This solicitation is for a construction project to implement fire protection upgrades at the John Day powerhouse control room. The project scope involves fire hardening the control room and its emergency egress, installing a positive air pressurization system from an independent supply, a master fire alarm control panel and operator interface, and multiple fire annunciation panels. Fire and smoke detection will also be installed in critical areas. The solicitation requests feedback on the plans and specifications by December 14th to ensure the government can provide requested images and videos of areas and equipment during the coordinated virtual site visit due to COVID-19 restrictions. The solicitation was released by the Department of the Army Corps of Engineers Engineering District Portland as solicitation number W9127N-20-R-0037 for the John Day Control Room Fire Protection project. The closing date for feedback on the plans and specifications was stated as December 14, 2020 at 2:00 PM PDT.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
SOURCE SELECTION SENSITIVE INFORMATION
Source Selection Information -- See FAR 2.101 and 3.104.
ATTACHMENT A
OFFEROR’S EXPERIENCE FORM
NAME OF OFFEROR: ____________________________________________________________________
PROJECT TITLE: ________________________________________________________________________
CONTRACT NUMBER: ___________________________________________________________________
GEOGRAPHIC LOCATION: _______________________________________________________________
CONTRACT AWARD AMOUNT (U.S. DOLLAR) $______________________________________________
FINAL CONTRACT AMOUNT (U.S. DOLLAR) $________________________________________________
CONTRACT COMPLETION DATE: __________________________________________________________
CONTRACT DURATION (PERIOD OF PERFORMANCE): ________________________________________
(If not complete, provide % currently complete)
DESCRIPTION OF THE PROJECT’S SCOPE AND MAGNITUDE: (The description should provide sufficient detail to demonstrate the similarities with the proposed project.)
DETAILS OF OFFEROR’S INVOLVEMENT IN THE PERFORMANCE OF THE PROJECT: (Include whether your firm participated as a prime, subcontractor, or joint-venture, and state percentage performed and whether performed as subcontractor or prime. Specifically describe your roles and responsibilities in the design/construction portion of the project and specific tasks accomplished that are similar to the solicitation requirement.
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/02.htm#P10_600 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/03.htm#P41_5833
File details come from the government source that posted it. Updated .