D.01.16_W9127N18R0052P00006Final.pdf

PDF 368 KB Posted

Attached to
FY18 SHIP REPAIR, MAINTENANCE AND OVERHAUL FOR USACE HOPPER DREDGE YAQUINA
Solicitation number
W9127N18R0052
Issued by

About this file

Amendment 0006 - Proposal due date extension

View the file

Other files

File Type Posted
D.01.16_W9127N18R0052P00007Final.pdf PDF
31_July_Site_Visit_Clarifications.docx DOCX document
31JulShipCheckSignInSheet.pdf PDF
D.01.16_W9127N18R0052P00005Final.pdf PDF
17JulShipCheckSignInSheet.pdf PDF
Drawings_4.zip ZIP file
Drawings_3.zip ZIP file
Drawings_1.zip ZIP file
Drawings_2.zip ZIP file
D.01.16_W9127N18R0052P00003Final.pdf PDF
Houston_Systems_B19691_Falk_Triple_Reduction_Gear_Box.pdf PDF
Houston_Systems_B-19693_Falk_Gear.pdf PDF
353-M420-0038_-_Gimbal_Winch_Motor_Weldment_Stbd-_D-17219_gimbal_winch_2013.dwg DWG drawing
D-17208_Drum_Details_Port_Side_Gimbal_Winch.pdf PDF
D-17213_Drum_Details_Draghead.pdf PDF
VD102960_rev01GFM.pdf PDF
D-17214_Draghead_Winch.pdf PDF
D-17204_Drum_Details_Starboard_Side_Gimbal_Winch.pdf PDF
17103-180-0A_Foudation_Details_by_EBDG.pdf PDF
Hundested_0-002-020933-2_MP700_Propeller_Hoved_Samling.pdf PDF
Hundested_1-022-020409-9_MP700-CPG120_Installation_Unit_6330-G1177.pdf PDF
Hundested_1-022-021126-2_MP700-CPG120_Installation_Unit_6331-G1178.pdf PDF
D-17202_Gimbal_Winch_Starboard_Side.pdf PDF
DTC_5241127_-_Sliding_Piece.TIF TIF image
Houston_Systems_B19692_Falk_Triple_Reduction_Gear_Box-_STBD.pdf PDF
DTC_5241115_-_Trunnion_Hull_Fitting_and_Guide_Tracks.pdf PDF
Houston_Systems_A-19697_FMC_Bearing.pdf PDF
353-E330-01_Main_Engine_&_Gear_Foundation_Modifications.pdf PDF
D-1441-2_Rev_G_Fire_Extinguishing_System.pdf PDF
353-E507-01REV-A_DREDGE_PIPE_ARRANGMENT.dwg DWG drawing
Hundested_0-002-020932-2_MP700_Propeller_Hoved_Samling.pdf PDF
YAQUINA_questions_answered.docx DOCX document
D.01.16_W9127N18R0052P00002Final.pdf PDF
D.01.16_W9127N18R0052P00001Final.pdf PDF
D.01.16_W9127N18R0052Final.pdf PDF
A.07.19_Subcontracting_Plan.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the proposal response date from 14 August 2018 to 31 August 2018.

POC David Dvorak (David.L.Dvorak@usace.army.mil 503-808-4633

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N18R0052

X 9B. DATED (SEE ITEM 11)

14-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2018

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N18R0052

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 14-Aug-2018 02:00 PM to 31-Aug-2018 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it.