S-502XXX

File details come from the government source that posted it. Updated .