The file's text, extracted by GovTribe without its formatting.
1 INTRODUCTION
| 1.1 Purpose |
| 1.2 Executive Summary |
| 1.3 Purpose |
| 1.4 Background |
| 1.5 Participants |
| 1.6 Engineer of Record |
| 1.7 Schedule |
| 1.7.1 Preliminary Construction schedule |
| 1.8 Trash Rack Description |
| 1.9 Trash Rack Lifting Beams and Cranes |
| 1.9.1 Trash Raking |
| 1.9.2 Trash Rack Lifting Beam |
| 1.9.3 Cranes Used |
| 2 SCOPE OF DESIGN WORK |
| 2.1 General |
| 2.2 Structural Work |
| 2.3 Mechanical Work |
| 2.4 Electrical Work |
| 2.5 Hydraulics |
| 2.6 Operations |
| 2.7 Quality Assurance |
| 2.8 Miscellaneous Work |
| 2.9 Independent HDC Review |
| 3 PLANS AND SPECIFICATION PACKAGE CONTENTS |
| 3.1 General |
| 3.2 Specifications Sections |
| 3.3 Drawings |
| 4 DESIGN CHANGES |
| 5 DESIGN |
| 5.1 Items designed by Inspection |
| 5.2 Design Concepts |
| 5.3 Project Preferences |
| 5.3.1 Project Requested Changes |
| 5.4 Design Standards |
| 5.5 Design Life |
| 5.6 Design Loads |
| 5.6.1 Intake Elevations |
| 6 HYDRAULIC STEEL STRUCTURE (HSS) |
| 6.1 Fracture Critical Member (FCM) |
| 6.2 Failure Critical Members |
| 7 MATERIAL FOR NEW RACKS |
| 8 ADDITIONAL INFORMATION |
| 8.1 Corrosion Prevention |
| 8.2 Storage Location |
| 8.3 Site Visit |
| 8.4 Agency Quality Control |
| 8.5 VE Studies |
| 9 APPENDIX A: TRIP REPORT |
| 10 APPENDIX B: SUPPORTING DESIGN CALCULATIONS |
| 10.1 APPENDIX B1: Main Horizontal Girder |
| 10.2 APPENDIX B2: Main Horizontal Girder - Redundancy Check for Fracture Critical Member |
| 10.3 APPENDIX B3: Section Lay Down |
| 10.4 APPENDIX B4: Trash Bar Calculations |
| 10.5 APPENDIX B5: Lifting Lug Design |
| 10.6 APPENDIX B6: Weld Design |
| 10.7 APPENDIX B7: Lifting Lug Bending out of Plane Bending |
| 10.8 APPENDIX B8: Weight and CG |
| 10.9 APPENDIX B9: Hydraulic Calculations (Performed by Amy K. Lynn) |
11 APPENDIX C: REFERENCE DRAWINGS