YAQUINA: REQUESTED INFORMATION
Question:
4.16.4.2 – Spec indicates 4 coats of primer before 2 finish coats. Is this correct or is this a typo? Please verify AWL coating system.
Answer:
Correct. That is a typo. 2 coats of primer and 2 finish coats.
Question:
5.2.10 – “Internet” section in spec omitted from price sheet. Is service to be priced?
Answer:
Internet must be provided as a part of field office.
Question:
5.2.11 – Listed as “Internet” in spec, “Connect/Disconnect” in price sheet.
Answer:
Internet must be provided as a part of field office item 5.1.4 in the price sheet.
Question:
5.3.1 – Provide square footage for estimating of pump room bilge area to be degreased.
Answer:
Approximately 1200 square feet. Verify at ship check.
Question:
5.3.2 – Provide square footage for estimating of engine room bilge area to be degreased.
Answer:
Approximately 1400 square feet. Verify at ship check.
Question:
5.3.3 – Provide square footage for estimating of slops tanks area to be cleaned.
Answer:
Approximately 100 square feet for each tank. Verify at ship check.
Question:
5.4.4 – Coating weather decks not on price sheet. Is SOW to be included in proposal? Category A or B?
Answer:
Coating weather decks should be on price sheet at 100 sq ft increment. SOW is in spec paragraphs 4.16.4.3 and 5.4.4. Included in Category A, but quantity could change. Reflected on Amendment to the solicitation.
Question:
5.4.5 – Coating aluminum house not on price sheet. Is SOW to be included in proposal? Category A or B?
Answer:
Coating aluminum house in on the price sheet at 100 sq ft increments. SOW is in spec. Included in Category A but quantity could change. Reflected on Amendment to the solicitation.
Question:
5.5 – Provide sizes of non-GFP zincs
Answer:
The ZHS-23 is a commercial anode containing two cast-in galvanized steel mounting straps with 6" centers. It measures 6" x 1.25" x 12" and weighs approximately 23 pounds.
Question:
5.7 – How many shots of anchor chain are to be blasted and painted?
Answer:
Category B item. To be determined after visual inspection of anchor.
Question:
5.13 – Contractor furnished BOM indicates 22” sch 80 to be furnished. Is this a typo for 20”? Please verify material type desired.
Answer:
22” nominal SCH 80 has an ID of nearly 20” Material is listed in specifications. A 36 steel.
Question:
5.27-5.28 – SOW seems to count the 3 ballast tanks twice, once in each item. Is this the intent or should they only appear in one item or the other? Additionally, is the 2,000 gallon budget for all tanks combined or per tank?
Answer:
5.27 and 5.28 are 2 different work items. 5.27 states 4 tanks (port and stbd chain lockers and fore and aft ballast tanks.) 5.28 2,000 gallons is for all tanks.
Question:
5.35 – Is the new VestDavit unit GFM? If so, please provide a list of all components included as part of the GFM package that is to be transported from Portland, OR
Answer:
New Vestadavit is GFM. Components are included as a drawing titled “VD102960_rev1GFM.pdf”.
Question:35
5.36 – King Post Repair has provisions for engineering related to the “jib crane”. Please verify which piece of equipment is being indicated in this reference: the “hoist with track” shown in the forward view of the General Arrangement (also shown in the red circle of the below photo) or some other piece of equipment?
Answer:
Correct. It is shown with the red circle.
Question:
5.37 – Please verify the intent of the work scope in this section is to perform the 24K hour service “inframe” aboard the vessel, and not to remove the engines from the vessel. OEM indicates this service is commonly done in the shop as opposed to in the engine room.
Answer:
Correct. Service will be performed aboard the ship.
Question:
5.42 – Spec indicates procedures for overhauling 2 rudder assemblies as part of Category A work. In paragraphs 07 and 08 it seems to indicate these rudders are to be prepared for storage and shipped back to USACE Moorings. This specification section does not appear to cover removal and installation of
Answer:
Correct. Rudder assemblies being overhauled are spares which will be transported from our warehouse.
Question:
Could you also confirm the amperage required, the questionnaire lists 1200A, but 800A seems more in line with the size of vessel.
Answer:
800A is adequate for the Yaquina overhaul.