G2_JD-STS_Reference_Dwgs_Government.pdf
PDF 12 MB Posted
- Attached to
- JOHN DAY LOCK & DAM POWERHOUSE SUBMERGED TRAVELING SCREEN (STS), NEW 130 TON GANTRY CRANE
- Solicitation number
- W9127N20R0005
About this file
This solicitation is for a new 130 ton gantry crane to replace the existing 90 ton crane at the John Day Lock and Dam powerhouse near Rufus, Oregon. The U.S. Army Corps of Engineers, Portland District is seeking the design, manufacture, transport, erection and testing of the new overhead crane. It must have variable speed control, interlocking operating modes and the ability to handle different loads and conditions. In addition, the contractor will demolish and remove the existing crane. The new crane must be assembled by April 15, 2022 and the existing crane removal is scheduled from August 1-31, 2022. Road access across the dam must be maintained during construction and demolition. The solicitation will use FAR Part 15.101-1 for a best value tradeoff source selection. The primary point of contact is the listed contract specialist and secondary contact is the contracting officer, both with the Portland District Corps of Engineers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shop As-Built Drawings will be available after contract award.
File details come from the government source that posted it. Updated .