BN2 SU-CQ Replacement_Contract Drawings final.pdf
PDF 31 MB Posted
- Solicitation number
- W9127N-20-R-0016
About this file
This federal contract opportunity solicitation seeks replacement of the SU and CQ feederboards at Bonneville Lock and Dam Powerhouse II. The U.S. Army Corps of Engineers Engineering District Portland is soliciting proposals to replace the original 480V panels at Powerhouse II, which are no longer being manufactured and are rated as marginally conditioned. Bonneville Dam is located 40 miles east of Portland, Oregon on the Columbia River and includes two powerhouses, Powerhouse 1 and Powerhouse 2, with a combined capacity of over 1,100 MW, in addition to spillway and navigation lock facilities. The replacement work is needed for the SU and CQ panels at Powerhouse II, which were not included in recent station service work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAWKA.MARK.J.
1229184926
Digitally signed by
SAWKA.MARK.J.1229184926
Date: 2020.06.22 15:18:07 -07'00'
Digitally signed by
MILES.STEVEN.ROBERT.1031191
Date: 2020.06.29 10:10:58 -07'00'
Digitally signed by
WELLS.ELIZABETH.ROGER.13876477
Date: 2020.07.09 15:02:55 -07'00'
DORF.AARON.LAW
RENCE.1028790380
Digitally signed by
DORF.AARON.LAWRENCE.10287
90380 Date: 2020.07.15 10:24:20 -07'00'
File details come from the government source that posted it. Updated .