This modification amends a solicitation for a construction project to harden the control room and implement fire detection and control systems at the John Day powerhouse. The project aims to lengthen tenability of the control room during a fire event to allow for controlled shutdown and emergency operation. Fire detection will be installed in critical areas, the control room will have positive pressurization from an independent air supply, and fire alarm and status panels will provide annunciation. The modification updates specifications for fire detection and alarm systems and cybersecurity, and drawings M501 and A601. Feedback on the site visit, to be coordinated virtually due to COVID-19 restrictions, was due by December 14, 2020. The solicitation was issued by the U.S. Army Corps of Engineers Portland District for the John Day Control Room Fire Protection project under number W9127N-20-R-0037.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment serves to
1. Update Specif ication Section 28 31 64.00 25 FIRE DETECTION AND ALARM SYSTEMS
2. Add Specif ications Section 25 05 11.00 25 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
3. Update Draw ings M501 and A601
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N20R0037
X 9B. DATED (SEE ITEM 11)
08-Dec-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jan-2021
CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N20R0037
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION PAGE
Section 28 31 64.00 25 Paragraph 2.2.e.1 which previously read;
(1) Store operating data base firmware In a non-volatile memory and permanently installed on the system motherboard. Entry into the programming mode will be password protected to prevent unauthorized modification. Ensure the system is programmable by use of the software and pass code; on site or remotely using the reporting telephone line connections.
Will now read:
(1) Store operating data base firmware In a non-volatile memory and permanently installed on the system motherboard. Entry into the programming mode will be password protected to prevent unauthorized modification. Ensure the system is programmable by use of the software and pass code.
Section 28 31 64.00 25 Paragraph 2.5.2.l which previously read;
l. Alarm signal circuit: 24 V DC supervised circuit for all strobe lights on the system, all strobe lights are to be synchronized with in each building. The speakers are to transmit a simulated horn with the temporal 3-3-3 pattern utilized with the ability to have a voice message override an individual building, while maintaining the 3-3-3 in all the other buildings being evacuated. The strobe alarm pulse rate must be 120 pulse/min.
Will be deleted.
Project Table of Contents shall be updated to include the following;
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.00 25 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
Specification Section 25 05 11.00 25 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS is hereby incorporated into the project specifications
Drawings M501 and A601 have been updated.
ATTACHMENTS:
W9127N20R0037
1. 25 05 11.00 25.pdf - PROJECT TABLE OF CONTENTS and 25 05 11.00 25 CYBERSECURITY FOR
FACILITY-RELATED CONTROL SYSTEMS
2. M-X.XXXM-501XXX.pdf - Drawing M501
3. A-X.XXXA-601XXX.pdf - Drawing A601
(End of Summary of Changes)