This document package includes engineering drawings and specifications for a federal contract opportunity to replace aging switchgear units and control panels at Bonneville Lock and Dam Powerhouse II in Oregon. The solicitation is being conducted by the U.S. Army Corps of Engineers Portland District on behalf of the Department of the Army. The project scope involves replacing the original 480V switchgear units and control panels in Powerhouse II, which are no longer supported due to being end-of-life components. Powerhouse II was completed in 1982 and the switchgear and control panels slated for replacement are the original equipment installed at that time. Replacing these critical electrical distribution components will improve reliability of power distribution to the hydropower generating units at Bonneville Dam Powerhouse II.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

T

U S A

R M

Y C

O R

P S O

F E

N G

IN

E E

R S

-1

-2

-1

-2

A N

S I F

S

W

T H A

V E

N U

E S

T E

P O

R T

L A

N D

O R

-1

H D

R E

N G

IN

E E

R

IN

G

IN

C

H D

R

H D

R

H D

R W

N

R

A S N

O T

E D

CQ1 & CQ2

BDP-1-6-1D21/3 - ELECTRICAL DIAGRAM - ONE LINE DIAGRAM -

REFERENCE DRAWINGS:

E-632 - CQ1 CONTROL SCHEMATICS - INSTALL

E-210 - CQ1 ELEVATION VIEW - INSTALL

COMPANION DRAWINGS:

ALARM CONTACT (TYP.)

5 5 5

50 50 45 45 20 150

SC

2 42

D

1EH1

2 42

C

1EH1

B

1EH1

3 42

A

1EH1

50 15

1 42

ETM

20 20

1SF

32KW 32KW 32KW

SW

DOOR

SW

DOOR

SW

DOOR

R

R

SW

DOOR

SFX 23X

42X

B

1HF1

A

1HF1

CAC-1 CONTROL PANEL

TE

A

HF1

A

HF1

B

HF1

B

HF1

1HW

TC

EP

WV

PACKS

POWER

BUS #1 BUS #2

KVA

KVA

39KW

SCR

HEATER EH-1

T R

A N

S F

T R

L

IG

H T

IN

G

T R

A N

S T

R

L

IG

H T

IN

G

S U

P P

L Y F

A N S

F -1

G O

V

A

IR

C

O M

P

N O .1

A N

N U

N C

IA

T

IO

N

SF1

S T

A R

T S

O F

T S

M C

E

W A

G E P

U M

P N

O .2

S E

W A

G E P

U M

P N

O .1

M O

N O

R A

IL

H

O

IS

T

C Q

-s

(S P

A R

E C

O N

D U

IT

C Q

-s

(S P

A R

E C

O N

D U

IT

C Q

-s

(S P

A R

E C

O N

D U

IT

C Q

-q

-P

A

(S P

A R

E C

O N

D U

IT

CQ1

3#12

"2

HV1-c3.2, 3#12

"2

HV1-c3, 2#12

",2

CAC1-R1-cR1, 3#12

"2

HV1-c2, 7#12

HV1-c1, 1"

2#12

"2

HV1-c1-TE, 4#12

"2

HV1-c1.1, "4

3HF1A-J1,

"4

3HF1A-J2,

"4

3HF1B-J1,

"4

3HF1B-J2,

3#12

"2

HV1-c3.3, 3#12

"2

HV1-c3.4, 2#12

"2

HV1-c3.5, 2#12

"2

HV1-c1-EH1, 3#12

"2

HV1-c3.1, 120 VOLT SUPPLY

E

P -c

Q

-s

(S P

A R

E C

O N

D U

IT

C Q

-s

(S P

A R

E C

O N

D U

IT

3 #500 KCMIL 3 #4/0

C Q

-q

-E

P

-q

/0

C Q

-q

-E

H

-q

-E

H

-q

-E

H

-q

-E

H

C Q

-q

/0

C Q

-q

-S

F

/0

-q

-A

A /4

-q

-F

T R

/4

C Q

-q

-T

R /4

C Q

-c

-S

F /2

-c

-H

V /2

-q

-H

W /2

-c

-H

W /2

B -U

-C

Q /4

-q

/2

SQ1-q2-CQ1, 2"SQ1-q1-CQ1, 3"

C Q

-q

-A

A /4

O

M P

N O .2

G O

V

A

IR

/0

225A

Q

-q

-C

Q

C Q

-q

.1 -T

H /4

70 125

P U

M P

C O

O L

IN

G W

A T

A

C C

H

IL

L

1.2

U N

K N

O W

N C

O N

D U

IT

N

A M

E /2

30KW

U N

K N

O W

N C

O N

D U

IT

N

A M

E /2

45 15

C Q

-q

.1 -B

C E

C Q

-q

.1 -B

C E

MCC CQ1

KVA

S E

E N

O T

E

B Y

P A

S S T

R A

N S

F O

R M

E R

-T

H I

N V

E R

T E

R

E N

O T

E S

(F

IS

H W

A Y

V

O L T O

U T

L E

T S

S E

E N

O T

E

C H

A R

G E

R N

O .1

V

O L T B

A T

T E

R Y

S E

E N

O T

E

R O

O M H

E A

T E

R S

G E

A R

B O

X R

E P

A

IR

S E

E N

O T

E

V

O L T O

U T

L E

T S

S E

E N

O T

E

C H

A R

G E

R N

O .2

V

O L T B

A T

T E

R Y

S E

E N

O T

E

B U

IL

D

IN

G

C Y

L

IN

D E

R S

T O

R A

G

-C

Q H

E A

D G

A

E N

O T

E

R O

O M H

O

IS

T

G E

A R

B O

X R

E P

A

IR

CABLE.

CONTRACTOR TO RE-USE EXISTING RACEWAY FOR NEW

CABLE LENGTHS ARE PROVIDED IN THE CABLE SCHEDULE.

FIELD VERIFY THE EXISTING CABLE ROUTING. ESTIMATED

SHALL COORDIANTE LOCATION OF LOAD WITH USACE AND

DRAWINGS NOT AVAILABLE DURING DESIGN. CONTRACTOR

NOT SHOWN ON THE PLAN VIEWS DUE TO EXISTING

WHERE NOTED, LOAD LOCATION AND CABLE ROUTING ARE 4.

NOTED OTHERWISE.

CONTRACTOR TO RE-USE EXISTING RACEWAY UNLESS 3.

INSTALL WIRING FROM MCC TO FIRST RECEPTACLE.2.

FOR GENERAL NOTES AND LEGEND SEE DRAWING G-005.1.

NOTES:

O N

E -L

IN

E D

IA

G R

A M

E-611

IN

S

T A

L L

C Q

E -X .X

X X

E -6

X X

X .d g n

E

PORTLAND DISTRICT

of Engineers

US Army Corps

D

C

A

B

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

1 2 3 4 5

B O

N N

E V

IL

L E L

O C

K A

N D D

A M

C O

L U

M B

IA

R

IV

E R

S E

C O

N D P

O W

E R

H O

U S

E

S U A

N D C

Q R

E P

L A

C E

M E

N

File details come from the government source that posted it. Updated .